What's new

China Laos railway to start commercial operation on 3rd Dec 2021

The most profitable is the Eastern Line running along Vietnam. I think decision to build will come very fast in Vietnam after VPC got a wake up call seeing Laos China HSR.

The Western line can increase China logistic security and give China a quasi window at Indian ocean.

Central line which has the least efficacy got built first ironically -- as it is politically easiest.

1638680174867.png
 
Last edited:
The most profitable is the Eastern Line running along Vietnam. I think decision to build will come very fast in Vietnam after VPC got a wake up call seeing Laos China HSR.

The Western line can increase China logistic security and give China a quasi window at Indian ocean.

Central line which has the least efficacy got built first ironically -- as it is politically easiest.

View attachment 799057
I really hope the central line down to Singapore gets built.
 
I really hope the central line down to Singapore gets built.

What? from Laos to Singepore? how is that even feasible
 
What? from Laos to Singepore? how is that even feasible

Laos through Thailand to Malaysia to Singapore.
 
Laos through Thailand to Malaysia to Singapore.

Okay in that way it is feasible... I was first thinking are they gonna build under the sea or over the sea.. But yea via Thailand and Malaysia is feasible
 
The most profitable is the Eastern Line running along Vietnam. I think decision to build will come very fast in Vietnam after VPC got a wake up call seeing Laos China HSR.

The Western line can increase China logistic security and give China a quasi window at Indian ocean.

Central line which has the least efficacy got built first ironically -- as it is politically easiest.

View attachment 799057
Pretty amazing, the whole South East Asia will be seamlessly integrated with China by then.
 
Okay in that way it is feasible... I was first thinking are they gonna build under the sea or over the sea.. But yea via Thailand and Malaysia is feasible
'
Singapore is already connected to Vientiane by metre gauge railway. The Malaysia section will be fully electrified and double tracked by next year. The Thailand section (up to Nong Khai, just 20 km from Vientiane) are being double tracked (but not electrified). A single track line, about 10 km, connects Nong Khai station to Thanaleng station (near Vientiane) now. Thanaleng station is next to the South Vientiane cargo station of the China Laos railway (still not finished yet).
 
Last edited:
Delicious Thai cuisine
005WQCvwgy1gwv0yubbdaj31be0zk7o7.jpg

002Mxuhhly4gxb8e5cdnmj60u0140npd02.jpg
调整大小 002Mxuhhly4gxb8e4um5jj60u00gwtv002.jpg
调整大小 002Mxuhhly4gxb8e4ujtej60u00gw1b402.jpg

83ef24dagy1gx7p53ne5nj213u0tu13a.jpg
006tmBRYgy1gxdcsrtlp9j30u00u0gtm.jpg
727210d3gy1gxi2duw8vuj21900u0771.jpg
5f3017d1ly1gx6i9b4whgj21jk223b2a.jpg
调整大小 W020211216542736656860.jpg
727210d3gy1gxfdgt7d5dj21410u0wib.jpg
727210d3gy1gx6fj9f7bqj20zk0qoju3.jpg
727210d3gy1gxfdgt8tbhj21410u0n23.jpg
727210d3ly1gxeaorhjx8j21400u0do5.jpg
 
Pretty amazing, the whole South East Asia will be seamlessly integrated with China by then.

lets see if this railway is around in 10 years time

British railway made 200 years are still in operation

quality not quantity
 
lets see if this railway is around in 10 years time

British railway made 200 years are still in operation

quality not quantity
LOL, You are indeed a epic troll.
 

China Laos bullet train

727210d3gy1h0813y8azpj21400u07gd.jpg
727210d3gy1h0813z23krj21400u07es.jpg
727210d3gy1h0813z0wezj21400u0486.jpg
727210d3gy1gzglud8ob7j21sn0u0dmq.jpg
727210d3gy1gzgludi9unj21410u0tcx.jpg
727210d3gy1gzglud6c5zj21410u0n1w.jpg

727210d3gy1h1ahsyup20j218g0u0n4c.jpg

727210d3gy1h1i7oy9mtvj21400u0wlo.jpg

727210d3gy1h124tg69xwj21400u0qb5.jpg
727210d3gy1h124tferg8j21400u078h.jpg

727210d3gy1h1i7oytyrbj21400u0gw9.jpg

调整大小 97829852gy1h1hbk99h0xj22801o0b29.jpg
 
Last edited:
This is big debt trap for Laos.
 
This is big debt trap for Laos.
Lol, of course, all Chinese projects are "debt trap"
 
The most profitable is the Eastern Line running along Vietnam. I think decision to build will come very fast in Vietnam after VPC got a wake up call seeing Laos China HSR.

The Western line can increase China logistic security and give China a quasi window at Indian ocean.

Central line which has the least efficacy got built first ironically -- as it is politically easiest.

View attachment 799057
Its your Vietnam that has the Eastern line stalled, they dont want Chinese to build the railway lines in Vietnam fearing of strategic concern of unwarranted century old enmity towards China. Vietnamese like the Japanese to build the rail lines and other infras for them, China is in no hurry to build the line if Vietnam doesnt desire it. The Middle line went ahead becos Laos and Thailand want it build soon. The Western line is somewhat stalled becos Mymmar is not too ethusiastic about it.
 
Last edited:
Back
Top Bottom