What's new

Chengdu J-10 Multirole Fighter Air Craft News & Discussions

Y8CA 079 radar testbed (j10B AESA)

1298182917_83929.jpg


link;¶¦Ê¢ÂÛ̳ ¾üÊÂÌìµØ ÔÎ~~ÄÇͼÄãÃǶ¼Ã»¿´µ½°¡£¿£¡
old pic

U2142P27T1D435855F3DT20070321104740.jpg

milit263.jpg

interesting indeed,
Y-8CB2.jpg

Y-8CA.jpg

and the latest update is
A single Y-8C transport aircraft (serial #079) was converted into a radar testbed by XAC as Y-8CA. It has been used exclusively by China Flight Test Establishment (CFTE) at Yanliang to test various airborne radar and related equipment. The most noticeable feature is a modular radome section which replaced the old Tu-16 style glass nosecone. Radomes in different shapes and sizes (pointed vs. blunt) can be adoped depending on the type of radar antenna being tested. The Y-8CA radar testbed first flew in August 1999 and was believed to have been involved in several key fighter and fighter bomber projects (e.g. J-10, J-11B & JH-7A). The aircarft also served as the testbed for the new JL-4 6-blade high-efficiency propeller installed on its #1 engine. The new properller has been adopted by the Y-8 Type III platform (KJ-200 & ZDK-03). Currently Y-8CA is testing the AESA radar of J-10B.
Chinese Military Aviation | China Air Force
here are two pix for good comparison
Y-8CB.jpg

J-10B5.jpg
 
Monday, February 21, 2011

The present and the future direction of J-10

As readers of this blog probably know, I have been a fan of J-10 for a long time. In many ways, the J-10 project marked a turning point in Chinese military aviation industry. When its development first started in 1986, the Chinese aviation industry was constantly abandoning new development projects due to lack of funding, technology and development experience. China was forced to go the conservative route and continue to develop J-7 and J-8 variants. Many J-7 and J-8 variants were delayed due to delays in avionics, engine and missile projects. With the exception of J-8, China had not successfully developed a fighter jet since the Soviet split. The J-10 projects succeeded in large part because China finally opened up itself to the West. The help that China received from Israel is well documented. However, I would say that another important help to J-10 and all recent aviation projects is the improved manufacturing capability, improved funding, access to advanced civilian technology and improved project management that came through the trade liberalization. For example, how would companies like NRIET be able to develop radar and avionics for PLA if China did not become competitive in the electronics industry? After 18 years of hard work by CAC, J-10 finally achieved operational status in 2004. With the success of the J-10 projects and advancement in civilian industry, we have seen a lot more stories of successes in Chinese military aviation industry in the recent years. I have read some real praises recently toward the aerospace engineers at CAC about their youthfulness and energy. I don't think we would've seen something like J-20 come out this soon, if CAC did not gain so much experience from the J-10 program.

Back when J-10 first came out, there were a lot of skepticism about its capabilities and deployment status. Even though the first J-10 regiment achieved operational status by 2004, many people questioned its status until it was officially declassified in late 2006. At the same time, I read many reports about its successes in exercises against different flanker variants. Most people were rightfully skeptical toward such reports. As time went on, it became more and more obvious that J-10 was taken over the reign as the backbone of PLAAF from flankers. Even now, we still often read reports about J-10s crushing flankers and J-8s in different training exercises. Even with all of its successes, the J-10 program still has experienced some stumbles along the way. I think most people would agree that propulsion is the biggest bottleneck for J-10. Due to lack of available domestic options and the Western arms embargo, China was forced to select AL-31FN as the powerplant. After the initial batch for J-10 prototypes, China has since placed orders for batches of 54, 100 and 122 AL-31FN engines for production variants. Many of us thought WS-10A might be available after the second batch of engines, but its production problems in the past 2 years have been well documented. As a result, China had to make that third purchase in 2009 for 122 AL-31FN costing $500 million. Due to the delays in WS-10A, J-10 production basically came to a standstill for most of 2008 and early part of 2009. Although, it is believed that some of the first product batch of J-10s delivered to 44th division were brought back to CAC to be upgraded to the latest configurations. From the first 154 AL-31FNs, CAC delivered J-10s for FTTC (60x8x), 131st regiment of 44th division (50x5x), 8th regiment of 3rd division (10x4x), 5th regiment of 2nd division (10x3x) and 2nd regiment of 1st division (10x2x). After signing the 3rd AL-31FN contract, CAC produced a 4th batch of J-10s to 70th regiment of 24th division (30x5x) and the special August First flight demonstration squad of 24th division. In this past year of 2010, CAC produced a 5th batch of J-10s of 37 single seaters + a good number of twin-seaters to fully convert the 25th regiment of 9th division (20x0x) and a good portion of the 12th regiment of 4th PLANAF division (83x4x). Since late last year, we have started seeing test trials of a 6th batch of J-10s from CAC. This batch will most likely be delivered to fill the 12th regiment of PLANAF and also convert a new PLAAF regiment. I think this will be the last batch of J-10s that can be produced from the third AL-31FN contract. Here is a breakdown of production J-10s at the moment:

6 PLAAF regiments (28 J-10s each  6 x 28 = 168)
12 J-10s serving in the August First demonstration squad
Around 16 J-10s serving in the FTTC aggressor squad
10 to 20 J-10s serving in the 12th regiment of PLANAF
So, my guess is that there are around 200 to 220 J-10s in service at the moment for different branches of PLAAF and PLANAF.

So, where does the J-10 program go from here? Some fans are already gushing over the first flight of J-20 and about ready to stop J-10 production very soon. Some question whether or not J-10B is needed at all. I definitely think those talks are crazy. China will have many J-7 regiments retiring in the coming years. I think some regiments will not be replaced, but PLAAF also does not want the fleet to shrink that much. I have brought up the talk of using JF-17 to fill a good number of the third tier regiments, but J-10s are still needed to replace more strategically located J-7 regiments. CAC has shown that it can mass produce J-10s at relatively low cost of less than 200 million RMB. Until J-20 joins service, J-10 and J-11 will form the core of PLAAF. Even though J-10 is smaller and cheaper than J-11, it has been the more capable air defense fighter jet. Therefore, even after J-20 becomes available, J-10 should still be continually produced. As we saw with J-7, CAC kept producing newer variants for PLAAF until at least 2007 even though J-10 was already operational with several regiments. So I think different variants of J-10s will be produced for the foreseeable future. In the immediate future, CAC will finish the 6th batch of J-10s to fully convert the 12th regiment of PLANAF and possibly fully convert another PLAAF regiment. I think this should be the end of J-10/A production run (about 240 to 250 using 276 AL-31FNs).

After this point, I think the production should shift to J-10Bs. We’ve seen the Y-8 radar test bed recently testing with what appears to be the nose of J-10B, so all signs are pointing toward J-10B production starting sometimes late this year or early next year. As stated before, J-10B should represent quite an improvement over J-10A when it comes to new avionics architecture, latest range of sensors (AESA radar, IRST and MAWs), new generation of MMI and more integrated EW installations. It should also have better multi-role capability and be able to fire all of the latest generation of AAMs, AGMs and PGMs (many shown in Zhuhai Airshow). The other question with J-10B and future J-10 variants is how it will move into the future world of stealth fighters. Clearly, future J-10 variants can be designed to have reduced signature like hornets to super hornets or eagle to silent eagle, but it cannot be redesigned into a LO aircraft. In fact, we are already seeing some greater consideration for stealth on J-10B when it comes to greater usage of composite material, integrated IRST/ECM, LPI radar and adoption of DSI inlet (although this could be more of a weight/subsonic performance vs supersonic performance tradeoff). There are also plenty of claims on Chinese forums that J-10B has also adopted plasma stealth, but I do not know how I can verify that. The other question is what engine will be used by future J-10s. Will China make a new large order for AL-31FN or will WS-10 series finally reach acceptable performance/reliability level to be installed on J-10B? We will have to keep the wait and see approach to find out. I would say that at least one more order of AL-31FNs is needed before WS-10 can become ready for both J-10 and J-11.

And finally, we should also see more export deals with J-10 in the coming years. As we’ve seen in numerous reports, PAF will be the first export customer for J-10, although we don’t know the exact configuration yet. After Pakistan, J-10 will probably be offered to most countries around the world. It will actually be interesting to see how that will affect JF-17’s export prospects, since most potential export customers would only select one of the two fighters. China will also not be able to export to many countries until WS-10 becomes a viable engine option.
Posted by Feng
 
Hui Tong's Chinese military aviation has update on J10B saying PAF has placed order for 36 units in Feb 2011
 
Hui Tong's Chinese military aviation has update on J10B saying PAF has placed order for 36 units in Feb 2011

we know that a MoU has been signed for 36 examples and PAF has 'finalised' its requirements and provided the same to the chinese. a formal agreement and terms are to be finalised and signed - the deal will be worth in excess of USD 1 billion, so the MoD/PAF have to find/allocate funds starting 2013-14 for this program.
 
we know that a MoU has been signed for 36 examples and PAF has 'finalised' its requirements and provided the same to the chinese. a formal agreement and terms are to be finalised and signed - the deal will be worth in excess of USD 1 billion, so the MoD/PAF have to find/allocate funds starting 2013-14 for this program.
Hannan was saying that the deliveries will start from Mid 2013. If i assume, he meant June, July 2013 then as Fiscal year prevails, the funding would either already have been allocated or will be allocated in FY-2012-2013 i.e. Current Year Post July
 
Hannan was saying that the deliveries will start from Mid 2013. If i assume, he meant June, July 2013 then as Fiscal year prevails, the funding would either already have been allocated or will be allocated in FY-2012-2013 i.e. Current Year Post July

china can only export the J-10 with a chinese engine!
 
china can only export the J-10 with a chinese engine!

I think Chinese has already think of that problem and has no problem exporting J-10. They even once demonstrate J-10 to a group of Serbia delegates who are intend to procure new fighter jet for their Airforce. In fact, CAC are also quite active in promoting J-10 for export.

With WS-10A going so well for J-11b so far. I think its a matter of time, J-10 will be fitted with domestic engine. And 2013 is still 2 years time. More than enough time to test out the WS-10A on J-10 and mature it.

Chinese has all the time prove everybody they do plan things before hand when organising a project. Remember those doubter claim JF-17 project will be stall becos Russian will refuse export of RD-93 engine to Pakistan and claim China has bad project management.. In the end , what happen?
 
china can only export the J-10 with a chinese engine!

not necessary, Pakistan is not a direct customer of Russia, like JFT case. So there will be a minimal resistence from russia as far as Pakistan is concerned. This may be different for other countries who are buyers of Russian equipment like Egypt, Malaysia, Indonesia and Bangladesh etc. Thats probably a reason why yet there is no confirmed exports contract of JFT (the problem with WS-13) as i can recall the post
According to Airforce people, we can not invest on an Engine we can not upgrade within its physical dimentions. WS series engine is so far not ready and I believe has some kind of set backs due to which some RD93+ like RD33MK version displayed as model in Zhuhai airshow might be the upgrade. The PAF person said, the time for WS engine incorporation has come and gone on JF-17s. We are happy with current Engine. May be Chinese mature the Engine in a couple of years but by then we'll be operating the russian Engine in numbers. The joint license manufacturing of RD93 did not materialize with China and Russia because Chinese are very much concerned with the JD10s engine. It is also expected to be russian AL-31FN for coming years.
So since WS-10A stil has considerable time to go, it is highly likely that at least the inital batch due in 2013 will be with AL-31F. China though has started to market J-10 for export but engines are the critical bottlenecks in export potential.
 

Latest posts

Back
Top Bottom