Skull and Bones
ELITE MEMBER
- Joined
- Jan 29, 2011
- Messages
- 18,601
- Reaction score
- -4
- Country
- Location
evil plan hehehe, offering such aircraft which lacks in dogfight (air to air combat).
Whom will they dog fight against? Kinkajou?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
evil plan hehehe, offering such aircraft which lacks in dogfight (air to air combat).
Hope this will stop your melodrama Mr.Think Tank !
any airforce should have such capability since airforce's basic roles are air to air combat and air to ground combatWhom will they dog fight against? Kinkajou?
Its true. Just like initially China delivered only 2 JF-17s.
Yes - 5 SQDs of Prototypes..SL was offered JF for 35 million a pop.. And are you fuking quoting Wikipedia .. JF-17 prototypes equipping 5 SQDs?
evil plan hehehe, offering such aircraft which lacks in dogfight (air to air combat).
any airforce should have such capability since airforce's basic roles are air to air combat and air to ground combat
soo.. you shuu..shuuu
But why would they accept older aircraft when they have the option to get new ones?
Even without JF-17, they can go for the Korean KAI T-50s, which would do a wonderful job.
We seriously need to get Tejas into mass production for exports alongside IAF and IN's needs.
Just visit aviation-safetynet And check under Pakistan and India categories.Provide the source or GTFO.
The 1200+ is a fact.. Iaf celebrated its 1000ty crash years back.
Yes - 5 SQDs of Prototypes..
Please go and update the status on Wikipedia before inducting a JF17 trainer jet and be a laughing stock.
Technically JF17 will remain a prototype until a Twin seat trainer is inducted.
they're already being delivered to iaf
Parrikar hands over first light combat aircraft Tejas to IAF | india | Hindustan Times
Hope this will stop your melodrama Mr.Think Tank !
i wud like to be proven wrong,,,but till now all the info frm the source has been correctYour sources are wrong 4 out of 6 parameters are about to be completed by march.not sure about other 2.
no,,as of now not certain.Already fueling probes are ordered, which only post 20 models will have. There would be no point in validating it with Tejas if more models are being ordered. FOC+ models are what IAF want any. No, confirmation for mark 2 either, but around 100 GE F414 engines are already ordered. Not all of which will go to naval variants. It wont end at 20 IOC models, that's for certain.
You mean comprehend like this ?
That means 66 jets + their prototypes.
Is it that hard to comprehend?.