Zarvan
ELITE MEMBER

- Joined
- Apr 28, 2011
- Messages
- 54,463
- Reaction score
- 87
- Country
- Location

The Project 11356 frigate was handed over to the Russian Navy at the end of 2017. Source: TASS
The Project 11356 frigate Admiral Makarov , built by the Yantar Shipyard (a subsidiary of Russia’s United Shipbuilding Corporation: USC) in Kaliningrad, has been handed over to the Russian Navy, USC stated on 26 December.
The ship will be based in Sevastopol.
Admiral Makarov was laid down on 29 February 2012 according to a design developed by the Severnoye Design Bureau and was launched on 2 September 2015. It is the third Project 11356 frigate built by the Yantar Shipyard for the Russian Navy.
Want to read more? For analysis on this article and access to all our insight content, please enquire about our subscription options at ihs.com/contact
(108 words)
http://www.janes.com/article/76843/russian-navy-receives-frigate-admiral-makarov