What's new

Hassanabdal-Mansehra Expressway (E35)...Updates

24991288_1955977851391012_3384881486920090745_n.jpg





24796242_1955974824724648_7152461776703885066_n.jpg




24774742_1152273918237010_4628873851033966997_n.jpg
 
. .
24910043_1136706199765554_2691912119924341755_n.jpg




24899769_877728659049385_222581051106263836_n.jpg


Battagram Interchange Bridge U/C

Huge pillars.

24862497_1838948719729895_1442213798208165934_n.jpg




24909569_2207571605934969_8071590331242920752_n.jpg




24796411_2207571699268293_8263608720948043809_n.jpg


2/12/2017.

Dobather, Abbottabad. Bridges are now taking final shape.

24068368_541169669582874_6415363216980532099_n.jpg




24294341_541169226249585_7337852582401858594_n.jpg





24176746_541169269582914_8687470960985653932_n.jpg





24177086_541169122916262_5010624400223805306_n.jpg




24294307_541169089582932_3075557642682306251_n.jpg




24177032_541169049582936_3543531429329070909_n.jpg





24174543_541169026249605_8622593865452301585_n.jpg
 
.
1/12/2017.

Havellian Mansehra Section. Bridges U/C at different location.

24068081_1945031419068258_2455465495093731204_n.jpg




24176759_1945031475734919_3455371398272402572_n.jpg




24068172_1945031599068240_4204143054454718184_n.jpg




23915772_1945031975734869_8137588125098844119_n.jpg




23905529_1945032829068117_261210640486137217_n.jpg



Abbottabad Interchange Near Khokhar Mera Village design. This interchange will link new motorway with KKH.


24900250_135180977260745_6902969040662433617_n.jpg




Shah Maqsood Interchange.

Taken Just now. Stunning views after rain.

24910051_2139833909363908_3784228228182454732_n.jpg


25151843_2139833986030567_4204688247856114324_n.jpg


24991612_2139834039363895_3122676433688640426_n.jpg


U/C Interchange can be seen.

24909660_2139834082697224_1177299520306297318_n.jpg




U/C Interchange 9/12/2017

24852446_545809875780025_1283832193760369917_n.jpg


25289347_545810155779997_1850149954730506962_n.jpg




24852380_545809732446706_2517879449193625347_n.jpg
 
. .
12/12/2017.

Package 1 Near Burhan.

25348306_1880387215323807_4736164354450084910_n.jpg




24993579_1880387168657145_2381007812674749963_n.jpg



Package 3 Shah Maqsood Interchange.

25151895_1331336413637442_4032730487420943962_n.jpg




After Shah Maqsood Interchange in Haripur.

24993627_1331336576970759_117006152798903555_n.jpg
 
. .
Travelling Havelian to Islamabad
Hazara Motorway ...Great achievement CPEC Silk Route
1st time travelled on it from Havelian to Hasanabdal in just 30 mints.
Opening Ceremony is expected on 25th December,2017.

 
.
Hazara Expressway (E-35)








Hazara Motorway Opening 28 Dec 2017

Ahsan Iqbal was talking at Havelian after inspecting the Hazara Motorway, which would be inaugurated by Prime Minister Shahid Khaqan Abbasi on December 28. After its completion, the journey to Islamabad would be cut down to 45 minutes from Havelian to Burhan Interchange
 
.
Hazara Expressway (E-35)








Hazara Motorway Opening 28 Dec 2017

Ahsan Iqbal was talking at Havelian after inspecting the Hazara Motorway, which would be inaugurated by Prime Minister Shahid Khaqan Abbasi on December 28. After its completion, the journey to Islamabad would be cut down to 45 minutes from Havelian to Burden Interchange
String economic as well as strategic importance. Now northern areas can be reinforced, if needed, in half the time. On on personal level I am a little disappointed as now Northern Areas have lost their isolation, mystique and adventure that I enjoyed so much on the 300/400 km hikes that I used to do just by myself in the 80s and the 90s.
 
. . . . .
Speed of progress is fantastic. I visited the area in Dec 2015.


Yes the speed is amazing keeping in mind the rough and difficult terrain, mountains and rivers, bridges and culverts has to be made, results in cost escalation and more time, still the speed and construction quality is too good and with use of new technology and new machines.
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom