What's new

First Tejas squadron to come up in B'luru by July

mehboobkz

SENIOR MEMBER
Joined
Aug 27, 2010
Messages
2,462
Reaction score
-6
Country
India
Location
Singapore
http://timesofindia.indiatimes.com/...-the-indigenous-jet/articleshow/52301474.cms?


NEW DELHI: It was a routine sortie of the Tejas light combat aircraft, which has so far clocked well over 3,050 flight tests since its first prototype took to the skies in January 2001. But the message was significant: India's first home-grown fighter has finally come of age after a meandering developmental saga of 33 years.

Air Chief Marshal Arup Raha became the first IAF chief to fly in the multi-role supersonic Tejas at the Hindustan Aeronautics facility in Bengaluru on Tuesday morning. "The twin-seat Tejas trainer will undergo a full-profile sortie. It will convey IAF's confidence in the indigenous fighter," said HAL chief T Suvarna Raju, speaking to TOI.

That is certainly true. After years of being highly critical of the excruciatingly slow progress in developing the fighter, which was supposed to replace the virtually obsolete MiG-21 but kept on missing deadlines, the IAF finally has something to cheer about.

The force, after all, is down to just 33 fighter squadrons (each has 16-18 jets), which includes 11 squadrons of old MiG-21s and MiG-27s with poor serviceability. This when 45 squadrons are needed to counter a two-front collusive threat from Pakistan and China.

Master.jpg


Chief of Air Staff Arup Raha who flew in the multi-role supersonic Tejas. (TOI photo)

The first Tejas squadron with four jets is slated to come up at Bengaluru by July. "It will operate from a dedicated HAL hanger, with designers and manufacturers being close by to resolve teething problems. The squadron will shift to its earmarked airbase at Sulur after a year," said an official.

The single-engine Tejas, of course, is still not combat-ready. Its final phase of weapon trials, including firing of BVR (beyond visual range) missiles, is currently under way. Moreover, the fighter is to get an AESA (active electronically scanned array) radar and advanced electronic warfare (EW) suite, apart from becoming capable of mid-air refuelling, for its Mark-IA version that the IAF actually wants.

All this will take another two to three years. Global arms majors like Raytheon, Israeli Aerospace Industries, Thales, Saab and others have already responded to the "search and select process" underway to find an AESA-EW package for the fighter. "Tejas jets produced after 2018 will be up to the Mark-IA standards," said Raju.



In effect, IAF will get the first 20 Tejas Mark-I jets by 2018. With the annual production being stepped up to 16 jets from the existing 8, another 100 "improved" Tejas Mark-IA jets will follow by 2026 or so.




While Tejas will certainly help IAF to make up depleting numbers, the light-weight jets cannot substitute the need for medium-weight multi-role combat aircraft (MMRCA) or heavy-weight fighters. The 36 Rafales India is negotiating hard to acquire from France for Rs 60,000 crore, for instance, have more than triple the weapon-load carrying capacity and range of the Tejas fighters.


India deserves credit for finally building a fighter. Even though it is likely obsolete by now, having taken an unheard 33 years to develop and even then, most of the crucial parts, including the eng... Read MoreAP


Tejas, with a limited reach of just about 400-km, will basically be used for "air defence" to take on incoming enemy fighters or "close air-to-ground" operations to support the Army. Strikes deep into enemy territory will have to be undertaken by Russian-origin Sukhoi-30MKIs or the Rafales.




Master.jpg
 
.
In effect, IAF will get the first 20 Tejas Mark-I jets by 2018. With the annual production being stepped up to 16 jets from the existing 8, another 100 "improved" Tejas Mark-IA jets will follow by 2026 or so.
Its 2+2+8+8 = 20 formula.
After 2018 Mark 1A will be ready to deploy in IAF as per schedule.
There exist a big hole in IAF plannings, regarding replacing old Mig21, Mig27 air crafts (11 squadrons) and addition of more squadrons to achieve mark of 45. (12 squadrons)

Its a huge challenge .................
 
.
Its 2+2+8+8 = 20 formula.
After 2018 Mark 1A will be ready to deploy in IAF as per schedule.
There exist a big hole in IAF plannings, regarding replacing old Mig21, Mig27 air crafts (11 squadrons) and addition of more squadrons to achieve mark of 45. (12 squadrons)

Its a huge challenge .................


See its not just about numbers look at the capability a mki can do compared to a mig 21,

We should think more of the long term and 5th gen going forward.
 
.
Its 2+2+8+8 = 20 formula.
After 2018 Mark 1A will be ready to deploy in IAF as per schedule.
There exist a big hole in IAF plannings, regarding replacing old Mig21, Mig27 air crafts (11 squadrons) and addition of more squadrons to achieve mark of 45. (12 squadrons)

Its a huge challenge .................
Creating challenge and later on delaying the challenge is what IAF, HAL & DRDO are known for. In no way, IAF will have the sanctioned strength of 45 squadron. The old Mig-21 & 27 will be retired before 2020, and then we will be only adding 2 squads of Rafale(of course if the deal is done), 3 squads of MKI and 2 squad of LCA. All this thing will in the best case scenarios.
 
.
Its 2+2+8+8 = 20 formula.
After 2018 Mark 1A will be ready to deploy in IAF as per schedule.
There exist a big hole in IAF plannings, regarding replacing old Mig21, Mig27 air crafts (11 squadrons) and addition of more squadrons to achieve mark of 45. (12 squadrons)

Its a huge challenge .................
The IAF will acheive the 45 SQN target by 2025 quite easily with the LCA and Rafale inductions ( and a few more MKIs SQNs here and there to keep the Naisk plant running until the FGFA is ready for production).

My friend @PARIKRAMA has the exact figures/projections, please could you share them bro?
 
.
Its 2+2+8+8 = 20 formula.
After 2018 Mark 1A will be ready to deploy in IAF as per schedule.
There exist a big hole in IAF plannings, regarding replacing old Mig21, Mig27 air crafts (11 squadrons) and addition of more squadrons to achieve mark of 45. (12 squadrons)

Its a huge challenge .................
Trust me, 42-45 sqds are not achievable before 2025-27. Also till 2020, sqd numbers will roughly be same as now i.e 33-35 as we'll induct around 7-8 news sqds by 2020 with aircrafts like Rafale, MKI and Tejas but de-induct the oldies too..so even if capabilities will be enhanced by many many folds, numbers are here to stay....

what about crahed Jf 17 ? have answers or your Generals pay u enough?
dude seriously? kindly avoid trolling.....
 
. .
Trust me, 42-45 sqds are not achievable before 2025-27. Also till 2020, sqd numbers will roughly be same as now i.e 33-35 as we'll induct around 7-8 news sqds by 2020 with aircrafts like Rafale, MKI and Tejas but de-induct the oldies too..so even if capabilities will be enhanced by many many folds, numbers are here to stay....

Unless there is an imminent war on 2 fronts, we will be ok with the shortage.

These moves by govt and IAF are required to build our own infra for long term gain. Yes, things were delayed. Talking and feeling bad about it won't help at all.
Govt need to ensure that we build on LCA. That will ensure we will be self-reliant to certain extent going ahead.
 
.
See its not just about numbers look at the capability a mki can do compared to a mig 21,


I think 1 LCA can easily replace 2 mig21... but as LCA will act like point defence fighter, we also require it in good numbers...

Cg
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom