Maybe realised a;ready no money left in the pot.
Hmm, No. During the last covid hit year, India spend $19 billion on defence capex which is it's highest ever. As for the Navy,
Why order it now? Do you know how carriers (or any ship for that matter) are built?
4) Plans to build KA choppers in India on hold
And LOI for HAL's own LUH is issued, a ~$500 million new helicopter manufacturing plant is being built for the same.
Also, $2 billion worth of orders for 24 MH-60R is being delivered.
Tejas MK1A - Not even flown
Uttmam - No orders
Tejas Mk1A is already ordered, and Uttam is a subsystem of the same. It's as stupid as claiming that Arleigh Burke-class destroyers were ordered but LM2500 GTs weren't.
Since this is a Navy thread, let me calculate the value of outstanding shipbuilding orders placed by the Navy.
IAC1: 21,000 Cr (already paid, I guess)
4 P15B destroyer: 35,800 Cr
7 P17A Frigate: 49,000 Cr
4 Upgraded Talwar Class: 13,000 Cr
6 Next Gen Missile Vessel: 10,000 Cr.
16 ASW Shallow Water Craft: 16,000 Cr
Scorpenes (2 more): 9000 Cr
2 Diving Support Vessel: 2019 Cr
4 Survey Vessel Large: 2000 Cr
That's $19 billion worth of vessels on order even without counting the IAC, many more to be placed soon.
I haven't calculated the value of SSBNs, Missile testbeds (see the vessel on previous post), MRIS etc. That will take combined value to near ~$25 billion I guess.
Interesting looking warship at 3 minutes
That's a merchant vessel. Looks like it's a heavy lift vessel carrying Quay cranes.