What's new

Sukhoi-Brahmos marriage only in mid-2016

Rangila

SENIOR MEMBER
Joined
Feb 20, 2013
Messages
2,211
Reaction score
-2
Country
Venezuela, Bolivarian Republic Of
Location
Argentina
Sukhoi-Brahmos marriage only in mid-2016 - The Times of India

Sukhoi_With_Brahmos.jpg



Bengaluru: The Indian Air Force (IAF), which has been waiting to enhance the surgical striking abilities of its best fighter aircraft - Sukhoi-30 MKI - has to wait till mid-2016 as the project to marry the aircraft with the Brahmos air-launched cruise missile still awaits quality certification.

At a time when China is test-flying its next-generation aircraft, Pakistan's JF-17 will be matched by the next version of our Light Combat Aircraft Tejas expected only after 2021, and the US talking of selling more F-16s to Pakistan, the integration of Su-30s with Brahmos is crucial. The integration will enable striking at targets 300km away and defence PSU Hindustan Aeronautics Limited (HAL) has already handed over a modified Su-30 in February 2015.

Brahmos Aerospace, which will integrate the missile with the aircraft, is yet to complete certification of the launcher. Brahmos Aerospace CEO Sudhir Kumar Mishra said: "Anything that goes into an aircraft has to go through a stringent qualification process."

He said the launcher's main release system completed the qualification process on December 11 and the qualification of the emergency release system is under way. IAF's initial requirement is two Su-30 MKIs with BrahMos but it eventually wishes to integrate 216 missiles on 42 Sukhois. The project was conceived in July-August 2012. Mishra said: "Once quality certification is complete, we must do shock tests. Each system must go through at least 100 tests. We can carry out only two-three tests a day."

He said it'll take 40-45 days to complete these tests, following which the first flight with a dummy missile will be carried out. "We can expect that by next March. So the first flight with the live missile can happen only in mid-2016," he said. Earlier, the agencies involved had to overcome the challenges of modifying the fuselage to accommodate the nine-metre missile.

The IAF is keenly backing the project, sources said. A retired Air Marshal said the IAF understands the complexities involved. "The aircraft is foreign and the missile is indigenous. There will be issues with the first couple of aircraft," he said, adding that there has support from the Russian Original Equipment Manufacturer.
 
. . .
.
This is old news now. The mating has been done, Identification and modification process to be initiated once final numbers decided. The test was done early this year. As usual India playing smart - releasing old news (read once something has already been done sometime back)

If you check the old news against this. You will find couple of new lines.
Bring the old one.
 
.
If you check the old news against this. You will find couple of new lines.
Bring the old one.

Rangila I mean that the thing has already been done .... 03 tests were done in March-April in Bay of Bengal .... 01 x Land version BrahMos, 01 x K4 SLBM test and 01 x Air Launched .... this has already happened. So chill. It is like India is set to acquire high energy weapons ..... DEW mounted SPICE are already in Indian inventories ... so that is why the reporting is old ...

I just googled this up for your read for DEW weapons

Indo Israeli Dew Missile | Indian Defence Forum
 
.
Rangila I mean that the thing has already been done .... 03 tests were done in March-April in Bay of Bengal .... 01 x Land version BrahMos, 01 x K4 SLBM test and 01 x Air Launched .... this has already happened. So chill. It is like India is set to acquire high energy weapons ..... DEW mounted SPICE are already in Indian inventories ... so that is why the reporting is old ...

I just googled this up for your read for DEW weapons

Indo Israeli Dew Missile | Indian Defence Forum

DEW is another stuff.

He said the launcher's main release system completed the qualification process on December 11 and the qualification of the emergency release system is under way

Above is latest.
 
. .
So sukhoi "mated" brahmos...
Marriage done, first night done.....
Honeymoon extended going on..
Good news will be what?
This
images

Or
This

images




Hope the smaller version comes out soon so that each mki can carry 3 instead of 1
images
 
.
Alas!
This is good news for those in the Sukhoi-BrahMos crosshairs.
 
Last edited:
.
Is this envisaged in a marine strike role or a land attack mode or both? It would be awesome if a marine strike role is also included. With their long legs and sensors and additional A2A payload, a single MKI will be a strike package.
 
.
Why do we need such heavy cruise missile on Sukhoi. This missile ll end up damaging couple of Sukhoi.

Brahmos corporation should be working on brahmos medium weight.
If they can't then let's just wait for Nirbhay ALCM in 2-3yrs
 
.
Is this envisaged in a marine strike role or a land attack mode or both? It would be awesome if a marine strike role is also included. With their long legs and sensors and additional A2A payload, a single MKI will be a strike package.

In both.
 
. .
penetrating a pussy is homo!

I see you totally missed the point. It's a defence forum and you people are spewing your fantasies here talking shi. There's girls here too. WTF.
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom