NTDC connects 660MW Thar Plant with grid

LAHORE (Staff Reporter): National Transmission and Despatch Company Ltd (NTDC) has completed the construction work of 282 km long 500 kV Double Circuit Quad Bundle transmission line from Engro power plant to Jamshoro in Sindh province. The transmission line was tested and energized successfully on 31 July 2018. While dilating upon the details the NTDC Spokesman said that the transmission line will evacuate 660 MW power from Engro Thar Coal Power Plant situated at Tharparkar. He said that it is a truly a historic event as Thar i.e an energy future of Pakistan has been connected with national grid. Power generated from the plants in Thar will be provided to far flung areas of Sindh through national grid. Managing Director, Dy Managing Director (Asset Development & Management) NTDC has appreciated the NTDC engineers, staff, consultants and contractors for their untiring efforts to complete this vital project.


https://nation.com.pk/02-Aug-2018/609273
 
.
Congratulations Pakistan more domestic non oil based power means less import of fossil fuel.
China is a good friend of Pakistan.

Another 660 MW of electric production increased in Pakistan.
 
.
Can we create a dedicated thread for current and upcoming power plants and total power generation of pakistan. @BHarwana
 
. . . .
Last edited:
. . . . .
Okay now I get your point.
Like we usually hear this pwoer plant is working now , but later we came to know that one is still having issues. In that thread we will paste statistics current power plants , their current generation power and what we are really producing out of them.
 
.
Like we usually hear this pwoer plant is working now , but later we came to know that one is still having issues. In that thread we will paste statistics current power plants , their current generation power and what we are really producing out of them.
Yes you are correct the power generation and actual listed power plus others in pipeline which will come online and so on. Will this only include ones under cpec or IPP and rest.
 
.
what is total installed capacity today and how much is under counstruction please help
 
.
Yes you are correct the power generation and actual listed power plus others in pipeline which will come online and so on. Will this only include ones under cpec or IPP and rest.
In total. Inc cpec.
 
.