In terms of evaluating the T129, the Pakistan Army began the process in 2014 in Turkey. An Army team sent to Turkey was reportedly impressed with its performance. Under a framework agreement signed with the Turkish Undersecretariat of Defence Industries (SSM), a T129 ATAK was sent to Pakistan in 2016. The T129 P6 was received at Army Aviation Command in Multan on May 22, 2016.
According to TAI (via MSI Turkish Defence Review), the Army evaluated the T129 P6 in hot temperature conditions, high-altitude and, for a specific period, with limited logistics support. In Multan, it was 47° Celsius, while in Pano Aqil (another area where the T129 P6 was flown) it was 50° C. During its deployment test, the helicopter was put in a hangar in Quetta, an area where it did not drop below 48° C, through the night. The TAI team did not have access to spare parts and ground support equipment (GSE). From there, TAI flew the T129 to Himalayas, where the P6 was successfully flown at 14,000 ft at 23° C. It returned to Quetta, spending another night without its GSE. The final major test required TAI to directly fly the T129 from Quetta to Multan – i.e. 480 km – without any refuelling between the two locations.
In October 2017, Pakistan’s Prime Minister Shahid Khaqan Abbasi during his official visit to Turkey
confirmed that Islamabad was in talks with Ankara for the purchase of Turkish Aerospace Industries (TAI) T129 ATAK attack helicopters.
Z10s were returned back. Incorporation of WZ16 engines are still awaited. AH1Z future is uncertain due to current US policy. Spare parts for F16s are being delayed/stopped.
Now again news of continued evaluation process?