What's new

Al-Khalid tank (Type 90-IIM / MBT-2000) Information Pool

.
turret shown in the video on rotating table is placed upside down

HIT official never gave any exact figure of AK series sales price but number of times stated that its 1/3 of the price of western tanks.
Ak = 3000000 USD for PA
Ak1 = 3500000 USD for PA
 
.
5CD3CB71-31A2-4024-B107-D35C53F8D409.jpeg
 
. .
AK1 with FY4 mockup
FY-4 has been expected for AK-1 for a while, this mock-up confirms it.
This will likely be paired with a new Chinese engine and transmission (same one from VT-4) as the FY-4 will cause a considerable weight increase (also Ukraine cannot supply engines anymore). This AK-1 might even be equipped with said power train already, since the new engines were delivered over a year ago now.
 
.
FY-4 has been expected for AK-1 for a while, this mock-up confirms it.
This will likely be paired with a new Chinese engine and transmission (same one from VT-4) as the FY-4 will cause a considerable weight increase (also Ukraine cannot supply engines anymore). This AK-1 might even be equipped with said power train already, since the new engines were delivered over a year ago now.

Stripped down T-85IIM (AP)
5BEE440F-27CE-47C9-BE63-E51554BF13AB.jpeg
84655340-C8FE-451F-851A-59657F067084.jpeg
 
.
I’ve seen these. Just note that Type 85IIM isn’t an actual designation, it’s Type-85IIAP and Type 85-UG.

And these photos are pretty interesting, because we were able to determine from them that the Type 85UGs might possibly be getting armored upgrades, at least for the turret, since the turret shape in the second picture suggests that the UGs have been upgraded to the Composite package for the AK instead of their original one.
 
.
I’ve seen these. Just note that Type 85IIM isn’t an actual designation, it’s Type-85IIAP and Type 85-UG.

And these photos are pretty interesting, because we were able to determine from them that the Type 85UGs might possibly be getting armored upgrades, at least for the turret, since the turret shape in the second picture suggests that the UGs have been upgraded to the Composite package for the AK instead of their original one.
If there're no weight and space restrictions, it could easilly be upgared up to third generation of special armor by adding additional steel plates about ~30-40mm thickness.
 
.
If there're no weight and space restrictions, it could easilly be upgared up to third generation of special armor by adding additional steel plates about ~30-40mm thickness.
The shape of the turret in the second picture is similar to AK turret shape, Type 85-IIAP has less of a curvature, so I assume they did get the additional steel plates as in AK.
 
.
I’ve seen these. Just note that Type 85IIM isn’t an actual designation, it’s Type-85IIAP and Type 85-UG.

And these photos are pretty interesting, because we were able to determine from them that the Type 85UGs might possibly be getting armored upgrades, at least for the turret, since the turret shape in the second picture suggests that the UGs have been upgraded to the Composite package for the AK instead of their original one.
E3B2B41B-BE5A-461C-8D5C-8297F226A51F.jpeg
592831B8-BC3A-40DC-9B36-6D3B30F36268.jpeg
05DA554A-D655-4D0F-8F52-EB4171AC3C80.jpeg
02DFC6E5-87E0-44C0-81FF-CB3CA5A1ECC8.jpeg
61D17B61-5243-4A91-89B8-E402A50CF278.jpeg
 
. . .
Have seen them all, was one of our first glimpses into AK/UG composite package, it’s just a ton of steel at least in that picture, I’m sure there’s other materials to go on top that they don’t show. Some may say it’s a little crude but it’s definitely very effective.

Assalam-O-Aliakum
i am working on AL-KHALID 1 simulator.
can anyone provide some help? please!
What exactly do you need?
 
.
I don't agree with 1200 same Ho engine better we used on these Al Khalid a new 1590 ho engine to carry heavy equipment

 
. .

Pakistan Affairs Latest Posts

Country Latest Posts

Back
Top Bottom