Tarbela Hydropower project IV extension

.
China has successfully inserted a 120-meter straw, more commonly known as steel pipe, into the Himalayas to control silt deposit, enabling increase of power generation capacity in Tarbela dam.

The silt at the bottom of the hydropower station was an impediment that needed to be removed before expansion the dam that was announced in 2013. To combat the issue, Chinese engineers decided made use of airlift for silt removal by inserting a 120 meters’ long pipe, the largest in the world, into the bottom of the hydropower station. The due process took four months to remove about 14,000 cubic meters of sludge.

In 2013, Pakistan had decided to expand the Tarbela Hydropower Station under Chinese assistance as per the initiates of BRI. Tarbela hydropower station is located in the fault zone of the Himalayas, which greatly increases the difficulty of the extension project due to a large inflow of sediments. However, the newly-inserted steel pipe helps to airlift the sediments, increasing approximately 1.41 million kilowatts of electricity subsequently.

The Tarbela 4th extension hydropower station is currently the largest power supply base in Pakistan, with an average annual power generation of 11.5 billion kWh, quoted Chinese media on Monday in local paper.

It also quoted that despite Chinese Three Gorges Dam being the largest hydropower station in the world and the largest hydropower construction project ever undertaken in China, its annual power generation is about 100 billion kWh, amounting to 20% of the national hydropower generation. However, Chinese engineers did not face such an issue with these dams relating to removal of soil or sediment at large.

Regarding the matter, Pakistan Minister for Water Resources Makhdoom Khusro Bakhtiar told Senate earlier that the total sediments deposited in Tarbela reservoir from 1974 to 2017 amount to 4.731 Million Acre Feet (MAF).
 
.
China has successfully inserted a 120-meter straw, more commonly known as steel pipe, into the Himalayas to control silt deposit, enabling increase of power generation capacity in Tarbela dam.

The silt at the bottom of the hydropower station was an impediment that needed to be removed before expansion the dam that was announced in 2013. To combat the issue, Chinese engineers decided made use of airlift for silt removal by inserting a 120 meters’ long pipe, the largest in the world, into the bottom of the hydropower station. The due process took four months to remove about 14,000 cubic meters of sludge.

In 2013, Pakistan had decided to expand the Tarbela Hydropower Station under Chinese assistance as per the initiates of BRI. Tarbela hydropower station is located in the fault zone of the Himalayas, which greatly increases the difficulty of the extension project due to a large inflow of sediments. However, the newly-inserted steel pipe helps to airlift the sediments, increasing approximately 1.41 million kilowatts of electricity subsequently.

The Tarbela 4th extension hydropower station is currently the largest power supply base in Pakistan, with an average annual power generation of 11.5 billion kWh, quoted Chinese media on Monday in local paper.

It also quoted that despite Chinese Three Gorges Dam being the largest hydropower station in the world and the largest hydropower construction project ever undertaken in China, its annual power generation is about 100 billion kWh, amounting to 20% of the national hydropower generation. However, Chinese engineers did not face such an issue with these dams relating to removal of soil or sediment at large.

Regarding the matter, Pakistan Minister for Water Resources Makhdoom Khusro Bakhtiar told Senate earlier that the total sediments deposited in Tarbela reservoir from 1974 to 2017 amount to 4.731 Million Acre Feet (MAF).
great news
 
.
Tarbela was due for extensive silt removal since decades past. In fact all dams are fated to die due to silt filling their reservoirs. WAPDA has been increasing the height of the dam to compensate for it as dredging and extracting silt is very expensive. Now as they removed it thus there is greater capacity in the reservoir, in turn the water volume then can turn more turbines and at a faster rate. This way, the 4th extension becomes viable. Similarly the 5th extension will also need even more silt removal to become viable.
 
.