Bunji
BUNJI HYDROPOWER PROJECT
Location The Project is located on Indus River near Gilgit. Power House and dam sites are 560 km & 610 km respectively from Islamabad.
Salient Features
Installed Capacity 7100 MW
Mean Annual Energy 24760 GWh
Design Discharge 1900 m3 /sec
Gross Head 445 m
Tunnel Length 7.8 km each, 5-Nos.
Type of Dam RCC Gravity
Height of Dam 200 m
No. & Type of Turbine 20 ,Francis Type
Total Project Cost
Project base cost
13498.3 Million US$
8104.6 Million US$
Gross Storage Capacity 0.20 MAF
Execution by WAPDA
Commencement Date -
Completion Date -
Financial Status Local (Rs. Millions) FEC (Rs. Millions) Total (Rs. Millions)
Original PC-I Cost 897,820.6 431,086.5 1328907.07
Status
The Project has been principally cleared by CDWP on 02.12.2015 for approval of ECNEC.
BUNJI HYDROPOWER PROJECT
Location The Project is located on Indus River near Gilgit. Power House and dam sites are 560 km & 610 km respectively from Islamabad.
Salient Features
Installed Capacity 7100 MW
Mean Annual Energy 24760 GWh
Design Discharge 1900 m3 /sec
Gross Head 445 m
Tunnel Length 7.8 km each, 5-Nos.
Type of Dam RCC Gravity
Height of Dam 200 m
No. & Type of Turbine 20 ,Francis Type
Total Project Cost
Project base cost
13498.3 Million US$
8104.6 Million US$
Gross Storage Capacity 0.20 MAF
Execution by WAPDA
Commencement Date -
Completion Date -
Financial Status Local (Rs. Millions) FEC (Rs. Millions) Total (Rs. Millions)
Original PC-I Cost 897,820.6 431,086.5 1328907.07
Status
The Project has been principally cleared by CDWP on 02.12.2015 for approval of ECNEC.