What's new

ISRO GSLV MkIII-M1 / Chandrayānam-2 (Chandrayaan-2) Mission: July 15, 2019

July 14, 2019
The launch countdown of GSLV MkIII-M1/Chandrayaan-2 commenced today at 0651 Hrs IST. The launch is scheduled at 0251Hrs IST on July 15th.

July 14, 2019
Propellant filling of Liquid stage (L110) of GSLV MkIII-M1 is in progress.
 
. .
July 14, 2019

GSLV MkIII-M1/Chandrayaan-2: Propellant filling of liquid core stage (L110) of GSLV MkIII-M1 completed.
 
. .
IMG_20190714_145530.jpg


Lander-Rover:

IMG_20190714_145443.jpg
 
.
July 14, 2019

Filling of liquid oxygen in Cryogenic stage commenced.

A special day?

  • A historical Wimbledon final.
  • A historical cricket world cup final.
  • A tremendous proper race-filled Formula 1 GP.
  • To top it all off, hopefully a succesful start to a historical moon mission.
 
.
July 14, 2019

Filling of liquid oxygen in Cryogenic stage commenced.

A special day?

  • A historical Wimbledon final.
  • A historical cricket world cup final.
  • A tremendous proper race-filled Formula 1 GP.
  • To top it all off, hopefully a succesful start to a historical moon mission.

I was thinking the same thing lol.
 
.
July 15, 2019

Filling of liquid oxygen in Cryogenic stage completed and filling up of liquid hydrogen commenced.
 
. . . . .
A technical snag was observed in launch vehicle system at T-56 minute. As a measure of abundant precaution, Chandrayaan-2 launch has been called off for today. Revised launch date will be announced later.
 
.
A technical snag was observed in launch vehicle system at T-56 minute. As a measure of abundant precaution, Chandrayaan-2 launch has been called off for today. Revised launch date will be announced later.

What a joke all the hurrays before the fact
 
. .

Latest posts

Country Latest Posts

Back
Top Bottom