What's new

‘Tejas’ LCA project likely to be completed in 2015

Ashoka The Great

FULL MEMBER
Joined
Jan 18, 2012
Messages
257
Reaction score
0
Country
India
Location
Oman
HAL_Tejas_LCA.jpg


The country’s indigenous Light Combat Aircraft (LCA) ‘Tejas’ programme is now expected to be completed only by March 2015 and is one of the major projects undertaken by the Defence Research Development Organisation(DRDO) which is running behind schedule by several years, the Rajya Sabha was informed on Wednesday.

Union Defence Minister A K Antony said in a written reply that the deadline for the ‘Tejas’ project, which was originally scheduled for completion by December 2008, was likely to be extended till March 2015 as it had already breached the December 2012 revised deadline.
The IAF is eagerly waiting for the DRDO to complete the LCA project so that it could replace the ageing Soviet-era MiG-21s,which had earned the sobriquet’flying coffins’ following the numerous air crashes involving them.

The Upper House was also informed that as many as 34 MiG fighter planes had crashed in the last five years and six pilots were killed in the accidents along with five civilians. As for the DRDO’s delayed projects, the minister noted that the Naval LCA was now scheduled for completion by December 2014 as opposed to its original schedule of March 2010.

The Naval LCAs are likely to be the combat air element of the country’s first Indigenous Aircraft Carrier (IAC) that is now under construction at the Cochin Shipyard (CSL) and which in all likelihood may join the Navy by December 2015.

Similarly, the indigenous aeroengine ‘Kaveri’, which the DRDO had been developing for the LCA too was badly delayed, resulting in the Hindustan Aeronautics Limited (HAL) going in for the American GE F414 engines for the Mark-II versions of the combat plane.

The Airborne Early Warning and Control System (AEW&CS), a transport aircraft-mounted radar known as a major force multiplier capable of being an ‘eye-in-the-sky’ for the Indian armed forces, too has been delayed and will now be ready only by March 2014.

Also running behind schedule is the Long Range Surface-to-Air Missile (LR-SAM), which is now scheduled for completion only in December 2015.

Antony said the reasons for the delay in these projects included ab initio development of the state-of-the-art technologies, non-availability of trained and skilled manpower to work on the projects and lack of infrastructure and test facilities in the country.

Regarding the delay in the ongoing Scorpene submarines’ project at the Mumbai-based Mazagon Docks Limited (MDL), the minister blamed it on the slow procurement of the raw materials. “The project is being closely monitored by the Union Ministry of Defence (MoD) and the Navy to ensure its completion without any further delay,” he said.

Link - ‘Tejas’ LCA project likely to be completed in 2015 | idrw.org
 
Good for you, after a decade delay we finally can see it done. I hope it will be finished on time this time, but I do not have any confidence on it, everyone knows the reason...:welcome:
 
I thought it was suppose to be ready by 2014?


Business Line : Companies News : Battle-ready Tejas fighter unlikely before 2014

The battle-ready version of the country's fighter plane, Tejas, may not emerge before late 2013 or 2014 going by its present pace.


If it keep on getting delays, how can any one trust that it will ever be ready. The longest thread in PDF, the LCA thread, is going to double in length before this plane is ready.
 
Good for you, after a decade delay we finally can see it done. I hope it will be finished on time this time, but I do not have any confidence on it, everyone knows the reason...:welcome:

If you are Trying to score a Point - You are Grossly Wrong.

Rationale -

1) Massive Build up of Technological and Industrial Base - Thanks to LCA project.
2) The A/c if is not Delivered will have No Iota of Impact as we are Purchasing Rafale/Sus/FGFA.

Bottomline - You should be worried Days of PLAAF superiority of 80s has been Eroded.
 
I have seen the serial production facilities already being setting up for LCA in Bangalore :cheers:. I think the article is indicating correct time line.

India need point defense fighter jets in large numbers vis-a-vis against China in the North east of India. LCA will be inducted in huge numbers. A home grown potent interceptor and point defense fighter is always advantageous.

May be HAL will even go for stealth LCA in future .
 
It would be better to call DRDO/HAL Heads before parliamentary committee and have one-on-one session (akin to what they do in US senate). Let these guys satisfy the committee before asking any further budgets and responsibility be fixed.
 
I have seen the serial production facilities already being setting up for LCA in Bangalore :cheers:. I think the article is indicating correct time line.

India need point defense fighter jets in large numbers vis-a-vis against China in the North east of India. LCA will be inducted in huge numbers. A home grown potent interceptor and point defense fighter is always advantageous.

May be HAL will even go for stealth LCA in future .

Yea production line for tejas is building up... As per source there will be two production line going side by side just to make up for delay...
 
The only outcome of this project is..... "Learning of How to create a combat aircraft". The project becomes meaningful.... if the learning is used properly in the future projects..... Otherwise i would call it a total failure.....
 
Dates are useless when it comes to Indian project..... how many more date we will see on this forum about Tejas completion last i heard it was end of 2013 and now it is 2015......
 
I thought it was suppose to be ready by 2014?


Business Line : Companies News : Battle-ready Tejas fighter unlikely before 2014

The battle-ready version of the country's fighter plane, Tejas, may not emerge before late 2013 or 2014 going by its present pace.


If it keep on getting delays, how can any one trust that it will ever be ready. The longest thread in PDF, the LCA thread, is going to double in length before this plane is ready.

they once said 2012

Tejas to be inducted into IAF by next year
 

Latest posts

Back
Top Bottom