Quote: Originally Posted by
nadeem79
Thanks bro Sherjee278 for sharing information. Please guide us also about following points.
1. Which route you choose to reach Pull Bagar from Multan?
2. Is there any motorway patrolling on M4 from Pull Bagar to Gojra?
3. Have they restricted bikes on Pull Bagar to Gojra?
4. Is traveling safe in nights in this area even there is not yet proper fencing?
5. Have you seen any progress on pull bagar to kenewal?
.......................... Reply..
It's really surprising that M5 is going to open in august 2019 where as this 32KM patch will be opened in September 2019. What do you think??
1. We used Pull Bagar Interchange to Abdul Hakeem Bypass to Kacha Khu Route. The road isn't that great. Single and too much traffic now a days.
2. I was travelling just after sehri and motorway Police was patrolling at different points all along M-4 from Pull Bagar to Faisalabad. Means they patrol at night too.
3. There wasn't any bike to be seen during whole journey. Traffic rush is more on Pull Bagar/M-3-M-4 interchange section. IMO this section upto Shamkot interchange should be 6 lanes.
4. Fencing is done for most of the opened part and motorway section is safe for travelling at night too. There shouldn't be any issue in Pull Bagar to Kacha Khu route as almost all the heavy traffic and busses are using this route 24/7. Rush is a issue though.
5. Asphalt work / Lane marking was done on Pull bagar to Shamkot section as far as i could see from Pull bagar Interchange. Dumpers carrying asphalt were heading towards Kabirwala interchange side. Probably some part of this section is under the same contractor. Shamkot Interchange bridge on N-5 looks like complete too. Just asphalt remaining. Interchange work is slow. If the main carriageway is complete, all they have to do is to connect already used toll plaza of Shamkot using slip roads and open the motorway. Meanwhile they can complete the new toll plaza on other side of N-5.