What's new

India in talks with Russia to lease new nuclear attack submarine

Zarvan

ELITE MEMBER
Joined
Apr 28, 2011
Messages
54,470
Reaction score
87
Country
Pakistan
Location
Pakistan
kommersant_nerpa_468.jpg


India is in final talks with Russia to lease a new nuclear attack submarine, giving a much needed boost to its depleting underwater fleet. Signaling a difference in approach by the Modi-led government, India is now looking to lease a newly built, customised submarine, unlike in the past when older vessels were refurbished and handed over.

Several sources related to the project that ET spoke with confirmed that talks on leasing a new submarine under the ‘Chakra 3′ project are in advanced stages and that the issue will be discussed during Prime Minister Modi’s visit to Russia this week.

India has the ‘Chakra 2′ Akula class nuclear submarine in service that is considered to be one of the deadliest non-US attack boats in the world. This submarine – a refurbished Soviet era boat – has been taken on a 10-year lease from Russia in 2012. ‘Chakra 1′, India’s first nuclear submarine, was taken on a similar lease in the late 1980s.

While talks on leasing a third Chakra have been on for over two years, a change of stand has taken place after the Modi government took over, with the Indian side insisting on a modern, world-class submarine on lease. The only nuclear attack submarine of this kind being produced in Russia currently is the Yasen class, the quietest, least detectable submarine it has ever built.

It is still not clear, however, whether the final contract would specify a Yasen submarine or a modified boat of the same class to suit Indian requirements. “The final shape is yet to be decided, but it is now almost certain that a ‘greenfield’ submarine will be built,” a source associated with the programme told ET.

What is clear is that India is embarking on a project to produce indigenous class of nuclear attack boats (SSNs) under new submarine programme. The plan, to build at least six SSNs in India, was given financial sanction in February and designers are already at work on the project that could cost upwards of Rs 90,000 crore.

These new submarines, to be fitted with the indigenous verticallylaunched Brahmos missile, are to be built at the Vizag-based ship building centre, with L&T expected to get a significant chunk of the work.

Work on making operational India’s first nuclear missile boat – different from a nuclear attack submarine is also underway with the first missile test from the submarine expected to take place this year.

Posted in India

India in talks with Russia to lease new nuclear attack submarine | idrw.org
 
.
This one happens to be K-322 Kashalot of Project 971 Shchuka-B or simply Akula III - The existing INS Chakra-II happens to be Akula-III (project 971M) - It is longer and has a larger displacement compared to the Akula II. Also, it has an enlarged sail and a different towed-array dispenser on the vertical fin. Again, more noise reduction methods were employed. Akula-III is more capable than Akula-II.

Nerpa_inf_720.jpg

What is this Nuclear missile boat never heard of anything.

It's a reference to INS Arihant - it is a SSBN - ballistic missile submarine which is different from a nuclear attack submarine - it is to test fire K-15 Sagarika & K-4 SLBM's soon during its ongoing sea trails.
 
Last edited:
. .
That lease period might be enough to get the TOT out of it. Chinese style.... :cool:
 
. .
I won't be surprised,
If in year 2020, Indian Navy Decides to extend the lease of Chakra 2/3 by another 10 years
Mainly due to delay in indigenous SSN project
 
. .
This was on offer to India since long now needs to be see which class submarine is leased
 
.
Most probably this new submarine will be IBRIS which is incomplete , it will be most likely built with a VLS systems and Indian Needs.
We ain't getting Yansen.

And about INS Chakra(present one) being refurbished, the writer is making a mistake. It was an incomplete hull which India paid to be completed.

Akula-II is more capable than Akula-II.

Nerpa_inf_720.jpg

Hi
Are you sure
Akula2 > Akula3
 
.
.
Whatever sub we get from Russia, whether Akula II or Yassen,
They will provide a short in the arm to the Indian Navy, which is still dealing from the loss of the kilo in 2013
As it is Indian navy has to work with 11 SSKs and 1 SSN, since two Kilos are in refit
 
.
Bring any sub be it yasen or akula . We need subs desperately. Some fog will clear on modis visit to russia . Fgfs mta subs large number of issues are to be settled
 
.
What is this Nuclear missile boat never heard of anything.

LOL...

INS Arihant - Wikipedia, the free encyclopedia

I won't be surprised,
If in year 2020, Indian Navy Decides to extend the lease of Chakra 2/3 by another 10 years
Mainly due to delay in indigenous SSN project

thats the "Game" my friend. :azn:

we can't buy SSN,thus we'll "Lease it 4 times and then retire".. :lol: almost all Indian members are sure about it.

by the way,I've heard we were about to lease this one,"Irbis"...

C0z9JrwAjn.jpg


cuQcc.jpg


these pics are from 2002...

along with this one....

kashalot.jpg


K-322 Kashatol

K-322 Kashalot

Индия возьмет у России в аренду атомную подлодку «Кашалот» - ВПК.name
we were in negotiation to lease these 2..

now all of a sudden,Yasen??? o_O
 
Last edited:
. .
I won't be surprised,
If in year 2020, Indian Navy Decides to extend the lease of Chakra 2/3 by another 10 years
Mainly due to delay in indigenous SSN project
It is an open secret that the IN owns the Chakra the "lease" is nothing but a clever cover to get around international legislative restrictions prohibiting the sale of such technology to India.

So yes, the lease will be "extended" indefinitely.
 
.

Pakistan Defence Latest Posts

Back
Top Bottom