what is NLC train different from PR ?
These engines are refurbished and bought from South Korea. Stocks are taken from PR on rent basis.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
what is NLC train different from PR ?
These engines are refurbished and bought from South Korea. Stocks are taken from PR on rent basis.
we r still making a huge mistakePakistan should take tech from china to rpeosuce tracks and engines.. Gawadar to quetta and jacobbaad can be another option..
taftan quetta and quetta zohb DI khan can be another option..
5 years of inflation + (and it is a big plus) 30% depreciation. Leken khata hai tu lagata bhi hai, kyun patwariyon? Bari yaad ati hai saday leader di @Jungibaaz @Xestan @volatile @ejaz007 @BATMAN
why dont u tell us wht to applause?It is nice to see GHQ paid idiots still applauding when they themselves do not know what to applaud.
The same were chest thumping PIA going into profit while CEO PIA yesterday told PM that PIA was incurring Rs. 6 billion loss per month.
The only one left supporting the current set up are those who themselves left Pakistan for a second rate citizenship in a foreign country.
110km/hr in this day amd age? Is this a joke? Pathetic.Feasibility Study for Up-Gradation of ML-1
-- An Over View A brief description of the results of the above referred feasibility study carried out by the Joint Venture comprising M/s CREEC of China (lead firm), M/s NESPAK and M/s PRACS from Pakistan, for the up-gradation of ML-1 railway line under CPEC, is provided in the forgoing paragraphs, for the information of the prospective bidders intend to provide consultancy services. 1. Project Area of ML-1 The project area pertains to ML -1, which extends from Kiamari (Karachi) in the south to Peshawar in the northwest covering 1,726 kilometres and passing through Hyderabad, Rohri (Sukkur), Multan, Lahore and Rawalpindi stations. ML-1 also includes the 91 km chord line between Lodhran and Khanewal and the 55 km section between Taxila and Havelian. Thus, ML -1 extends over a total route length of 1,872 kilometres. The entire railway track on ML -1 is broad gauge (1,676 mm or 5 feet 6 inches). ML -1 has 196 big and small railway stations. 2. Railway Sections/Segments included in ML -1 For the sake of the feasibility study, the existing railway infrastructure of ML -1 has been divided into the following seven (7) sections/segments:
S. No. Section / Segment Length (Kms) Existing Track Parameters 1 Kiamari - Hyderabad 182 Double track, designed for speed of 110 km/h and axle load of 23.3 tons
2 Hyderabad - Multan 748 Double track, designed for speed of 110 km/h and axle load of 23.3 tons
3 Multan - Lahore 334 Double track, designed for speed of 110 km/h and axle load of 23.3 tons
4 Lahore - Lalamusa 132 Single track, designed for speed of 105 km/h and axle load of 22.86 tons
5 Lalamusa - Peshawar 330 Single track, designed for speed of 105/80/65 km/h and axle load of 22.86 M-tons
6 Lodhran – Khanewal chord line 91 Single track, designed for speed of 110 km/h and axle load of 23.3 tons
7 Taxila - Havelian 55 Single track, designed for speed of 30 km/h and axle load of 17.24 tons
8 Establishment of Dry Port Near Havelian 9 Up gradation of Pakistan Railway Academy at Walton Total 1872
Pakistan Railways - EOI for Pre-Qualification of PMC for ML-1 (27) A sketch showing the railway sections/segments falling in ML -1 is given on the below: 3. Scope of the Consultancy Services for the already Conducted Feasibility Study of ML-1.
The study was to ascertain the existing condition of the infrastructure of ML -1, and submit recommendations for up gradation of the track and its other components so as to facilitate operations of passenger trains at 160 km/h and freight trains at 120 km/h. As far as possible, the up graded track would primarily follow the existing alignment, except where sharp curves are to be eased out or eliminated to allow higher speed. Wherever possible, but without compromising on safety of train operations, the upgradation process should make use of the existing structures and materials. The study was to examine the prospects of construction of a new double railway line between Kiamari and Kotri/Hyderabad. This line, 163 kilometres long, fit for 160 Km/h speed would facilitate the heavy movement of trains from Karachi to up country destinations in the future. Study was to examine the physical and academic up gradation of Pakistan Railways Academy at Walton so as to ensure capacity building of the human resources of Pakistan Railways. The study was to also examine the possibility of integrated commercial development of 8 railway stations along ML -1, namely, Karachi, Hyderabad, Rohri (Sukkur), Multan, Lahore, Rawalpindi, Peshawar and Quetta for commercially exploiting the land near the stations. The passenger facilitation for these stations shall be provided during up gradation of ML -1.
Electrification/electric traction of the entire ML -1 was also to be examined and recommendations submitted for its implementation. Pakistan Railways - EOI for Pre-Qualification of PMC for ML-1 (28) 4. Time frame for the Implementation of Different Projects under CPEC In line with the mutually agreed plan of the two governments (China and Pakistan) under CPEC and as approved in the Joint Cooperation Committees (JCC) meetings, the following time frames was to be followed for construction and train operations:
1. Short Term (2016 - 2021) Phase I 2018 Phase II 2021
2. Medium Term (2021 - 2026)
3. Long Term (2026 - 2031)
4. Beyond Long Term (2031 +)
5. Projects to be implemented during the Short and Medium Terms of the Time frame for ML-1
The projects to be taken up during the above stated timeframes were mutually agreed between the governments of the People‘s Republic of China and the Islamic Republic of Pakistan, and subsequently approved by the JCC meeting on 12th November, 2015 at Karachi.
However, in January 2016 when considerable data had emerged, PR officials and experts of PIU/PR/CPEC, reviewed the above referred timeframes and took the view that some of the projects included in Phase I of the Short Term and some projects of the Medium and Long Terms need to be modified so as to fulfil the demands of government and also to facilitate smooth train operations during the construction stage in Phase I and II.
https://www.pakrail.gov.pk/images/downloads/PrjMngConsultant.pdf
110km/hr in this day amd age? Is this a joke? Pathetic.
Well, if its 160 then it is good. But still not enough, 200 should have been the target.Theses are existing designed speeds.
The study was to ascertain the existing condition of the infrastructure of ML -1, and submit recommendations for up gradation of the track and its other components so as to facilitate operations of passenger trains at 160 km/h and freight trains at 120 km/h.
interesting, what happened to brand nawaj sharif that your baji tweetni was flaunting some time ago! as some re-birth of PIA?The same were chest thumping PIA going into profit while CEO PIA yesterday told PM that PIA was incurring Rs. 6 billion loss per month.
They were giving away free not firing everyone and closing the steel mill.interesting, what happened to brand nawaj sharif that your baji tweetni was flaunting some time ago! as some re-birth of PIA?
brand nawaj sharif was so successful that dar later offered free steel mill to nayone who buys PIA!
There was NO GLOBAL OUTBREAK THEN!
amazing logic, the famed kabaria's, self proclaimed lohar tubbar couldn't run state steel mill but its own bhattian never go extinct!! Why is that? if you are SO UPSET for people getting fired then why didn't tooi hakumat make it work?They were giving away free not firing everyone and closing the steel mill.