What's new

Testing of the machines for the Saudi aircraft structures factory

The SC

ELITE MEMBER
Joined
Feb 13, 2012
Messages
32,233
Reaction score
21
Country
Canada
Location
Canada
Eng. Munir Bakhsh speaks about the successful testing of the machines that have been contracted to be part of the aircraft structures factory. According to him, he said there are three machines one for the manufacture of wings of the aircraft, the second for the manufacture of fuselage and the third for parts of the composite materials in the components of the aircraft.
There are 18 Equipments in total ..

Engineer Munir is a Saudi engineer..one of the prides of KSA. He worked for many years as head of aircraft design at Boeing in America.


https://twitter.com/ba



khsh_muneer/status/993603940448120832
 

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom