What's new

Pakistan Army APC Inventory

. .
NO, it was not a failure & it still in use & US upgrading a large fleet of them.
please read about the bradely scandle
sherman was also a failure
dont think US generals dont do mistakes
every one does
 
.
Pakistan needs a MRAP to be used by troops on western front....not an APC or IFV.
 
. .
On western border IFV and APC are needed it's cities and inside our own areas like Wazristan and other tribal areas where MRAP are needed and in large numbers
Sir,
the border with Afghanistan is mountain and hilly terrain, IFV and APC are easy targets there and will have mobility issues. Its best to use MRAP's on ground and air mobile forces otherwise.
 
.
On western border IFV and APC are needed it's cities and inside our own areas like Wazristan and other tribal areas where MRAP are needed and in large numbers
pakistan doesnt has any good APC anyway MRAPS are good in both places

Bradley was a failure. Must watch video about project management scope creep.

one reason why professionalism and open accountability is important
i like that fact about Indian armed forces

reminds of LCA lol
 
. . .
Baktar Shikan has some limitations and good points .

The good points are having a tandem warhead to beat ERA and spaced armour. The operation is easy and in some ways similar to TOW which PA already operated. It has anti-jamming capability also.

Limitations are that It is fired when stationary, as far as i know. Secondly, its not fire and forget. So the missile operator will stay engaged till the target is destroyed as he has to guide the missile to the target keeping target in his cross hairs.

121 TOW launchers were upgraded to fire TOW 2A RF missiles. That should provide fire on the move capability.
 
.
25660059_319185798583704_6382385580984074514_n.png
 
. . .
Will this be inducted in PA or it just like "yasoob" project
Problem with yasoob project was it was not planned for civilian use, hence the high cost of production. army only needed 400 trucks at that time. poor planning.
 
.
Problem with yasoob project was it was not planned for civilian use, hence the high cost of production. army only needed 400 trucks at that time. poor planning.


What is yasoob project?
 
.
Back
Top Bottom