What's new

Hassanabdal-Mansehra Expressway (E35)...Updates

18767903_1191241594336870_2219152567724436447_n.jpg





18835560_1191241637670199_604614906847742461_n.jpg





18882163_1191241597670203_8704895076614296785_n.jpg
 
180 Km Hazara Motorway under construction crash barrier Package 2 C.G.G.C & AM ASSOCIATE JV BARIRAR PAVING 29+740.



19554724_1213836655410697_2856371413101589202_n.jpg



19510656_1213836695410693_5129129655173575603_n.jpg
 
Updates 20/7/17


Havellian to Abbottabad Section where Chinese firm is working.


20228347_1596033557076308_2907950467522305597_n.jpg




20155764_1596033737076290_3700245600740248265_n.jpg





19060067_1596034023742928_4615130400887385097_n.jpg




20228275_1596034153742915_7260173267093493761_n.jpg




20156099_1596049910408006_7482465635237954195_n.jpg


20156157_1596049963741334_1162045255704041809_n.jpg



19983735_1936619423018692_2007047370526947332_o.jpg


Just imagine driving there at 100 km/hr and with all those bridges passing through lush green mountains and valleys, I can bet it is going to be an amazing ride.


11889575_1181285518552090_8945149038363479917_n.jpg



10608362_1027775010569809_173543942875054100_o.jpg
 
Last edited:
Updates 20/7/17


Havellian to Abbottabad Section where Chinese firm is working.


20228347_1596033557076308_2907950467522305597_n.jpg




20155764_1596033737076290_3700245600740248265_n.jpg





19060067_1596034023742928_4615130400887385097_n.jpg




20228275_1596034153742915_7260173267093493761_n.jpg




20156099_1596049910408006_7482465635237954195_n.jpg


20156157_1596049963741334_1162045255704041809_n.jpg



19983735_1936619423018692_2007047370526947332_o.jpg


Just imagine driving there at 100 km/hr and with all those bridges passing through lush green mountains and valleys, I can bet it is going to be an amazing ride.


11889575_1181285518552090_8945149038363479917_n.jpg



10608362_1027775010569809_173543942875054100_o.jpg


Yes, it would be quite an amazing drive on this highway... thanks for posting!
 
39 Km Havelian-Manshera Section Of 120 km Thakot-Havelian Motorway To Be Completed In April 2018.
Work on Thakot-Havelian motorway is in full swing and the 120 kilometer project would be completed in December 2019.

The motorway in early harvest Project category and its 39 kilometre Havelian-Mansehra section would be completed in April 2018.
There would be three inter changes in the 39 km section which included Khota Qabar inter change, Qalandarabad and Manshera interchange.

120-kilometre section of the motorway, part of China Pakistan Economic Corridor (CPEC), is expected to be completed in 42 months with a cost of Rs 133.98 billion. China Exim bank will fund 90 per cent of the project, while the remainder will be funded by Pakistan. The stretch of motorway from Havelian passes through Abbottabad, Mansehra and Shinkiari, ending at Thakot. It will have five tunnels -two at Abbotabad, one each at Battal,Karmong and Mansehra.
 
The project Burhan Havellian is divided into 3 sections. 1st two sections (40km) were to open in August 2017. But there will be a little delay and they will open in September.

While 3rd section had always December 2017 opening date. Some FB pages are creating too much confusion regarding project opening dates.

From Havellian to Thakot is altogether a different project and Chinese firms are working on it. 1st 39 km (Havellian - Abbotabad - Mansehra) of this section (4-lane access controlled expressway) will open in April 2018, while complete section will open up in December 2019.
 
The project Burhan Havellian is divided into 3 sections. 1st two sections (40km) were to open in August 2017. But there will be a little delay and they will open in September.

While 3rd section had always December 2017 opening date. Some FB pages are creating too much confusion regarding project opening dates.

From Havellian to Thakot is altogether a different project and Chinese firms are working on it. 1st 39 km (Havellian - Abbotabad - Mansehra) of this section (4-lane access controlled expressway) will open in April 2018, while complete section will open up in December 2019.

Wai wai gonna drive on it if the expressway opens
 
Back
Top Bottom