What's new

T-129 Atak & Turkish Attack Helicopter Programs

It seems like a mock up of T-629 , atak 2 has 2 designs leaked, one in the TAI app and the other from idef.

EZqVKqyXQAcHojy

EZqVgqNWoAAafbR


I mean its ugly but its the first mock up leaked so far so we will see.
look ugly and cheap hope they make it better then this the real one .
 
. . .
I hope this is a mock-up for the demonstration. Otherwise, this design can cause some unwanted social responses. But if it works, it works.
 

Attachments

  • 2020-06-04_12-01-59.jpg
    2020-06-04_12-01-59.jpg
    161.2 KB · Views: 48
.
Easy bro's thats just a flight test bed weapons , flir etc for simulation to weight. When new flir and local made 20 mm come it would be diffrent.

Topun mühimmat şeridi bile yok daha öylesine koymuşlar.
 
.
I dont care about the looks or the design if it proves to be a badass killing machine that will roast terrorists with excellent efficiency


Exactly- It won’t go to a beauty contests. Looks doesn’t matter at all. What matters in the end of the day is the platform to be efficient, cost effective and to do its job well. That’s what matters in a war.
 
. .
I want to see the full matured, flyable prototype, to be honest I also expected more because they plan already the first flight this year so that mock up kinda disappointed me but its a mock up and not a prototype so we will see
 
. .
I like how it looks a lot... Yes I said it. :D

Reminds me a bit of the Tesla Cybertruck which looks strange at first but grows on you with time. If they choose that design I am sure that by the time it’s ready for work it will be flawless. I have complete trust in our engineers and designers.
 
.
I expect TAI will reveal official design of T-629 in following days. After introduced the mock-up, I think It is needed to introduce the official design lines of matured T-629 into the public. With this way, We will have more impression about it.

Acc to Tolga Özbek, The T-629 has a MtOW around 7,5t. I don’t know whether It is true but that is new to me.

https://tolgaozbek.com/haberler/havacilik-endustrisi/t629-boy-gosterdi/
 
. .
I expect TAI will reveal official design of T-629 in following days. After introduced the mock-up, I think It is needed to introduce the official design lines of matured T-629 into the public. With this way, We will have more impression about it.

Acc to Tolga Özbek, The T-629 has a MtOW around 7,5t. I don’t know whether It is true but that is new to me.

https://tolgaozbek.com/haberler/havacilik-endustrisi/t629-boy-gosterdi/
Tolga Ozbek claimed that "t629 is modified Gokbey" just a couple months ago.
 
. .
I expect TAI will reveal official design of T-629 in following days. After introduced the mock-up, I think It is needed to introduce the official design lines of matured T-629 into the public. With this way, We will have more impression about it.

Acc to Tolga Özbek, The T-629 has a MtOW around 7,5t. I don’t know whether It is true but that is new to me.

https://tolgaozbek.com/haberler/havacilik-endustrisi/t629-boy-gosterdi/

I hope that. Still there is no info on tusas.com
 
.

Pakistan Defence Latest Posts

Country Latest Posts

Back
Top Bottom