What's new

Energy Projects...Updates

at 19:47 sun is out.

Most solar panels are designed to be east facing, so they get direct sunlight from the time that the sun rises to the time it crosses overhead. In the evening when the sun is nearing the west side almost no direct sunlight would be hitting the panels and hence no power generation. There is one solution to this is that the panels have solar tracking capability and adjust their tilt and direction to constantly produce max power, however, those panels are very,very expensive.
 
.
New gas based plant Bhikki is having technical problems and will take time to fix it. Bhikki failed after working less then a month :rolleyes:
 
.
New gas based plant Bhikki is having technical problems and will take time to fix it. Bhikki failed after working less then a month :rolleyes:
It was supposed to b on trial run but govt tried to show how much hard work they are doing. they added it in the system before the time.
 
. .
Karachi

DBaiKKRUwAAUV2W.jpg
 
.
PM Chairs CCE Meeting to Discuss Power Supply Situation

Islamabad (June 06, 2017): Prime Minister Nawaz Sharif on Tuesday charmed Cabinet Committee on Energy’s meeting to discuss power supply situation in the country and progress on different ongoing power projects being installed in the country.

The committee accorded approval in principal for establishment of a new LNG based 1,200 MW capacity power plant.

The committee was briefed by the Secretary Water and Power about the power supply situation and power demands by 2018.

The Prime Minister emphasized that pro-active planning should be exercised regarding power supply and demand. He said it was very unfortunate that planning by relevant authorities was undertaken without inculcating important contingency factors that could not be ruled out.

He directed the Ministry of Water and Power to undertake power supply and demand analysis till the year 2023 so as to undertake integrated long-term planning with regard to fulfilling energy requirements of the country over the foreseeable future.

Nawaz Sharif also directed to work out shifting of scheduled outages of power plants on account of repairs and maintenance from summer season to winter season so that maximum power is provided when most required during months of peak power demand. The progress of Port Qasim power plant was also discussed.

The CCE meeting unanimously approved that no power shutdowns be carried out on account of development works during Ramzan.

The meeting also decided that factors including increase in use of electric appliances due to economic prosperity and behavioral patterns of power consumers be included in the estimation of projected power demands.

Secretary Water and Power Division briefed the meeting on progress of decisions made in the previous meeting including working of the inter-ministerial committee of Finance, Water and Power and Petroleum and Natural Resources ministries, power supply and demand analysis till September 2018 and utilization of idle power plants.

Minister for Finance Muhammad Ishaq Dar, Minister for Water and Power Khawaja Muhammad Asif, Minister for Petroleum and Natural Resources Shahid Khaqan Abbasi, Minister for Planning Ahsan Iqbal, Chief Minister Punjab Shahbaz Sharif, Minister and other senior officials attended the meeting.
 
.
4320 MW Dasu Hydro Power Plant under construction
The Dasu Dam is a gravity dam currently being constructed on the Indus River near Dasu in Kohistan District, KP. The 242 m (794 ft) tall dam will support a 4,320 MW hydroelectric power station which will be built in two 2,160 MW stages.


19029527_1194861510641545_5839688416120295566_n.jpg



18953007_1194861590641537_4510522123494252941_n.jpg




18893469_1194861497308213_7077122034401710686_n.jpg


1410 MW Tarbela 4th Extension Hydro Power Project Under Construction


18921709_1194810773979952_4146703087955985470_n.jpg



19029248_1194810883979941_5671200874666508100_n.jpg



18952932_1194810907313272_4587329936216462376_n.jpg
 
.
L
1430055-coal-1496892608-691-640x480.jpg

PHOTO: REUTERS

ISLAMABAD: The Private Power and Infrastructure Board (PPIB), while keeping in view coal supply from Sindh Engro Coal Mining Company, has approved time frames for the financial close and commercial operation of Thar coal-based power generation projects in a bid to ensure their smooth implementation.

The projects included 330-megawatt Thar Energy Limited, 330MW ThalNova Power Thar Limited, 660MW Lucky Electric Power Company Limited and 330MW Siddiqsons Energy Limited.

The board, in its 110th meeting held on Wednesday and presided over by Water and Power Minister Khawaja Muhammad Asif, also appreciated the initiative of China Power Hub Generation Company Limited for starting the construction of two 660MW units of its imported coal-based project at Hub from its own equity to meet the commercial operation date of August 2019.

Karot hydroelectric power project of 720MW has also achieved financial close and its construction has begun. The first unit of two 660MW units of Port Qasim power project will start generation in November this year while commercial operation will begin in May 2018.

The board also discussed the ongoing power projects in the context of overall electricity supply and demand situation in the country. Speaking in the meeting, the water and power minister said timely completion of upcoming power projects was very important for bringing an end to electricity outages in the country.

To achieve this, he said the government desired the PPIB to provide maximum facilitation in removing bottlenecks to avoid any hurdles or delays during the implementation of the projects.

The minister emphasised that the government was seriously working to bridge the gap between demand and supply of electricity to accelerate socio-economic growth and bring relief to the people.

PPIB Managing Director Shah Jahan Mirza briefed the board on various power generation projects being handled by the board.
 
.
1320 MW Hub Coal Power Plant under construction in Hub district,
The power plant, being constructed under CPEC with an estimated cost of $2 billion, will contribute 9 billion kWh of cheaper electricity annually into the national grid.


18953021_1194824607311902_7343097120121041180_n.jpg



19029301_1194824687311894_6739044338810357759_n.jpg
 
.
Coal based: 13 power plants near completion

ISLAMABAD: Six power generation projects based on indigenous coal with cumulative capacity of 4,290 megawatts and seven projects based on imported coal with cumulative capacity of 5,201 megawatts are presently at various stages and will be completed in the near future.

The federal and provincial governments are working together to provide enabling environment and robust infrastructure that is required for Thar Coal Development, roads, water supply, waste water drainage channel and airport and transmission line.

The Sindh government has established a one-stop organisation and dedicated decision-making body namely Thar Coal and Energy Board under the chief executive of the province with representation from federal and provincial governments to facilitate fast track development of Thar Coal.

http://dailytimes.com.pk/pakistan/08...ear-completion
 
.
Coal based: 13 power plants near completion

ISLAMABAD: Six power generation projects based on indigenous coal with cumulative capacity of 4,290 megawatts and seven projects based on imported coal with cumulative capacity of 5,201 megawatts are presently at various stages and will be completed in the near future.

The federal and provincial governments are working together to provide enabling environment and robust infrastructure that is required for Thar Coal Development, roads, water supply, waste water drainage channel and airport and transmission line.

The Sindh government has established a one-stop organisation and dedicated decision-making body namely Thar Coal and Energy Board under the chief executive of the province with representation from federal and provincial governments to facilitate fast track development of Thar Coal.

http://dailytimes.com.pk/pakistan/08...ear-completion

For God Sake bring clean energy we're already facing climate change/Global warming,dirty pollution everywhere and now they wanna suffocate us?

We must force for Hydro Electricity,Wind,Solar,Nuclear electricity. whole world is getting rid of these "Coal power plants" and Pakistan is adopting them now.
 
.
545 MW Hydro-power Project approved by KP government

PESHAWAR: A South Korean company will build a 545 megawatt hydropower project at an estimated cost of $1.42 billion at Kandia valley in Kohistan to provide inexpensive electricity to consumers.

The Khyber Pakhtunkhwa (KP) government has engaged South Korean Engineering and Construction Company (SK-E&C) to complete the project. The decision was taken during a high-level meeting presided over by KP Chief Minister Pervez Khattak.

Hydropower project Unit 1 to be commissioned by October 2017

“SK-E&C General Manager Eddy Nam, Manager Choris Hwans, National Engineering Cooperation Director Babar Mehmood, KP Education Minister Muhammad Atif Khan, MNA Sajida Zulfiqar Khan and other officials were present in the meeting,” said a spokesman for KP the government.

Nam and Hwans briefed the participants about the company, its quality of work, its experience in the field and the provincial government engagement with the company reflected its terms of reference and terms of engagement with the company.

The CM directed government officials to extend all possible help to Kaiga Hydro project in the entire process from execution to completion.

He assured that the provincial government would extend all possible help to facilitate foreign investors in the province.

CM Khattak assured that the government would resolve the land acquisition issue and would also provide security to the investors and their investment. The project was being executed through Public Private Partnership (PPP) and its feasibility had been completed.

The project is different in terms of its execution as it would be carried out under PPP and it is also part of the provincial government mission to tap all the sites for maximum electricity production. The design of the project would be completed in July while the execution would start right from beginning of New Year.
 
.
Neelum–Jhelum Hydropower Plant - 969 MW


19105736_1190592591050792_7962147750182783860_n.jpg





19060149_1190592271050824_2756551893821595351_n.jpg




18952713_1183374705105914_8553238929422653630_n.jpg





19225123_1190592227717495_243946276372986512_n.jpg





19224757_1190592747717443_5960891379074631166_n.jpg




19149303_1190592751050776_4533508078119285265_n.jpg
 
.
NTDC connects Balloki plant to national grid

http://nation.com.pk/business/20-Jun...-national-grid

LAHORE - National Transmission and Despatch Company Ltd (NTDC) connected 1200MW RLNG Balloki Power Plant with national grid on Monday.

The power plant has been connected through 500kV transmission line Balloki–Shaikhupura and 500kV transmission line Coal Fired Power Plant Sahiwal–Balloki, as an interim arrangement for back feed of Balloki power house and is energised today.

Meanwhile, the NTDC spokesman said that 9 towers of 500 kV Guddu-DG Khan transmission line have been collapsed due to high intensity wind storm and torrential rains in various parts of Rajanpur. However, power supply was restored to affected areas through alternate sources.

The spokesman said that, some 20 km away from Guddu, in the plains of Indus Pump, continuous flow of rainy water from the mountains of Balochistan led to the collapse of towers. Teams of NTDC engineers and contractors were mobilised immediately and restoration work has been started under the supervision of GM (Asset Management) and Chief Engineer (Asset Management) Multan. The teams are facing difficulties in transportation of men and material at sites of demolished towers due to water logging and slush in the area. NTDC Managing Director Dr Fiaz Ahmad Chaudhry is monitoring the rehabilitation activities and instructed the teams to complete the restoration work in shortest possible time.
 
.
1320 MW Port Qasim Coal Power Plant Under Construction at Bin Qasim Karachi 1st 660 MW will be operational in October and the 2nd 660 MW will be operational in January 2018.


19275095_1206412979486398_4965702208832779425_n.jpg



19429853_1206412976153065_9120601356440802260_n.jpg
 
.
Back
Top Bottom