What's new

JF-17 Thunder Multirole Fighter [Thread 6]

Status
Not open for further replies.
CAC installed in the Department of Plant "Fierce Dragon" production line active in such a team - the courage to challenge them, good tough fight, took over the production of one tough task - they just plant "Fierce Dragon" 2 -3 No. tank segment team.

  14 members of this team, with an average age of 38 years old, is responsible for the "Fierce Dragon" in the fuselage fuel tank assembly work 2-3 segments, has been called "the Department of loading the spine."

  "2.18" and "7.14"

  Mention the "Fierce Dragon" two batches of 18 deliveries, tank team members who will take pride in his face, because this is a tough battle they had just laid.



  Added several new models this year, the production site a lot of pressure. With the new machines have been started, the team had to face the pressure tank drones and "Fierce Dragon" aircraft delivered simultaneously, in desperation, division and section in order to ensure on-time delivery of UAVs, intend to suspend the "Fierce Dragon "Project.

  Team Leader Guisheng Li heard the news, immediately rejected the decision of the "Fierce Dragon" downtime firmly set a "military order" - to ensure that the UAV and the "Fierce Dragon" delivery of the second batch of 18. Team no objection, no one back, because we all know the meaning of the "Fierce Dragon" aircraft on time delivery.Guisheng Li developed a four crucial strategy: re-allocation of human resources, process optimization, "July 14" two-axle and transfer duty, the potential to be won. "2 * 18" heights.

  During that time, everyone together to work, working is 14 hours, lasted more than a month.

  In late August, the installation is complete delivery of the UAV segment, on the 24th, "Fierce Dragon" 2P18 tank rack section 2-3 to enter the link to pay check
. In the morning all team members in the field with the delivery, insurance checks, extra clean-up, self-test investigation, the total seizure, clean up state ...... until 22:00, when the certificate of inspection foreman handed the hands of all those present The workers hold a ball, using laughter to celebrate their victory. Ultimately, the "Fierce Dragon" tank team with "July 14" won the "2.18."

  There are also great as a soldier

  "This kid is a brick, which can be put to use, which has put to use." This is the foreman of the evaluation of Li Cong Ming. Li Cong Ming into the plant in 2013, the real assembly recruits, soldier, willing to learn, but with hard work, he has now become an indispensable cornerstone of the team. In the fourth quarter tank assault team "Fierce Dragon" production tasks, because the shortage of manpower, he became the team's "snake oil", where he went to make up the lack of people, where there is a temporary failure to send him in the past, this one into the plant years as a soldier with a big job.

  "Cong Ming, immediately came to the high cross-section deliveries with five." Back to work until 22:00 singleton hostels 10:30 he received a phone foreman, 10:50 to appear in the delivery site. Scene 5 cross section is being carried out inspection work, the total seizure, troubleshooting ...... 11:30 started by military representatives of the Ministry of seizure. Everyone is nervous because this is the last check before delivery.

  "Find a place on the 2nd Tank, Troubleshooting immediately." The military representatives said, pointing to the tank.

  More than a dozen pairs of eyes suddenly focused to Li Cong Ming body. He picked up the toolbox walked type shelves starting disassembly cap, product protection, troubleshooting, and then clean up the extra material expertly restored installation. Military representatives have been observed next to Lee after carefully checking out the thumbs up from the scene of the workers are applauding.

成飞今年新产多型新机 为交付无人机险停工枭龙-中新网
 
.
CAC installed in the Department of Plant "Fierce Dragon" production line active in such a team - the courage to challenge them, good tough fight, took over the production of one tough task - they just plant "Fierce Dragon" 2 -3 No. tank segment team.

  14 members of this team, with an average age of 38 years old, is responsible for the "Fierce Dragon" in the fuselage fuel tank assembly work 2-3 segments, has been called "the Department of loading the spine."

  "2.18" and "7.14"

  Mention the "Fierce Dragon" two batches of 18 deliveries, tank team members who will take pride in his face, because this is a tough battle they had just laid.



  Added several new models this year, the production site a lot of pressure. With the new machines have been started, the team had to face the pressure tank drones and "Fierce Dragon" aircraft delivered simultaneously, in desperation, division and section in order to ensure on-time delivery of UAVs, intend to suspend the "Fierce Dragon "Project.

  Team Leader Guisheng Li heard the news, immediately rejected the decision of the "Fierce Dragon" downtime firmly set a "military order" - to ensure that the UAV and the "Fierce Dragon" delivery of the second batch of 18. Team no objection, no one back, because we all know the meaning of the "Fierce Dragon" aircraft on time delivery.Guisheng Li developed a four crucial strategy: re-allocation of human resources, process optimization, "July 14" two-axle and transfer duty, the potential to be won. "2 * 18" heights.

  During that time, everyone together to work, working is 14 hours, lasted more than a month.

  In late August, the installation is complete delivery of the UAV segment, on the 24th, "Fierce Dragon" 2P18 tank rack section 2-3 to enter the link to pay check
. In the morning all team members in the field with the delivery, insurance checks, extra clean-up, self-test investigation, the total seizure, clean up state ...... until 22:00, when the certificate of inspection foreman handed the hands of all those present The workers hold a ball, using laughter to celebrate their victory. Ultimately, the "Fierce Dragon" tank team with "July 14" won the "2.18."

  There are also great as a soldier

  "This kid is a brick, which can be put to use, which has put to use." This is the foreman of the evaluation of Li Cong Ming. Li Cong Ming into the plant in 2013, the real assembly recruits, soldier, willing to learn, but with hard work, he has now become an indispensable cornerstone of the team. In the fourth quarter tank assault team "Fierce Dragon" production tasks, because the shortage of manpower, he became the team's "snake oil", where he went to make up the lack of people, where there is a temporary failure to send him in the past, this one into the plant years as a soldier with a big job.

  "Cong Ming, immediately came to the high cross-section deliveries with five." Back to work until 22:00 singleton hostels 10:30 he received a phone foreman, 10:50 to appear in the delivery site. Scene 5 cross section is being carried out inspection work, the total seizure, troubleshooting ...... 11:30 started by military representatives of the Ministry of seizure. Everyone is nervous because this is the last check before delivery.

  "Find a place on the 2nd Tank, Troubleshooting immediately." The military representatives said, pointing to the tank.

  More than a dozen pairs of eyes suddenly focused to Li Cong Ming body. He picked up the toolbox walked type shelves starting disassembly cap, product protection, troubleshooting, and then clean up the extra material expertly restored installation. Military representatives have been observed next to Lee after carefully checking out the thumbs up from the scene of the workers are applauding.

成飞今年新产多型新机 为交付无人机险停工枭龙-中新网

What does this mean?
 
.
What does this mean?

What I concur from this news is china has provided fuselages and sub assemblies of up to 18 block II aircrafts

1.JPG
2.JPG
3.JPG
4.JPG
5.JPG
6.JPG
 
. .
Hi,

The mach number for this aircraft is fine----speed is just for show----. Most of the cruising and strike missions are below mach 1.

With speed---you don't get maneuverability----. The JF 17 is an excellent design for an aircraft this size---.
Speed means a lot if backed by sufficient fuel capacity(perfect examples being SU-35 & Pak FA). & by the way detection range of 75km for 5sm RCS objects is not going to help with the "fast missiles" thing. JF-17 even in it's block 2 is just a "filler" to fill the gap of retiring air crafts.(while keeping in mind the requirements of a country like Pakistan whose very existence is under threat by many ways)
 
Last edited:
.
Speed means a lot if backed by sufficient fuel capacity(perfect examples being SU-35 & Pak FA). & by the way detection range of 75km for 5sm RCS objects is not going to help with the "fast missiles" things. JF-17 even in it's block 2 is just a "filler" to fill the gap of retiring air crafts.(while keeping in mind the requirements of a country like Pakistan whose very existence is under threat by many ways)

Hi,

Higher speed---does not bring much to this above average aircrafts. The F 17 is not a filler aircraft---. You can compare a small aircraft of nowadays to what was the AK 47 in the 70's---as the AK 47 brought equality amongst two fighting groups---the smaller fighter aircraft of nowadays have the same effect---they are extremely potent and deadly.

They have highly sophisticated electronic warfare / weapons packages not seen in the past---even though they cannot carry a large number of Bvr missiles as the heavier enemy aircraft can---but they can carry missiles similar in size and cability and ability---and they can still launch extremely deadly Bvr missiles from the same distance as the opponent can---with an extremely high kill ratios---and then you are looking at Off bore sight missiles in this aircraft in the coming 3-4 years.

High top end speed is just one of the factors----and not THE factor in aircraft design and function. It depends on your needs---desires---but the ultimate factor is how much money you have to invest in it---andeven if you have the money to invest---where are you going to get the power plant from. Then you have to look at other issues as well---can your ar craft structure handle the higher speeds!!!

Speed is not everything----the technology has evolved so much that it is said----if you can put a capable engine on a brick---make it fly and load it up with the most modern missiles and electronics package---you can literally take out the best of the enemy aircraft out.

The JF 17 is built for the local arena---it is designed to give the forces some breathing room with an extremely potent weapons package.
 
.
Hi,

Higher speed---does not bring much to this above average aircrafts. The F 17 is not a filler aircraft---. You can compare a small aircraft of nowadays to what was the AK 47 in the 70's---as the AK 47 brought equality amongst two fighting groups---the smaller fighter aircraft of nowadays have the same effect---they are extremely potent and deadly.

They have highly sophisticated electronic warfare / weapons packages not seen in the past---even though they cannot carry a large number of Bvr missiles as the heavier enemy aircraft can---but they can carry missiles similar in size and cability and ability---and they can still launch extremely deadly Bvr missiles from the same distance as the opponent can---with an extremely high kill ratios---and then you are looking at Off bore sight missiles in this aircraft in the coming 3-4 years.

High top end speed is just one of the factors----and not THE factor in aircraft design and function. It depends on your needs---desires---but the ultimate factor is how much money you have to invest in it---andeven if you have the money to invest---where are you going to get the power plant from. Then you have to look at other issues as well---can your ar craft structure handle the higher speeds!!!

Speed is not everything----the technology has evolved so much that it is said----if you can put a capable engine on a brick---make it fly and load it up with the most modern missiles and electronics package---you can literally take out the best of the enemy aircraft out.

The JF 17 is built for the local arena---it is designed to give the forces some breathing room with an extremely potent weapons package.
i totally agree.... But i think a T/W ratio of more than 1 should be thought about.. Because then u have a deadly dog fighter added to the whole weapons package..like the F-16 MLU is....So powe rplant is an issue but not for speed but for T/W ratio..
 
.
i totally agree.... But i think a T/W ratio of more than 1 should be thought about.. Because then u have a deadly dog fighter added to the whole weapons package..like the F-16 MLU is....So powe rplant is an issue but not for speed but for T/W ratio..

Hi,

How did the Phantoms and the F 14's made it with their weak engines----. This power plant is not going to change for awhile----maybe general upgrades from the factory and that is all.
 
.
Hi,

How did the Phantoms and the F 14's made it with their weak engines----. This power plant is not going to change for awhile----maybe general upgrades from the factory and that is all.
Phantom was one of the worst dog fighters of its age....F-14 was an aircraft of the 1980s...Well our JFT is gonna have to compete with fighters of a T/W ratio of the class of 1:1.2+ almost in many cases...so we better look at it as a shortcoming..and not blind ourselves by looking at decades old concepts the failure of which led to the Energy Maneuvrability theory...based on which the Light fighter concept was born..and led to F-16,F-18 and subsequently JFT.
 
. . .
Phantom was one of the worst dog fighters of its age....F-14 was an aircraft of the 1980s...Well our JFT is gonna have to compete with fighters of a T/W ratio of the class of 1:1.2+ almost in many cases...so we better look at it as a shortcoming..and not blind ourselves by looking at decades old concepts the failure of which led to the Energy Maneuvrability theory...based on which the Light fighter concept was born..and led to F-16,F-18 and subsequently JFT.

Who says----
 
.
Who says----
Well depends what you are talking about..If its Phantom...Vietnam says it all and if its Thunder then its common sense and some comparison with its rivals...
 
.
Sir,

With 16 posts to your name---you don't deserve a reply if you just put these stupid and non sense replies---. Weapons systems that have been in service for 40 + years and are retd now---they already have a history---common sense does not work here.
 
.
Is there any name for Helicopter in Urdu? May be he was trying to find one and got himself and the readers confused.
ہوسکتا ہے کہ آپ کا خیال صحیح ہو لڑاکا ہیلی کوپٹرکی جگہ لڑاکا طیارہ کہدیا ہے
 
.
Status
Not open for further replies.

Pakistan Affairs Latest Posts

Country Latest Posts

Back
Top Bottom