What's new

‘Accidental fault’ disrupts electricity to swathes of southern Pakistan, including Karachi

HAIDER

ELITE MEMBER
Joined
May 21, 2006
Messages
33,771
Reaction score
14
Country
Pakistan
Location
Pakistan

‘Accidental fault’ disrupts electricity to swathes of southern Pakistan, including Karachi

Qazi Hassan | Dawn.com Published October 13, 2022 Updated about an hour ago




25


<p>Energy Minister Khurram Dastgir Khan speaks to reporters on Thursday.—DawnNewsTV</p>

Energy Minister Khurram Dastgir Khan speaks to reporters on Thursday.—DawnNewsTV
<p>A view of electricity transmission lines in Karachi. — DawnNewsTV</p>

A view of electricity transmission lines in Karachi. — DawnNewsTV
LISTEN TO ARTICLE1x1.2x1.5x
A major power breakdown took place on Thursday — amounting to 8,000 megawatts, according to the energy minister — depriving large swathes of southern Pakistan, including financial capital Karachi, of electricity.
The Ministry of Energy attributed the breakdown to an“accidental fault“ in the transmission system.
“Several power plants in the south are tripping in phases due to an accidental fault in the country’s southern transmission system. As a result, there have been disruptions in the supply of electricity to the country’s south,” the ministry said in a tweet following reports of power outages.

131144580b440e8.jpg


Later, Energy Minister Khurram Dastgir Khan, in a press conference was hopeful that electricity would be fully restored “to normalcy” by tonight, and announced that power had begun returning to parts of southern Punjab.
He shared the preliminary findings of the circumstances that led to the breakdown. “This morning at 9:16am, our two 500kv lines in the south — Karachi — there was a fault in both of them. I am not calling it an accident yet, because an inquiry has yet to be conducted. […] there was a fault in them and they fell, as a result the country’s southern region saw an electricity blackout.
“Our first priority was to isolate Karachi from it, and we were successful in doing so and we isolated Karachi from it by 9:45. By isolate, I mean that the 1,000MW that we provide to Karachi daily, was cut. But KE’s system is independently operational and is supplying electricity to [parts of] the city.”
He said as a result of the two power lines in which the fault developed, parts of Karachi, Hyderabad, Sukkur and Quetta, and partially in Multan and Faisalabad experienced power breakdowns.
Dastgir added that he was personally monitoring the progress of the restoration.
“As a result of this breakdown, a large part of our power plants are out of our system, around 8,000MW, of which we have restored 4,700MW,” he said.
“Electricity has been completely restored in Multan and Faisalabad. There is an issue in Hyderabad, but we have restored Sepco partially till Dadu. There is also [power] connectivity in Shikarpur, and because of partial connections in Sukkur. Qesco has been restored till Sibi.”
The minister said three teams were in the field: one was the reconnection team dealing with the cut-off conductors, the second team was for repairs, wherever needed, and the third team, was the inquiry team, which would submit a report to the ministry of energy in four days identifying the cause of the incident.
“Our biggest success is that we prevented a breakdown in the north. We limited the shutdown to the south through timely reconnection … the north was completely saved from the shutdown.
“We are trying to completely restore the system between maghrib and isha,” he said.
“It is taking time. The power plants that were shut down will take hours to restart. These include coal plants, Thar coal plants and nuclear plants in Karachi, wherever there has been tripping, plants are being restarted according to their technical specifications.
“We expect that those plants will start production in the next few hours, and as I said, we will completely restore the system between 7-8pm. Our priorities at present are [the restoration of power in] Karachi and Quetta and then Hyderabad too.”
He said the tripping developed near Karachi and moved northward. “There are two lines in Karachi’s south — NK1 and Jamshoro — there was a fault in them simultaneously.
He, however, insisted that there was no fault in the system in Karachi, only the transmission of 1,000MW from the national grid had been cut off. “When the plants will be restarted, 1,000MW supply will be restored [to the city].”
The minister hinted that human error could be responsible for the fault, though he wouldn’t confirm it until the inquiry team’s report arrives. “When the inquiry team’s report is received, if we have to take disciplinary action in its light, we will,” he added.
“We have to find the actual cause, whether it was an accident or there was another reason.”

High-level committee formed to probe outage​

Later in the day, the Ministry for Power constituted a high-level inquiry committee to ascertain facts pertaining to the partial breakdown.
According to an order issued by the National Transmission and Despatch Company Limited (NTDC), the committee will be headed by Muhammad Mustafa — Lahore general manager (technical) — and comprise Anwar Ahmed Khan, Muhammad Ijaz Khan, and Muhammad Zakaria.



It stated that the committee will be required to determine the root cause of the default, ascertain if the faults leading to the blackout could have been prevented, and verify if measures taken by concerned departments were adequate.
The committee will be required to submit a report within four days, the order added.

Senate panel issues summons for KE CEO​

Separately, Senate’s Standing Committee on Power issued a summon for K-Electric chief executive officer Moonis Alvi and instructed the police to arrest him and present him at the next meeting of the panel.
“Who is he? A gangster? What is this behavior,” Senator Saifullah Abro, the committee’s chairman, said in a meeting on Thursday.
He said that time had passed but KE had still not managed to prepare an agreement for the purchase and sale of electricity.
The committee also expressed anger over Dastagir’s absence from the meeting and took notice of the electricity breakdown across the country.
He observed that the NTDC had failed to provide adequate reasons for the power lapse. To this, officials of the power ministry said: “The southern parts of the country have been plunged into darkness.
“But sharing details [of the outage] will spread more panic,” they added.

KE says electricity in Karachi to be restored within few hours​

Earlier in the day, K-Electric spokesperson Imran Rana confirmed that the utility had received reports of “multiple outages” from different parts of Karachi.
“We are investigating the issue and will keep this space posted,” he said.



In an update posted around 11:45am, he confirmed that the suspension in electricity supply was due to a fault in the southern transmission system, as explained by the Ministry of Energy.
He added that work had been started to restore the supply and the complete restoration would take around five hours.



In Karachi, reports of power outages were received from localities near Rashid Minhas Road, Gulistan-i-Jauhar, Liaquatbad C-1 Area, Federal B Area’s block 11, 12 and 13, Nazimabad’s block 3 and 4, Kharadar, Lyari, Old City Area, Malir Halt, Rafah-i-Aam Society, Millenium Mall, areas near Dalmia Road, Gulshan-i-Iqbal Defence Housing Authority and PECHS.
There were also reports of the suspension of electricity supply to City Courts and accountability courts in the metropolis
 
.
Why is there only bad news coming out of this country?

Can they not even get one thing right
 
.
Why is there only bad news coming out of this country?

Can they not even get one thing right
When leaders steal the wealth of nation ...then accidents happened .

1665669147991.png
 
. .
What does it say? I can't read Urdu
population vs number of the ministers and their expenses. Comparison with few countries. Pakistan has a population of 220 million and the total number of cabinet members is almost 96 compared to the rest of the world where cabinet members are in 13,32 etc no perks and privileges, electricity for home, cellphone bill, air travel, bonus for showing up at parliaments ...alll free
 
Last edited:
.
Even mobile services are not working properly, i am only getting 2-3 signals rarely 4 today

1665670089338.png
 
.
Senate’s Standing Committee on Power issued a summon for K-Electric chief executive officer Moonis Alvi and instructed the police to arrest him and present him at the next meeting of the panel.

What the heck is this? Arrest a CEO if someone makes a mistake? Likely due to incompetence. Even if it is malicious, what can the CEO do about it?
 
.
Senate’s Standing Committee on Power issued a summon for K-Electric chief executive officer Moonis Alvi and instructed the police to arrest him and present him at the next meeting of the panel.

What the heck is this? Arrest a CEO if someone makes a mistake? Likely due to incompetence. Even if it is malicious, what can the CEO do about it?

The 500 kv distribution lines don't lie under KE if I am not wrong.
 
Last edited:
.
The 500 kv distribution lines don't under KE if I am not wrong.
Pakistan's major issue is transmission lines, very old and needs to be replaced, not power generation. 30 percent powerline loss, means people steal electricity, govt doesn't do anything.

تاروں اور کھمبوں کو تبدیل کرنے کی ضرورت ہے۔
 
.
Pakistan's major issue is transmission lines, very old and needs to be replaced, not power generation. 30 percent powerline loss, means people steal electricity, govt doesn't do anything.

تاروں اور کھمبوں کو تبدیل کرنے کی ضرورت ہے۔

Guess who started HVDC and other HV transmission projects in the last 3 years....but then Ahsan Iqbal comes and says 'PTI nay aik bhi power plant nhn lagaya!'.
 
.
Guess who started HVDC and other HV transmission projects in the last 3 years....but then Ahsan Iqbal comes and says 'PTI nay aik bhi power plant nhn lagaya!'.
Ahsan Iqbal is one jahil person/ Aristotle of his village, he is in politics because his mother was in Zia majlis shura and promoted by Zia.
 
. . .
The 500 kv distribution lines don't lie under KE if I am not wrong.
Then it is even more Mickey Mousey. National legislature wants to arrest CEO of a municipal utility for the failure of high voltage lines over which he has no control. Going by the past record, this order will be promptly unnoticed and ignored.
 
. .

Country Latest Posts

Back
Top Bottom