What's new

Question: CPEC vs Non-CPEC Chinese Investment in Pakistan

Hyde

SENIOR MODERATOR
Joined
Oct 20, 2008
Messages
20,543
Reaction score
20
Country
Pakistan
Location
United Kingdom
Hello

I have been trying to get data to estimate the Chinese investment in Pakistan. We all know CPEC is just a corridor laying foundation for future but the real monster (worrying factor for our neighbours) lies in the abundance of Chinese investment across Pakistan.

So if someone can please highlight as many projects as possible being funded by China as not part of CPEC, It will be highly appreciated. I will later come with a detail article of something I have been trying to write since months. I have got enough information in hand but it will be useful for me if I am able to get the list of such projects somehow

The example of Chinese Investments (onging projects, recently completed or proposed and awaiting to happen in near future)

  • Karachi Nuclear Power Plant
  • Chashma Nuclear Power Plant Unit 3, 4 & 5
  • Some Hydropower projects if you can provide any information as not part of CPEC
  • Transportation projects except Orange Line as part of CPEC
PS: The Karachi Nuclear Power plant Unit 2 of 1100MW itself costs around $10 billion dollars and the Unit 3 is likely to cost even more. The same is true for Chashma Nuclear Power plant Unit 5, I know some hydropower projects worth billions of dollars and they all are not part of CPEC etc.

So any detail about foreign investment will be highly appreciated

Anybody?

Thanks
 
.
CPEC Infrastructure Projects
#Project Name Length (KM) Estimated Cost(US$ M) Details
Road

1 KKH Phase II (Thakot -Havelian Section) 118 1,305 view details
2 Peshawar-Karachi Motorway (Multan-Sukkur Section) 392 2,846 view details
Rail Sector Projects
3 Expansion and reconstruction of existing Line ML-1 1736 3,650 view details
4 Havelian Dry port (450 M. Twenty-Foot Equivalent Units) 40 view details


CPEC-Energy Priority Projects
# Project Name MW Estimated Cost(US$ M) Details
1 Port Qasim Electric Company Coal Fired, 2x660, Sindh 1320 1,980 view details
2 Sahiwal 2x660MW Coal-fired Power Plant, Punjab 1320 1,600 view details
3 Engro thar 4x330MW Coal-fired, Thar, Sindh 1320 2,000 view details
Surface mine in Block II of Thar Coal field, 6.5 metric ton per annum (mtpa), Thar Sindh 1,470 view details
4 Gwadar Coal /LNG / Oil Power Project, Gwadar 300 600 view details
5 HUBCO coal power plant 1X660 MW, Hub Balochistan 660 970 view details
6 Rahimyar Khan Coal Power Project, Punjab 1320 1,600 view details
7 SSRL Thar Coal Block 1 - 6.5 metric ton per annum(mpta) Thar, Sindh 1,300 view details
SSRL 2×660 MW Mine Mouth Power Plant,Sindh 1320 2,000 view details
8 Quaid-e-Azam 1000MW Solar Park, Bahawalpur, Punjab 1000 1,350 view details
9 Dawood 50MW wind Farm, Bhambore, Sindh 50 125 view details
10 UEP 100MW wind Farm, Jhimpir, Sindh 100 250 view details
11 Sachal 50MW Wind Farm, Jhimpir, Sindh 50 134 view details
12 Suki Kinari Hydro power Station, KPK 870 1,802 view details
13 Karot Hydropower Station, AJK & Punjab 720 1,420 view details
14 Matiari to Lahore Transmission line 1,500 view details
15 Matiari to Faisalabad Transmission line 1,500 view details

CPEC-Energy Actively Promoted Projects
# Project Name MW Estimated Cost(US$ M) Details
16 Gaddani Power Park Project (2×660MW) 1320 3,960 view details
Gaddani Power Park Project (Jetty + Infrastructure) 1,200 view details
17 HUBCO coal power plant 1X660 MW, Hub Balochistan 660 970 view details
18 Kohala Hydel Project, AJK 1100 2,397 view details
19 Pakistan Wind Farm II 2X50 MW(Jhampir, Thatta, Sindh) 100 150 view details
20 Thar mine mouth oracle, Thar Sindh 1320 1,300 view details
21 Muzaffargarh Coal Power Project, Punjab 1320 1,600 view details
22 Gas Power Plant 525 MW 525 550 view details



CPEC Projects Progress Update

# Project Name Progress Update Details
1 Port Qasim Electric Company Coal Fired, 2x660, Sindh
  • Financial Closed (FC) achieved.
  • Civil works on site started in January 2016.
  • Mechanical structure work started in March 2016.
  • Expected Commercial Operation Date (COD) first quarter 2018.
view details
2 Sahiwal 2x660MW Coal-fired Power Plant, Punjab
  • Sponsors have started construction from the equity.
  • Civil work is progressing adn is in advanced stage.
  • First unit by June,2017
  • Expected Commercial Operational Date (COD) 2017.
view details
3 Engro thar 4x330MW Coal-fired, Thar, Sindh
  • Financial Closed (FC) achived
  • First unit in system by December,2018
  • Team mobilized at site
  • Commercial Operation Date (COD) 2018/2019
view details
4 Surface mine in Block II of Thar Coal field, 6.5 metric ton per annum (mtpa), Thar Sindh
  • Financial Closed (FC) achived
  • Detail Design of mining in process
view details
5 Gwadar Coal /LNG / Oil Power Project, Gwadar
  • Master Plan being considered
  • Components of Gwadar Energy Projects
    • Power Plant
    • Transmission Network
    • Evacuation / Connection with National Grid
  • Summary for installation of LNG / Oil base power plant is undrer process.
view details
6 HUBCO coal power plant 1X660 MW, Hub Balochistan
  • Financial Close Expected by December, 2016
  • Commercial Operation Date (COD) expected 2018/2019
view details
7 Rahimyar Khan Coal Power Project, Punjab
  • Feasibility in process
view details
8 SSRL Thar Coal Block 1 - 6.5 metric ton per annum(mpta) Thar, Sindh
  • Commercial Operation Date (COD) expected 2018 / 2019
view details
9 SSRL 2×660 MW Mine Mouth Power Plant,Sindh
  • Expected Commercial Operation Date (COD) 2018 / 2019
view details
10 Quaid-e-Azam 1000MW Solar Park, Bahawalpur, Punjab
  • COD of 1st 100MW achived
  • 2nd and 3rd 100 MW under testing
view details
11 Dawood 50MW wind Farm, Bhambore, Sindh
  • Financial Close (FC) achived
  • Construction started
  • Commercial Operation Date (COD) September, 2016
view details
12 UEP 100MW wind Farm, Jhimpir, Sindh
  • Financial Close (FC) achived March 2015
  • Constructin started
  • Commercial Operation Date (COD) September, 2016
view details
13 Sachal 50MW Wind Farm, Jhimpir, Sindh
  • Financial Close (FC) achived
  • Construction started
  • Commercial Operation Date (COD) June, 2017
view details
14 Suki Kinari Hydro power Station, KPK
  • Supplemental Agreement Approved.
  • Land acquisition in process
  • Commercial Operation Date (COD) 2020
view details
15 Karot Hydropower Station, AJK & Punjab
  • Land acquisition at advance stage, near to resolution
  • Financial Close (FC) August 2016
  • Commercial Operation Date (COD) 2020
view details
16 Matiari to Lahore Transmission line
  • Tariff Finalized
  • Commercial Operation Date (COD) expected in 2018 / 2019
view details
17 Matiari to Faisalabad Transmission line
  • Tariff Finalized
view details
18 Gaddani Power Park Project (2×660MW)
  • Under Study
view details
19 Gaddani Power Park Project (Jetty + Infrastructure)
  • Under Study
view details
20 HUBCO coal power plant 1X660 MW, Hub Balochistan
  • Financial Close Expected by December, 2016
  • COD expected 2018/2019
  • 30 Chinese on project site
view details
21 Kohala Hydel Project, AJK
  • Feasibility Study (stage-1) Tariff Announced by NEPRA
  • Land Acquisition process started
  • Enviromental Impact Assessment Study being updated
  • Expected Commercial Operation Date (COD) 2024
view details
22 Pakistan Wind Farm II 2X50 MW(Jhampir, Thatta, Sindh) view details
23 Thar mine mouth oracle, Thar Sindh
  • Feasibility in Process by Sponsors
view details
24 Muzaffargarh Coal Power Project, Punjab view details
25 Gas Power Plant 525 MW view details
26 KKH Phase II (Thakot -Havelian Section)
  • Finacial agrements signed
  • Project ground breaking done
  • Work commenced, Work in Progress
view details
27 Peshawar-Karachi Motorway (Multan-Sukkur Section)
  • Financial agreements signed
  • Project ground breaking done
  • Work commenced
view details
28 Expansion and reconstruction of existing Line ML-1
  • PC-1 approval under process
view details
29 Havelian Dry port (450 M. Twenty-Foot Equivalent Units)
PC-1 approval under process

view details
30 East-Bay Expressway
  • Work likely to commence in second/third quarter 2016
view details
31 Gwadar International Airport
  • Work likely to comence in third quarter 2016
view details
32 Construction of Breakwaters
  • Port operations to be enchanced/expeidted
view details
33 Dredging of berthing areas & channels
  • Port operations to be enchanced/expeidted
view details
34 Infrastructure for Free Zone & EPZs port related industries
  • Governemt of Baluchistan evaluate/process SEZ Proposal of Gwader region
view details
35 Necessary Facilities of Fresh Water Treatment and Supply
  • Framework agreement to be signed
  • Water supply both from Desalination and dams to be developed


view details
36 Hospital at Gwadar
  • Provision of Equipment of existing 50 bed hospital
  • Extension of additional 100 beds
view details
37 Technical and Vocational Institute at Gwadar
  • comments on grant application awaited
  • Proposal beign submitted to MOfcom
view details
38 Cross Border Optical Fiber Cable
  • Ground breaking cermony performed by the Prime Minister
  • Work commenced
  • Completion of Project December, 2017
view details
39 Digital Terrestrial Multimedia Broadcast
  • Feasibility report awaited from Ministry information broadcasting and national heritage
http://www.cpec.gov.pk/progress-update
@Aether Here u go Sir G. Full detail and also lots of more on website .
 
Last edited:
.
@Aether Here u go Sir G. Full detail and also lots of more on website .
I am sorry, I do not want to discourage you but as I said I was talking about Non-CPEC projects.

I already have that list in hand and in fact got more information than mentioned on that CPEC website such as terms and conditions of various loans of certain projects. The idea is that Media is criticising everything without doing any research whereas the entire list of projects are available in public since over 1 year or so as well as the terms and conditions of loans etc. This is the list of energy projects created by me as an example and I have also got information about expected date of completion and some other technical aspects.. I want to highlight different aspect of the project which is often neglected by the Media

projects.jpg
 
.
I am sorry, I do not want to discourage you but as I said I was talking about Non-CPEC projects.

I already have that list in hand and in fact got more information than mentioned on that CPEC website such as terms and conditions of various loans of certain projects. The idea is that Media is criticising everything without doing any research whereas the entire list of projects are available in public since over 1 year or so as well as the terms and conditions of loans etc. This is the list of energy projects created by me as an example and I have also got information about expected date of completion and some other technical aspects.. I want to highlight different aspect of the project which is often neglected by the Media

projects.jpg

Nice info. But you should have at least redacted your name. :D

Plus the fact that you are using fake Excel. :D
 
.
Nice info. But you should have at least redacted your name. :D

Plus the fact that you are using fake Excel. :D
it's just one of the raw files out of many :lol:

The information is also available on CPEC website (cpec.gov.pk)

As mentioned by another respectable member...

The only thing that lacks on CPEC website is, proposed projects not yet part of CPEC and projects like Karachi-Peshawar ML-1 being fully funded by China and ADB costing over 8 billion dollars instead of originally planned part funding over over 3 billion usd or so (effectively rising the figure of 46 billion usd to 51.5 billion usd...)

This thread is not about CPEC btw :D
 
.
Having enough power, the whole Pakistan will be a huge machine to produce goods, services and intelligence.
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom