What's new

Kaveri NG Engine : Developmental Gas Turbine Engines upto 130 kN thrust class at GTRE, Bangalore

PARIKRAMA

SENIOR MEMBER
Joined
Jan 5, 2014
Messages
4,871
Reaction score
185
Country
India
Location
India
Kaveri NG Engine : Developmental Gas Turbine Engines upto 130 kN thrust class at GTRE, Bangalore

Some points from a tender found in DRDO site


upload_2016-8-20_21-40-43.png




upload_2016-8-20_21-44-1.png



upload_2016-8-20_21-45-18.png


upload_2016-8-20_21-45-42.png


upload_2016-8-20_21-46-4.png

http://www.drdo. gov. in/drdo/drdojsp/downloadtndr.jsp? tenderName=18043&McrId=GTRE*Gas%20Turbine%20Research%20Establishment&p=RFINewTestCell130kN.pdf


So finally curtain is being raised..

Is this the reason Safran is also roped in via rafale offset deal?

Kaveri and Kaveri NG which eventually should power LCA (variants), future AMCA and may be Indian MII Jets...

Why would we want GE 414 when we can get all this done with investment of time and money by ourselves.. and now Safran investing makes that also taken care of .. Does it not showcase the game changer tipping point..

Why would you start this project unless the earlier one will soon roll out and go for the actual deployment? Unless that has been evaluated by someone like Safran and this point of Kaveri NG becomes their binding promise for Rafale MII orders...

Tagging all users. Enjoy.. Good days will come in our MIC soon...

@Abingdonboy @anant_s @Taygibay @Picdelamirand-oil @Vergennes @randomradio @Ankit Kumar 002 @MilSpec @Koovie @Echo_419 @Dash @hellfire @ito @SR-91 @AMCA @DesiGuy1403 @ranjeet @hellfire @fsayed @SpArK @AUSTERLITZ @nair @proud_indian @Roybot @jbgt90 @Sergi @Water Car Engineer @dadeechi @kurup @Rain Man @kaykay @Joe Shearer @Tshering22 @Dandpatta @danger007 @Didact @Soumitra @SrNair @TejasMk3@jbgt90 @ranjeet @4GTejasBVR @The_Showstopper @guest11 @egodoc222 @Nilgiri @SarthakGanguly @Omega007 @GURU DUTT @HariPrasad @JanjaWeed @litefire @AMCA @Perpendicular @Spectre@litefire @AMCA @Perpendicular@Ryuzaki @CorporateAffairs @GR!FF!N @migflug @Levina@SvenSvensonov @-xXx- @Perpendicular @proud_indian @Mustang06 @Param @Local_Legend @Ali Zadi @hellfire @egodoc222 @CorporateAffairs @Major Shaitan Singh @jha @SmilingBuddha @#hydra# @danish_vij @[Bregs] @Skillrex @Hephaestus @SR-91 @Techy @litefire @R!CK @zebra7 @dev_moh @DesiGuy1403 @itachii @nik141993 @Marxist @Glorino @noksss @jbgt90 @Skull and Bones @Kraitcorp @Crixus @waz @WAJsal @Oscar @AugenBlick @Star Wars @GuardianRED @others
 
.
Kaveri NG Engine : Developmental Gas Turbine Engines upto 130 kN thrust class at GTRE, Bangalore

Some points from a tender found in DRDO site


View attachment 327519



View attachment 327522


View attachment 327523

View attachment 327524

View attachment 327525
http://www.drdo. gov. in/drdo/drdojsp/downloadtndr.jsp? tenderName=18043&McrId=GTRE*Gas%20Turbine%20Research%20Establishment&p=RFINewTestCell130kN.pdf


So finally curtain is being raised..

Is this the reason Safran is also roped in via rafale offset deal?

Kaveri and Kaveri NG which eventually should power LCA (variants), future AMCA and may be Indian MII Jets...

Why would we want GE 414 when we can get all this done with investment of time and money by ourselves.. and now Safran investing makes that also taken care of .. Does it not showcase the game changer tipping point..

Why would you start this project unless the earlier one will soon roll out and go for the actual deployment? Unless that has been evaluated by someone like Safran and this point of Kaveri NG becomes their binding promise for Rafale MII orders...

Tagging all users. Enjoy.. Good days will come in our MIC soon...

@Abingdonboy @anant_s @Taygibay @Picdelamirand-oil @Vergennes @randomradio @Ankit Kumar 002 @MilSpec @Koovie @Echo_419 @Dash @hellfire @ito @SR-91 @AMCA @DesiGuy1403 @ranjeet @hellfire @fsayed @SpArK @AUSTERLITZ @nair @proud_indian @Roybot @jbgt90 @Sergi @Water Car Engineer @dadeechi @kurup @Rain Man @kaykay @Joe Shearer @Tshering22 @Dandpatta @danger007 @Didact @Soumitra @SrNair @TejasMk3@jbgt90 @ranjeet @4GTejasBVR @The_Showstopper @guest11 @egodoc222 @Nilgiri @SarthakGanguly @Omega007 @GURU DUTT @HariPrasad @JanjaWeed @litefire @AMCA @Perpendicular @Spectre@litefire @AMCA @Perpendicular@Ryuzaki @CorporateAffairs @GR!FF!N @migflug @Levina@SvenSvensonov @-xXx- @Perpendicular @proud_indian @Mustang06 @Param @Local_Legend @Ali Zadi @hellfire @egodoc222 @CorporateAffairs @Major Shaitan Singh @jha @SmilingBuddha @#hydra# @danish_vij @[Bregs] @Skillrex @Hephaestus @SR-91 @Techy @litefire @R!CK @zebra7 @dev_moh @DesiGuy1403 @itachii @nik141993 @Marxist @Glorino @noksss @jbgt90 @Skull and Bones @Kraitcorp @Crixus @waz @WAJsal @Oscar @AugenBlick @Star Wars @GuardianRED @others

TVC? Kits from Russia ? Wasn't there a news about co development of TVC kits which could be coupled with engines to give it TV capability ?
 
.
Kaveri NG Engine : Developmental Gas Turbine Engines upto 130 kN thrust class at GTRE, Bangalore

Some points from a tender found in DRDO site


View attachment 327519



View attachment 327522


View attachment 327523

View attachment 327524

View attachment 327525
http://www.drdo. gov. in/drdo/drdojsp/downloadtndr.jsp? tenderName=18043&McrId=GTRE*Gas%20Turbine%20Research%20Establishment&p=RFINewTestCell130kN.pdf


So finally curtain is being raised..

Is this the reason Safran is also roped in via rafale offset deal?

Kaveri and Kaveri NG which eventually should power LCA (variants), future AMCA and may be Indian MII Jets...

Why would we want GE 414 when we can get all this done with investment of time and money by ourselves.. and now Safran investing makes that also taken care of .. Does it not showcase the game changer tipping point..

Why would you start this project unless the earlier one will soon roll out and go for the actual deployment? Unless that has been evaluated by someone like Safran and this point of Kaveri NG becomes their binding promise for Rafale MII orders...

Tagging all users. Enjoy.. Good days will come in our MIC soon...

@Abingdonboy @anant_s @Taygibay @Picdelamirand-oil @Vergennes @randomradio @Ankit Kumar 002 @MilSpec @Koovie @Echo_419 @Dash @hellfire @ito @SR-91 @AMCA @DesiGuy1403 @ranjeet @hellfire @fsayed @SpArK @AUSTERLITZ @nair @proud_indian @Roybot @jbgt90 @Sergi @Water Car Engineer @dadeechi @kurup @Rain Man @kaykay @Joe Shearer @Tshering22 @Dandpatta @danger007 @Didact @Soumitra @SrNair @TejasMk3@jbgt90 @ranjeet @4GTejasBVR @The_Showstopper @guest11 @egodoc222 @Nilgiri @SarthakGanguly @Omega007 @GURU DUTT @HariPrasad @JanjaWeed @litefire @AMCA @Perpendicular @Spectre@litefire @AMCA @Perpendicular@Ryuzaki @CorporateAffairs @GR!FF!N @migflug @Levina@SvenSvensonov @-xXx- @Perpendicular @proud_indian @Mustang06 @Param @Local_Legend @Ali Zadi @hellfire @egodoc222 @CorporateAffairs @Major Shaitan Singh @jha @SmilingBuddha @#hydra# @danish_vij @[Bregs] @Skillrex @Hephaestus @SR-91 @Techy @litefire @R!CK @zebra7 @dev_moh @DesiGuy1403 @itachii @nik141993 @Marxist @Glorino @noksss @jbgt90 @Skull and Bones @Kraitcorp @Crixus @waz @WAJsal @Oscar @AugenBlick @Star Wars @GuardianRED @others
This there a time frame for this setup? Im sure everyone will not have an issue with DRDO as long they deliver on time!
 
.
Kaveri NG Engine : Developmental Gas Turbine Engines upto 130 kN thrust class at GTRE, Bangalore

Some points from a tender found in DRDO site


View attachment 327519



View attachment 327522


View attachment 327523

View attachment 327524

View attachment 327525
http://www.drdo. gov. in/drdo/drdojsp/downloadtndr.jsp? tenderName=18043&McrId=GTRE*Gas%20Turbine%20Research%20Establishment&p=RFINewTestCell130kN.pdf


So finally curtain is being raised..

Is this the reason Safran is also roped in via rafale offset deal?

Kaveri and Kaveri NG which eventually should power LCA (variants), future AMCA and may be Indian MII Jets...

Why would we want GE 414 when we can get all this done with investment of time and money by ourselves.. and now Safran investing makes that also taken care of .. Does it not showcase the game changer tipping point..

Why would you start this project unless the earlier one will soon roll out and go for the actual deployment? Unless that has been evaluated by someone like Safran and this point of Kaveri NG becomes their binding promise for Rafale MII orders...

Tagging all users. Enjoy.. Good days will come in our MIC soon...

@Abingdonboy @anant_s @Taygibay @Picdelamirand-oil @Vergennes @randomradio @Ankit Kumar 002 @MilSpec @Koovie @Echo_419 @Dash @hellfire @ito @SR-91 @AMCA @DesiGuy1403 @ranjeet @hellfire @fsayed @SpArK @AUSTERLITZ @nair @proud_indian @Roybot @jbgt90 @Sergi @Water Car Engineer @dadeechi @kurup @Rain Man @kaykay @Joe Shearer @Tshering22 @Dandpatta @danger007 @Didact @Soumitra @SrNair @TejasMk3@jbgt90 @ranjeet @4GTejasBVR @The_Showstopper @guest11 @egodoc222 @Nilgiri @SarthakGanguly @Omega007 @GURU DUTT @HariPrasad @JanjaWeed @litefire @AMCA @Perpendicular @Spectre@litefire @AMCA @Perpendicular@Ryuzaki @CorporateAffairs @GR!FF!N @migflug @Levina@SvenSvensonov @-xXx- @Perpendicular @proud_indian @Mustang06 @Param @Local_Legend @Ali Zadi @hellfire @egodoc222 @CorporateAffairs @Major Shaitan Singh @jha @SmilingBuddha @#hydra# @danish_vij @[Bregs] @Skillrex @Hephaestus @SR-91 @Techy @litefire @R!CK @zebra7 @dev_moh @DesiGuy1403 @itachii @nik141993 @Marxist @Glorino @noksss @jbgt90 @Skull and Bones @Kraitcorp @Crixus @waz @WAJsal @Oscar @AugenBlick @Star Wars @GuardianRED @others

Interesting .. few points:
a) Last year there was a tender to mesh a provided jet engine geometry and that too within one year. So a lot of design work is completed. But we always have problem is the performance in manufacturing.
b) Engine reliability is a big deal. We need to prove the reliability of the engine and the only way to do that is to actually fly it. so if we fly 8 hrs per day it will take , assuming a rated 3000hr life , 375 days. so maybe a year and half.
c)Yes Safran is investing. But the need for 414 will depend on how much M88 like our engine is. If a large part is M88 like everything will be over quick but if Safran develops our own design and M88 influence is less project will take more time.
d)We can just design our future jets around M88 and replace them with comparable GTRE engine there by cutting out GE all together after Mk1A.

Lots of variables in play actually.
 
. . .
I wouldn't count on a time frame for engines... this is a tech far too complex.
??

That is why the quote by @PARIKRAMA "now Safran investing makes that also taken care of .. Does it not showcase the game changer tipping point.." to which I agree with Him. Safran will be a game changer for us - Case and point : The Shakti Engines


I'm asking about THIS Setup the testing facility as mentioned in the tender!
 
. .
??

That is why the quote by @PARIKRAMA "now Safran investing makes that also taken care of .. Does it not showcase the game changer tipping point.." to which I agree with Him. Safran will be a game changer for us - Case and point : The Shakti Engines


I'm asking about THIS Setup the testing facility as mentioned in the tender!
Yeah Safran is there, but we need to absorb the tech and independently apply it. Just getting Safran to fix/improve Kaveri is not a solution. Hence I'm not confident about any timeframe.
 
. .
BS ......These guys just know how to develop a money making jet engine which stays only on ground.First of all we need to trim down GTRE and handover engine production to pvt sector.
Coming to those specs :A 2170 kg dry weight for 130 KN thrust,please go ahead and power an auto rick.
 
.
Yeah Safran is there, but we need to absorb the tech and independently apply it. Just getting Safran to fix/improve Kaveri is not a solution. Hence I'm not confident about any timeframe.
Safran help a Gas turbine will be developed for multiple uses of which the MII can use it to how it feels fit ! what is wrong with that. Agree about the lack of confidence for the Timeframe. Hence the Q.

BS ......These guys just know how to develop a money making jet engine which stays only on ground.First of all we need to trim down GTRE and handover engine production to pvt sector.
Coming to those specs :A 2170 kg dry weight for 130 KN thrust,please go ahead and power an auto rick.
THINK everyone is missing the point of the Tender is IT IS A TEST FACILITY !
GTSE is a DRDO Lab , it is to develop a working engine ! NOT TO produce
 
.
Safran help a Gas turbine will be developed for multiple uses of which the MII can use it to how it feels fit ! what is wrong with that. Agree about the lack of confidence for the Timeframe. Hence the Q.


THINK everyone is missing the point of the Tender is IT IS A TEST FACILITY !
GTSE is a DRDO Lab , it is to develop a working engine ! NOT TO produce

There is nothing wrong except I have doubts on how much tech can be absorbed by our guys... Again it is a pretty complex tech and I would not be confident unless GTRE make another varient without safran help.
 
.
There is nothing wrong except I have doubts on how much tech can be absorbed by our guys... Again it is a pretty complex tech and I would not be confident unless GTRE make another varient without safran help.
So its bad when we ask for help and Still bad if we don't ? and Still want everything to be done and delivered on time!. Wow we just can't please everybody

IF we could absorb and develop cryo engines , I'm Sure this gas turbine will do the same in the near future!
 
.
So its bad when we ask for help and Still bad if we don't ? and Still want everything to be done and delivered on time!. Wow we just can't please everybody

IF we could absorb and develop cryo engines , I'm Sure this gas turbine will do the same in the near future!
Don't be angry bro... just a fact ... we simply do not have the metallurgical and manufacturing expertise to straightaway completely absorb an Engine like M88. The challenges in jet engine are totally different than rockets.
I am just saying, it will be hard for us to get a handle on everything. Remember we had bofors spec and design since ages and still had metallurgy issues with desi guns. (there was a political component as well)
 
.

Pakistan Affairs Latest Posts

Country Latest Posts

Back
Top Bottom