What's new

Will Pakistan’s energy crisis ever end?

I cant know the reason of why each govt thinks only of small projects and nobody works on the lines of making bigger dams of Bhasha, Dasu and Kala bagh. What would be the starting point of these dams, I really cannot understand :mad: Bigger dams take at least 8-10 years of construction time, so why the delay even at this worst point of energy crises? haven't we learnt the lesson at all or the decision makers are waiting for even worse :mad::mad::mad:
 
23386-energycrisis-1406381020-164-640x480.jpg


Ever since the energy crisis hit the country, the whole nation is looking for an answer to one question – will it ever end? This is just one simple question which many governments have failed to address. The former Pakistan Peoples Party (PPP) government gave false hopes to the people and as evident, even after the end of their five-year tenure, there is no improvement in the energy sector and the people are left suffering from 10 to 14 hours of load shedding.

Since the formation of PML-N government with their aggressive energy policy cum metro bus approach, the question arises again whether their energy policies will help curtail the energy crisis till 2017 or at least reduce the number of load shedding hours.

Here is an analysis of the energy policy of Pakistan the government has released in October 2013. As per section 7 (1) of the National Power Policywhich defines the supply strategy, the government has planned a number of power projects which are expected to be completed during their five-year term. The following projects have being initiated by government expected to be completed by 2017-18:

energy.jpg


This means that if everything goes as planned, the government will increase the generation capacity by 5094 megawatt (MW) till the end of their five-year term. At present, we have an installed capacity of 22,797 MW and the average demand is around 17,000 MW while the short fall fluctuates between 4000 to 5000 MW.

The point of contention is whether the predicted figure of 5094 MW will be enough for curtailing the energy crisis in the country. A load forecast report published by National Transmission Dispatch Authority (NTDA)every year states that by 2017-18 the electricity demand in the country will go up to 35,000 MW.

Now, for instance, if we add 5094 MW into the national grid till 2017 and considering that the government brings installed capacity (22,797 MW) online by retiring the circular debt and reducing the line losses by 9%, which means adding 27,891 MW under ‘ideal circumstances’ by end of 2017 even then if the demand side is considered, we will still be facing a short fall of 7,109MW (35,000 – 27,891) by the end of 2017.

The National Energy Policy of 2013 reflects on the government’s attitude in resolving the energy crisis of the country. The government needs to seriously revise their energy policy keeping in view load forecast, otherwise the conditions will be worse than ever; the nation will probably experience load shedding of 15 to 20 hours a day and many remote areas will be left in darkness.

Almost 65% of Pakistan’s electricity production is based on thermal fuel sources such as Residual Fuel Oil (RFO) and High Speed Diesel (HSD) which are highly expensive and non-renewable sources of generation. Dependence on such fuels increases the cost of generation. On the contrary, it has a negative impact on the environment due to excessive carbon oxide emissions which result in climatic changes. Beside this, we are facing an acute shortage of gas as well. If the Iran-Pakistan gas pipeline had worked out, it would have been contributing substantially to resolving the energy crisis. But unfortunately, due to foreign pressure, the project eventually ended up in the loss of billions of rupees.

At present, to overcome the energy crisis and to meet future energy challenges, Pakistan needs to build micro-hydro projects. They are cheaper and one of the most reliable forms of renewable energy source.. We need to put our focus on energy conservation by minimising energy usage through developing effective energy management plans and ensuring its implementation in corporate, industrial and housing sectors. The government should set energy conservation standards for large, medium and small scale industries and encourage the industrial sector to reduce their energy consumption by benchmarking their energy usage and energy saving drives.

Moreover, Independent Power Producers (IPPs) should be provided subsidy and tax rebates so that they can enter into Power Purchase Agreements (PPAs) with industrial owners and sell electricity on cheaper rates to industries which will eventually help catering the demand of industrial consumers and decrease their reliability on the national grid.

Since solar technologies are becoming prominent all over the world due to massive decrease in cost per watt from $7 per watt to $1 per watt, the concept of Net Metering should be introduced to encourage domestic and commercial consumers to setup their own small scale grid connected Photovoltaic (PV) solar plants. This step will not only help boosting the PV solar market in Pakistan but will also result in adding surplus units to the national grid, favouring both the user and utility service providers.

Pakistan has abundant resources of shale oil and gas which needs to be explored and can be used effectively as alternative fuel for electricity generation. According to Energy Information Administration (EIA), a US agency working on energy statistics and analysis has estimated recoverable shale gas reserves of 105 Trillion Cubic Feet (TCF) and more than nine billion oil barrels within Pakistan. Thus overcoming the energy crisis in the five-year term for any government will not be a problem if the existing resources are utilised effectively.

If we really want to resolve the energy crisis in our country, our policy should focus on demand based energy conservation and load forecasting of the upcoming years, and an effective implementation plan. Otherwise, we will end up building more circular debt, hence leading to prolonged periods of dark ages.

Will Pakistan’s energy crisis ever end? – The Express Tribune Blog

well that 35000 demand is a bit too high, but I think demand will increase more than power added..

if at priority basis the govt uses all resources to build dams, only then by 2035, we shall be able to keep up pace with the increasing demands...

we need to promote alternative energy resources as well.. like facilitate solar power and home based power houses to be connected with the main grid like in Australia or Scotland etc.

Taxes on solar panels: Say bye to cheap electricity | Page 4

patwaris who rejoice at metro, should start using their brains...
 
Last edited:
Our Energy problems will be solved the day we can overcome the ' OIL LOBBY " in Pakistan.

There was no reason to scrap the Gas Pipeline project with Iran.
 
India is betting big on Nuclear and Hydel power. I believe Pakistan should do the same. Wind and Solar energy although are clean and all are costly and cannot produce power in bulk. Electricity generation is one field where India and Pakistan can cooperate extensively
 
Given the rates of increase in population and of their power demands, and given the rates of increase in generation and distribution, coupled with gross corruption and mismanagement, all taken together means that Pakistan's energy crisis will continue for the next few decades at least.
 
Government of the day always want to show how great they are doing & journalists don’t know much about energy, hence false hope that energy shortage will be overcome with next 3-years. Reality is quite different.

People in Pakistan are being fed with the news of large Solar Power & Wind power plants. Do people realise that a wind mill farm of 100 MW capacity will only produce 100MW at ‘Peak’ wind speeds. It will produce far less when the wind is slow and over the year it would average about 30 MW only. Solar plants average even less, because there is no sun at night; average production from 100 MW capacity solar panel plant over 12 months would be only about 25 MW. On the other hand, fossil fuel plants such as 100 MW coal burner would produce about 75 MW; this is because it would be shut down annually for maintenance.

As an engineer and someone who knows a little about electricity generation; I always look at the ‘Forecast’ figure with a pinch of salt. Firstly all the projects listed above have to be completed on time. Secondly and most important is transmission. Pakistani transmission lines are old and faulty. Even if you add the capacity, how are you going to get it to the consumer? Existing system is certainly unable to handle additional 4 to 5,000 MW of power.

Because for the last 7 years we always had gas & electricity shortage; we don’t really know what the level of electricity demand actually is. Population is increasing at an alarming rate therefore our gas & electricity demand is increasing. It is estimated that gas short fall alone will reach 8-billion cft by 2025. What would be the power shortage level after 3 years?

Let us wait and see before jumping with joy at the thought saying good bye to the power shortages.
 
Last edited:
Back
Top Bottom