Pakistan : 6 New Motorways & Highways Approved for Construction

.
ہاں بالکل ٹھیک کہا. گدھا گاڑی اور بھیل گاڑیوں کو واپس آنا چاہیے. اور وه اونٹوں کی لمبی قطاروں کے لیے تو کسی سڑک کی بھی ضرورت نہیں ھے
We are heading towards that Era in the Leadership of Handsome World Cup Winner.
 
.
Which new Industry made it umm many Punjab industrial estates initiated in which many new companies Factories are working like sundar industrial estate Etc
Bhai I literally stop reading after the highlighted part in your post quoted above

In Economic Industry does not mean a Factory or Industrial Estate or Zone but in Economics Industry is a Sector or Subsector of Economy of any Country For example Engineering as a whole is Industry it subsectors like Auto Industry, Equipment manufacturing are also termed as Industry ....

So plz read the my quotes in their contexts .... again ....
 
.
they bought the land for Diamer Bhasha Dam
IF they had started the actual building of the dam then around about now it would have been near completion! BUT why didn't they start it and say that it is on the back burner till 2037! Buying land and actually starting the project where the necessary aggregate is done was NEVER started! It was a takhti hanging procedure for vote batroney

Bhasha Dam delayed till 2037

July 9, 2014


LAHORE: The commissioning of multi-purpose Diamer Bhasha Dam on River Indus has been postponed by another about 17 years as this mega project, having strategic importance, is now expected to be completed in the year 2037 instead of 2020, literally converting the water crisis into an existential threat to the country.
According to documents available with The News, the Dasu Hydropower Project is being given preference to the Diamer Bhasha Dam, ignoring imminent threat of water shortage and floods.

https://www.thenews.com.pk/archive/print/639042-bhasha-dam-delayed-till-2037

Did tender and bidding for Mohmand Dam

Are you sure that mian did tendering for Mohmand dam?? The project has many hands in it but the actual construction started now!!!

"The project was handed over to the private sector in 2002 that failed to construct the dam and wasted seven years," he explained. "Consequently, the project was given back to Wapda in 2007." Durrani added that the French Development Agency (AFD) granted $8 million to conduct the dam's feasibility study, and gave another $1 million to carry out research on its environmental impact.

Pakistan's first hydroelectric power development policy was designed in 1995, while the second and third policies were introduced in 2002 and 2013, respectively. During the tenure of the PML-N, power plants with a cumulative capacity of over 10,000 MW became operational under the CPEC, but none of the plants generated hydroelectric power.

The feasibility study of the dam was completed by the Japan International Cooperation Agency (JICA) in March 2000, whereas its detailed engineering design was completed in April of 2017. The Executive Committee of National Economic Council (ECNEC) approved the dam's PC-1 amounting to Rs309, 558 billion during a meeting on April 26, 2018, while the government released Rs17 billion for the ongoing financial year 2018-19 to construct the dam. Moreover, 818 acres of land has been allocated to Wapda in relation to the construction of the dam.


https://tribune.com.pk/story/1965931/1-need-know-mohmand-dam

Bhai I literally stop reading after the highlighted part in your post quoted above

In Economic Industry does not mean a Factory or Industrial Estate or Zone but in Economics Industry is a Sector or Subsector of Economy of any Country For example Engineering as a whole is Industry it subsectors like Auto Industry, Equipment manufacturing are also termed as Industry ....

So plz read the my quotes in their contexts .... again ....
just give mian the credit for all of it. they need the credit for their shine. But we need the projects to start and complete!

Why PIA, Steel Mills Karachi and Power Sector were making loses and were 2nd highest in eating Government revenue if calculated on combined bases .... ???
you are asking the wrong question! The self proclaimed lohar couldn't make the national steel mill work BUT their bhattian never go extinct! How? Why?
 
.
IF they had started the actual building of the dam then around about now it would have been near completion! BUT why didn't they start it and say that it is on the back burner till 2037! Buying land and actually starting the project where the necessary aggregate is done was NEVER started! It was a takhti hanging procedure for vote batroney

Bhasha Dam delayed till 2037

July 9, 2014


LAHORE: The commissioning of multi-purpose Diamer Bhasha Dam on River Indus has been postponed by another about 17 years as this mega project, having strategic importance, is now expected to be completed in the year 2037 instead of 2020, literally converting the water crisis into an existential threat to the country.
According to documents available with The News, the Dasu Hydropower Project is being given preference to the Diamer Bhasha Dam, ignoring imminent threat of water shortage and floods.

https://www.thenews.com.pk/archive/print/639042-bhasha-dam-delayed-till-2037



Are you sure that mian did tendering for Mohmand dam?? The project has many hands in it but the actual construction started now!!!

"The project was handed over to the private sector in 2002 that failed to construct the dam and wasted seven years," he explained. "Consequently, the project was given back to Wapda in 2007." Durrani added that the French Development Agency (AFD) granted $8 million to conduct the dam's feasibility study, and gave another $1 million to carry out research on its environmental impact.

Pakistan's first hydroelectric power development policy was designed in 1995, while the second and third policies were introduced in 2002 and 2013, respectively. During the tenure of the PML-N, power plants with a cumulative capacity of over 10,000 MW became operational under the CPEC, but none of the plants generated hydroelectric power.

The feasibility study of the dam was completed by the Japan International Cooperation Agency (JICA) in March 2000, whereas its detailed engineering design was completed in April of 2017. The Executive Committee of National Economic Council (ECNEC) approved the dam's PC-1 amounting to Rs309, 558 billion during a meeting on April 26, 2018, while the government released Rs17 billion for the ongoing financial year 2018-19 to construct the dam. Moreover, 818 acres of land has been allocated to Wapda in relation to the construction of the dam.


https://tribune.com.pk/story/1965931/1-need-know-mohmand-dam


just give mian the credit for all of it. they need the credit for their shine. But we need the projects to start and complete!


you are asking the wrong question! The self proclaimed lohar couldn't make the national steel mill work BUT their bhattian never go extinct! How? Why?
One day these noonies will even give credits of the idea of Pakistan and its creation as well .... to NS

After all as per them Mian Shaib is a dope for them .....
 
.
One day these noonies will even give credits of the idea of Pakistan and its creation as well .... to NS

After all as per them Mian Shaib is a dope for them .....
have to give mian the credit as it is a master of making chawal out of people! Know the power of takhti and ribbon cutting. mian could have started many dam constructions. NOT just attempting to buy land but the actual construction of the dam's then we would say that it was mian who did it! Mian could have started ML1 too and taken credit for that as well. I say let them take the credit for everything we need the dams and essential projects to complete.
 
.
IF they had started the actual building of the dam then around about now it would have been near completion! BUT why didn't they start it and say that it is on the back burner till 2037! Buying land and actually starting the project where the necessary aggregate is done was NEVER started! It was a takhti hanging procedure for vote batroney

Bhasha Dam delayed till 2037

July 9, 2014


LAHORE: The commissioning of multi-purpose Diamer Bhasha Dam on River Indus has been postponed by another about 17 years as this mega project, having strategic importance, is now expected to be completed in the year 2037 instead of 2020, literally converting the water crisis into an existential threat to the country.
According to documents available with The News, the Dasu Hydropower Project is being given preference to the Diamer Bhasha Dam, ignoring imminent threat of water shortage and floods.

https://www.thenews.com.pk/archive/print/639042-bhasha-dam-delayed-till-2037



Are you sure that mian did tendering for Mohmand dam?? The project has many hands in it but the actual construction started now!!!

"The project was handed over to the private sector in 2002 that failed to construct the dam and wasted seven years," he explained. "Consequently, the project was given back to Wapda in 2007." Durrani added that the French Development Agency (AFD) granted $8 million to conduct the dam's feasibility study, and gave another $1 million to carry out research on its environmental impact.

Pakistan's first hydroelectric power development policy was designed in 1995, while the second and third policies were introduced in 2002 and 2013, respectively. During the tenure of the PML-N, power plants with a cumulative capacity of over 10,000 MW became operational under the CPEC, but none of the plants generated hydroelectric power.

The feasibility study of the dam was completed by the Japan International Cooperation Agency (JICA) in March 2000, whereas its detailed engineering design was completed in April of 2017. The Executive Committee of National Economic Council (ECNEC) approved the dam's PC-1 amounting to Rs309, 558 billion during a meeting on April 26, 2018, while the government released Rs17 billion for the ongoing financial year 2018-19 to construct the dam. Moreover, 818 acres of land has been allocated to Wapda in relation to the construction of the dam.


https://tribune.com.pk/story/1965931/1-need-know-mohmand-dam


just give mian the credit for all of it. they need the credit for their shine. But we need the projects to start and complete!


you are asking the wrong question! The self proclaimed lohar couldn't make the national steel mill work BUT their bhattian never go extinct! How? Why?
Land of Diamer-Bhasha Dam
https://www.dawn.com/news/1398945

Tender of Mohmand Dam was completed before Imran Khan’s government

https://www.google.com/amp/s/nation.com.pk/01-Aug-2018/wapda-completes-mohmand-dam-tender-papers?version=amp


It's Imran Khan that's putting nameplate on the projects of others while his own BRT is still uncompleted
 
.
Land of Diamer-Bhasha Dam
https://www.dawn.com/news/1398945

Tender of Mohmand Dam was completed before Imran Khan’s government

https://www.google.com/amp/s/nation.com.pk/01-Aug-2018/wapda-completes-mohmand-dam-tender-papers?version=amp


It's Imran Khan that's putting nameplate on the projects of others while his own BRT is still uncompleted
who started the work on the project? does land purchase mean that work had started? well let me tell you NO. I just posted the news article that shows how serious mian was in starting the project and put it on the back burner to 2037! Secondly how many funds did mian release for the purchase of the land? let me rephrase IF mian had started it in 2014 and not spent time on expensive IPP's and other nonsensical power projects then it would have been mian getting the praise!!!

Does tender and then assigning the budget and STARTING THE PROJECT come in the same domain? It dosent!! Mian could have started Diamer Basha dam in its tenure for the wah wah mian ji.

Both dams Diamir and Mohmand started before mian, why not give them credit? But I forget all credit belongs to mian.

BRT when completed will not be a burden on the province of KP! it will not need billions in subsidies like khatti train, lahore, multan metro! you pay for the journey on these metro bus journeys and then you pay in taxes so it runs subsidised by the taxpayer. as for thakti maybe you can tell us about that barrage in south Punjab mian did multiple iftitah on but never started work on?

Bhasha Dam delayed till 2037

July 9, 2014


LAHORE: The commissioning of multi-purpose Diamer Bhasha Dam on River Indus has been postponed by another about 17 years as this mega project, having strategic importance, is now expected to be completed in the year 2037 instead of 2020, literally converting the water crisis into an existential threat to the country.
According to documents available with The News, the Dasu Hydropower Project is being given preference to the Diamer Bhasha Dam, ignoring imminent threat of water shortage and floods.

https://tribune.com.pk/story/1965931/1-need-know-mohmand-dam


"The project was handed over to the private sector in 2002 that failed to construct the dam and wasted seven years," he explained. "Consequently, the project was given back to Wapda in 2007." Durrani added that the French Development Agency (AFD) granted $8 million to conduct the dam's feasibility study, and gave another $1 million to carry out research on its environmental impact.

Pakistan's first hydroelectric power development policy was designed in 1995, while the second and third policies were introduced in 2002 and 2013, respectively. During the tenure of the PML-N, power plants with a cumulative capacity of over 10,000 MW became operational under the CPEC, but none of the plants generated hydroelectric power.

The feasibility study of the dam was completed by the Japan International Cooperation Agency (JICA) in March 2000, whereas its detailed engineering design was completed in April of 2017. The Executive Committee of National Economic Council (ECNEC) approved the dam's PC-1 amounting to Rs309, 558 billion during a meeting on April 26, 2018, while the government released Rs17 billion for the ongoing financial year 2018-19 to construct the dam. Moreover, 818 acres of land has been allocated to Wapda in relation to the construction of the dam.


https://tribune.com.pk/story/1965931/1-need-know-mohmand-dam
 
.
Now you should have known that land purchase does not matter. Work starts from where the Handsome Inspects the site. Do you understand??

who started the work on the project? does land purchase mean that work had started? well let me tell you NO.

After reading his views about BRT you must know which community he belongs to. "KORAPT to nhi hai na".
Please avoid arguing such Youthias.

BRT when completed will not be a burden on the province of KP! it will not need billions in subsidies like khatti train, lahore, multan metro! you pay for the journey on these metro bus journeys and then you pay in taxes so it runs subsidised by the taxpayer. as for thakti maybe you can tell us about that barrage in south Punjab mian did multiple iftitah on but never started work on?
 
.
Quaid e Azam Solar power plant is in profit and generated 2.44 Billion profit so not a white elephant for sure

https://www.urdupoint.com/en/amp/pakistan/quaid-e-azam-solar-plant-generates-rs-244-bl-969019.html

They didn't stopped thar coal project instead 660 MW Thar coal
Power was made in PMLN tenure which achieved commercial operation in 2019 while approved 1320 MW Coal power plant in thar

http://www.cpecinfo.com/archive/new...-cpec-achieves-commercial-operations/NzMyNw==

Initiated Danish Schools Mianwali Jand Muzzafargarh Hasilpur DG Khan and Jarranwala 1 picture of each school I can share more pictures


View attachment 654033 View attachment 654034 View attachment 654035 View attachment 654036
View attachment 654037
View attachment 654038


About Health Sector they upgraded District Headquarters hospitals of all districts as well as THQ's
Initiated Tayyip Erdoğan Hospital Extension on Which IK proudly put his name plate initiate 500 Bed hospital in Wah PKLI in Lahore extension of Faisalabad hospital Faisalabad children hospital Mayo Hospital Surgical Tower services hospital extension etc etc etc

View attachment 654043
View attachment 654044 View attachment 654045 View attachment 654046 View attachment 654047 View attachment 654048 View attachment 654049
With respect to your very first project quaid.e.azam solar power plant here is the reality

Screenshot_20200725-111920_Chrome.jpg


Four times more expensive rates. This is story of just one project.

We are paying the electticity bills and they collected those profits in the form of bribery long ago.

So good luck worshipping the crooks.
 
.