Centurion2016
BANNED
- Joined
- Jun 4, 2016
- Messages
- 864
- Reaction score
- -31
- Country
- Location
The are two tech demonstrators of the j31.
The engine I'd still a Russian power plant as the ws13,is still under development .
The plane needs ten more prototyoes to test engines radar ew suites and new weapons.
This plane then needs the infrarstucture support to be built .
I think we are talking ten years before it's exported any where.
Reality is paf will have to wait until 2027
Pakistanis immediate focus should how to check mate the su30mki and soon to arrive rafale f3,.
The French will deliver the first batch in 2019.
The last of 272.mki will be delivered in the same year.
At this stage Pakistan has not made a real effort to answer this threat by 2020 .
A new order of block 52 is needed or another stop gap until 2027 .
I'm.not convinced buying used f16 block a or b is a suitable doctrine now
The engine I'd still a Russian power plant as the ws13,is still under development .
The plane needs ten more prototyoes to test engines radar ew suites and new weapons.
This plane then needs the infrarstucture support to be built .
I think we are talking ten years before it's exported any where.
Reality is paf will have to wait until 2027
Pakistanis immediate focus should how to check mate the su30mki and soon to arrive rafale f3,.
The French will deliver the first batch in 2019.
The last of 272.mki will be delivered in the same year.
At this stage Pakistan has not made a real effort to answer this threat by 2020 .
A new order of block 52 is needed or another stop gap until 2027 .
I'm.not convinced buying used f16 block a or b is a suitable doctrine now