jupiter2007
SENIOR MEMBER
- Joined
- Feb 19, 2007
- Messages
- 5,252
- Reaction score
- -3
- Country
- Location
I could be wrong...I am assuming that block 3 frame will be slightly larger than block 2 and with more composite material to make it lighter, better avionics, Engine and AESA radar. I think PAF would like to incorporate some tech from J-10C and J-31 into JF-17 block 3.
First prototype will be build in 2019, since block 3 will be a major upgrade to block 2, it will go through all the basic tests including structure, flight qualities, performance and engine flight testing. If the second and third prototype are build than they will go through further testing including comprehensive avionics flight testing, also detail operational evaluation of the aircraft before it goes into production. Someone can correct me if I am wrong.
First prototype will be build in 2019, since block 3 will be a major upgrade to block 2, it will go through all the basic tests including structure, flight qualities, performance and engine flight testing. If the second and third prototype are build than they will go through further testing including comprehensive avionics flight testing, also detail operational evaluation of the aircraft before it goes into production. Someone can correct me if I am wrong.