M-5 -- Multan - Sukkur Motorway

3/12/2017

Bridge on Railway line Section 7 near Shujabad,Multan.

24232131_862704100578627_8470498240664517741_n.jpg




24296488_862704197245284_5719820181429084652_n.jpg





24774692_862704243911946_3190802387530707863_n.jpg




Girder Launching at Km 745+909.

23755074_854898181359219_3479035528143646882_n.jpg




23622059_854898251359212_6798508934710177486_n.jpg
 
Updates 22/12/2017.

Asphalt work starts at km 511+900.

25660163_770611616473344_8248405445160188812_n.jpg





25550539_770611656473340_3842773747511005701_n.jpg
 
26/12/2017.

Asphalt work started on Package 5 too.

26166635_326024274551932_2816927916103447009_n.jpg


25659954_326024287885264_5222174834981866399_n.jpg
 
Updates 31/1/2018.

At km 746+50. Asphalt Base Course work started.

27459795_1532901923496208_5495404205663542220_n.jpg




27067613_1532902010162866_6175090043107229307_n.jpg




27332394_1532903160162751_8362016899761084030_n.jpg




27336805_1532902876829446_4007100108859071913_n.jpg




27459117_1532903000162767_7784932243711232692_n.jpg


27459198_1532902080162859_4312115856438186490_n.jpg


25550396_1566562553411160_7165649199747441102_n.jpg
 
Updates 11/2/2018.

Subbase & roadbase along 392 km motorway are completed.

DVw_Vers_Vo_AA3yux.jpg




Asphalt base course has started.

DVw_Verv_VAAALEVa.jpg



Sutlej River Bridge (647m) in progress.

Sutlej.jpg
 
27867508_623191091358805_1994911988154261811_n.jpg



Updates 25/2/2018.

Concrete deck slab on 35 span long bridge.

28166778_1666009370102830_4249871435326847577_n.jpg




28276814_1666009403436160_8033513247022649418_n.jpg




28168099_1666009420102825_8625214818173903125_n.jpg




28167251_1666009443436156_8412707558713371923_n.jpg




28168738_1666009446769489_3491547594717721441_n.jpg
 
i am happy to see Chinese on every step . if they give money to Pakistanis our guys will et it all . we are corrupt till core
 
Satellite imagery of Shujabad Interchange (Jan 2018)

g9lr-m6kQkeaZeCd0EQiwxdayZBSi1CwfYifd67rMaLoSxfB_l-5qSNk1EIcz3wn7fmjtigS0S5qgQlxt9193xb_Ge15AQm-TWMdetstjSwM5uB3jrwZa-1qJusW0621jmeSTeerT8rAbNHtygCCzU9YAjjp3vmmd1_tdLrRc6bkfc346mpgZllomvWpnS6eGthMd-O8NgCa2z5GWqy01HuSNWSqBZZ2hHB3K-CRt0mZ4XH_QoTrqIDSsMB60kL5yTBme4H1AZnZevtLMXH0mEDPSnKazeBsc6derzRy8S6vCXp0vLLx6ni_imu77qusufQo_QoiTNtRvPiq-bqcASlu2_lJmZ0iZuiH7bsGV04QMwgp4xKfbzO2uIu2m36y1auEmm_jAxNhWNjeCd5__eA2KZX7zFjUaCpX_-NEE7XNCHI9D2s9LUIwFDH86cFj4fHsRKARL__P0zwAWAYRR80FeCyWVJQwv0xQmBKVmwdoWg8u_jZ9y-wOPxCTZeJcdwendiW8DrbBqfChniHEnunbYI0ehgsXEtZ0PfRpFvz4f6MYzTmZy9Q1KwF2Rw
 
M -5 (392 km from Multan to Sukkur) has connected with M4 at Multan city N5 interchange. Concrete is been casting by concrete pump equipment

DYOtLbqX4AAAerv.jpg




DYOtLbbXUAEIPqm.jpg





DYOtLWmWAAA-OAs.jpg





DYOtLYRW0AEDnSO.jpg
 
Subbase & roadbase along 392 km motorway are completed.


Why are they making this part of Motorway, along with many newer parts, higher and above the ground, if the reason is danger of flooding and to save it from flooding than this will results in more inundation of floods on the smaller villages alongsides as water will be blocked from a normal flow towards the downstream rivers and towards the sea...hope this is not the case, and water culverts and passage ways will do.
 