What's new

Pakistan's Economy Top 24 in World

AZADPAKISTAN2009

ELITE MEMBER
Joined
Sep 8, 2009
Messages
37,669
Reaction score
68
Country
Pakistan
Location
Canada
Pakistan 24th Economy in World.png


Growth year to year still a very position 4-5%

economicgrowth.png



If we consider that Japan for good 10 years has 0% or negative growth Pakistan is still moving forward




Gross-Domestic-Product-GDP-Per-Capita-in-Pakistan.png
 
Last edited:
. .
We held the #24 ranking prior to our Power Mega projects completing , and lack of electricity


Pakistan will have more Power plants completed in next 2 years
2,000 MW power will be added in term of Nuclear power

And from 2020 Pakistan will be Coal Exporter country based on Coal extractions happening in Sindh

NuclearPowerplant.png


https://www.power-technology.com/features/biggest-power-plants-chinas-belt-road-initiative/

Thar Mine Mouth Oracle Power Plant, Pakistan – 1,320MW


4l-Thar-Mine-Mouth-Oracle-Power-Plant-Image-450x340.jpg



Thar Mine Mouth Oracle is a proposed coal-fired power project in the Thar Block-VI of the Thar coal mines in Sindh province, Pakistan.

The preparatory works such as state tariff and shareholder agreements are in progress, while notice to proceed is yet to be issued.

Oracle Coalfields SEPCO and Yanzhou Coal are implementing the project, while Oracle has set up Thar Electricity (Private) Ltd for the implementation of the project. The company is expected to commission a 660MW supercritical unit in the first phase.



SSRL Thar SEC Mine Mouth Power Plant, Pakistan – 1,320MW
The $1.3bn SSRL Thar SEC Mine Mouth Power Plant is a CPEC power project under construction since 2017 in the Thar-Block-I region of Sindh province, Pakistan. The project will utilise coal produced from the 6.8Mtpa block I of SSRL Thar coal mine.

Mining operation at the open-pit block I site is ongoing, while commercial production is expected to be started by mid-2019. The SEC power plant will feature two 660MW supercritical boiler units and is expected to start commercial operation by the end of 2019.

Shanghai Electric Power Company is executing the coal-fired SEC power plant, while Sino-Sindh Resources is executing the coal mine project under the supervision of Thar Coal & Energy Board.


CPHGC Power Plant, Pakistan – 1,320MW

China Power Hub Generation Company (CPHGC) is a coal-fired power project in Hub city, Baluchistan province, Pakistan. It has been under construction since 2017.

The $1.91bn coal-fired power project will consist of two supercritical power generating units rated at 660MW each. The first phase will be inaugurated in the first half of 2019, followed by that of the second phase at the end of 2019.

The CPHGC joint venture between Hub Power Company (HUBCO, 74%) and China Power International Holding (CPIH, 26%) is implementing the project. The EPC and O&M contract was awarded to a consortium consisting of China Energy Engineering Group Science and Technology Development Co, CEEC Tianjin, Electric Power Construction, Tianjin Electric Power Construction Company, and China Energy Engineering Group.


Sahiwal Coal-fired Power Plant, Pakistan – 1,320MW

Operational since 2017, the Sahiwal coal-fired power plant is located in the Sahiwal region in the Punjab province, Pakistan. The project is built as part of the China Pakistan Economic Corridor (CPEC) initiative, a part of BRI.

Construction of the supercritical power project started in 2015 at an estimated cost of $1.91bn. The project consists of two supercritical units rated at 660MW each. It was connected to Pakistan’s national grid in 2017.

Huaneng Shandong and Shandong Ruyi Technology Group both hold a 50% share in the project. Punjab Power Development Board (PPDB) was the supervising agency and Huaneng Shandong Rui Group executed the project.



Port Qasim Power Project, Pakistan – 1,320MW

The coal-fired Port Qasim power project is located in the Sindh province of Pakistan and has been operational since 2018. It is another important project built under the CPEC initiative, as part of BRI.

The $1.91bn project was started in 2015 under the purview of Private Power and Infrastructure Board. The project consists of two supercritical 660MW boiler units. The first unit was inaugurated in 2017 and the second unit was connected to the grid in 2018.

Sinohydro Harbour was awarded the EPC contract for the project, while Harbin Electric and Dongfang Electric Corporation (DEC) supplied the plant equipment and generators. SEPCO III Electric Power Construction and Hebei Electric Power Design and Research Institute (HBED) were engaged by Power China for site selection and survey.


Kohala Hydel Project, Pakistan – 1,100MW



    • 3l-Kohala-Hydel-Project-Image-450x340.jpg

      Kohala hydel project is being developed by The China Three Gorges (CTG) Corporation on the Jhelum River. Image courtesy of Kohala Hydro Company Private Limited.
The Kohala hydel project is under construction on the Jhelum River, 85km east of Islamabad, Pakistan. The CPEC project is being developed on a build-operate-transfer model by the Chinese Three Gorges (CTG) Corporation.

The $2.36bn run-of-the-river hydropower facility will consist of a surface power station housing four 275MW Francis turbines. Upon commissioning in 2025, the plant is expected to produce an annual energy output of 5,079GWh.

CTG created Kohala Hydro Company to execute the project, which will be transferred to Pakistan upon operation by CTG for 30 years.


Suki Kinari Hydropower Project, Pakistan – 870MW
1l-Suki-Kinari-Hydropower-Project-Image-1-450x340.jpg

Suki Kinari hydropower project is being constructed on the Kunhar River in Pakhtunkhwa province, Pakistan. Image courtesy of CPEC.

The $1.8bn Suki Kinari hydropower project has been under construction since 2016 on the Kunhar River in the Pakhtunkhwa province of Pakistan. The project is being financed and will be operated as part of China Pakistan Economic Corridor (CPEC), a BRI segment.

To be connected to the grid by the end of 2022, the run-of-the-river project will feed an underground power station, which houses four 234.48MW Pelton turbines.

SK Hydro Group and Gezhouba Group are developing the project for which financing is extended by the Export-Import Bank of China and the Industrial and Commercial Bank of China. The Government of Pakistan agreed to purchase the electricity generated by the project for a period of 30 years.
 
Last edited:
.
We still need to update our stats and recalculate GDP based on 2015. I hope the govt brings in the informal sector to give a more realistic picture.
 
.
We still need to update our stats and recalculate GDP based on 2015. I hope the govt brings in the informal sector to give a more realistic picture.

Sad state of affairs , we need to be in top 5.
 
.
Pakistan will be Energy Independent from 2023-2025

What that just means is that the Shut down Industries will be running as power would be available and companies would be able to run 2-3 shifts per day , and Production will rise


Rough Estimate of Some power Projects Production

KANUPP3 (Nuclear Power Plant) - 1,100 MW
KANUPP3 (Nuclear Power Plant) - 1,100 MW
Thar Mine Mouth Oracle Power Plant, Pakistan – 1,320MW
SSRL Thar SEC Mine Mouth Power Plant, Pakistan – 1,320MW
CPHGC Power Plant, Pakistan – 1,320MW
Sahiwal Coal-fired Power Plant, Pakistan – 1,320MW
Port Qasim Power Project, Pakistan – 1,320MW
Kohala Hydel Project, Pakistan – 1,100MW
Suki Kinari Hydropower Project, Pakistan – 870MW

Energy Production : 10,770 MW (Will be added ...)

It is expected that we will see an industrial revolution with setup of economic centers


It is no
surprise that people who will invest now in Pakistan in 2019 will reap the massive rewards that will follow by 2025
DyPQyQHWoAAVbDF.jpg
 
Last edited:
. .
Government of Pakistan has invested in all fronts

  • Nuclear plants
  • Coal Power plants
  • Water/Hydral Power generation plants at Dams
  • Solar Plants

  • The Economic Business / Industrial Zones will be the upcoming phase of CPEC
 
.
If we are adding almost 10,000 MW energy (electricity in Pakistan) 2023-2025
Bhasha Dam will add another 5,000 MW energy when completed plus water 2025-2027

  • It is logical that 300MW could be used to power a Desalination plant , such a project would be great 50-50% Pakistan-Foreign Company partnership to create extra water for population

We have to take some pride that we are 24th out of 200-230 world countries

A $100 invested today in Pakistan would turn into $1000 dollar in 2027
 
Last edited:
.
If we are adding almost 10,000 MW energy (electricity in Pakistan) 2023-2025
Bhasha Dam will add another 5,000 MW energy when completed plus water 2025-2027

  • It is logical that 300MW could be used to power a Desalination plant , such a project would be great 50-50% Pakistan-Foreign Company partnership to create extra water for population

We have to take some pride that we are 24th out of 200-230 world countries

A $100 invested today in Pakistan would turn into $1000 dollar in 2027
You are 24th with 6th largest population out of 195 countries so that is not something to be proud of....
 
. . .
Honestly speaking higher PPP means nothing. It actually means we are spending way more than what we are earning. Indirectly it means our imports are very high. Our nominal economy is very bad.
 
.
For Pakistan to truly be a proper economy we need a modern electrified railway network that connects the north industrial area to the ports in the south.

WCML_freight_train.jpg


without these, we will always be a banana republic.
 
.
With surplus Electricity I think the electric train would be a reality
But trick would be having a "seperate electricity lines for trains" only for train
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom