What's new

LCA Advances with Orders for 83 Jets from the IAF with American Engines

Zain Malik

FULL MEMBER
Joined
Oct 13, 2015
Messages
1,511
Reaction score
3
Country
Pakistan
Location
Pakistan
1_img111216092639.jpg




India’s Ministry of Defense has cleared an order for 83 Light Combat Aircraft (LCA), designated Mk1A, from government-owned defense manufacturer Hindustan Aeronautics Ltd (HAL) for the Indian Air Force (IAF). HAL currently has in hand an order for 40 GE F404-engined LCAs for the IAF. Of the 20 to be produced with an initial operational clearance, three have been delivered and the fourth is scheduled to be handed over by early next year. Twenty more will be supplied once they receive the final operational clearance (FOC) by end of 2017.

HAL says it will increase production from eight to 16 a year “once a formal order is received for the 83 Mk1As.” IAF Air Chief Marshall Arup Raha said last year: “We want the LCA Mk1A with an improved radar [Elta's ELM-2052 AESA or active electronically scanned array], electronic warfare, in-flight refueling and better missiles.” But a privately owned OEM said: “While there is to be joint work between HAL and Elta, we don’t know how much of the Elta AESA will be indigenous.” Other OEMs are interested. For instance, Saab confirmed recently to AIN that it is offering its Gallium Nitride technology, developed in Gothenberg, Sweden, for the LCA, rather than part of its Gripen proposal to India.

The LCA Mk2 version, expected to be re-engined from the GE F404 to the F414, is planned for production by 2025. The Indian Navy has expressed its firm requirement for 46 LCA Mk2s that will require a weight reduction of one ton over the Mk1A. Delays to the naval LCA have been attributed in the past to technical complexities; non-availability of infrastructure and critical components and technology denial regimes; extended user trials; and the failure of some of the components during testing.

Meanwhile, an indigenous AESA Fire Control Radar is being developed for the Mk2 by Electronics and Radar Development Establishment (LRDE), for which Bangalore-based Centum Electronics has designed and developed the Vibration Hardened OCXO (oven controlled crystal oscillators). “The function of OCXO is to generate the clock frequency of 120 MHz, which is in turn fed to a synthesizer that generates the required X-Band frequency for AESA,” said Vinod S. Chippalkatti, vice-president, Centum Electronics, to AIN. “The company was initially challenged three years ago to develop this product, since international companies were not able to meet the specifications and part with the technology. Centum is able to develop and deliver the product, which is lightweight, low-g-sensitive and its phase noise performance is excellent under vibration,” added Chippalkatti.

Meanwhile, under the offset contract not yet signed for India’s buy of 36 Rafales, Dassault Aviation is believed to have agreed to transfer special spray paint and coating technology of benefit to programs such as the LCA.
 
The Elta AESA will be redeveloped with DRDO in a JV with the Uttam.

The Mk1A will also have the Kaveri engine. An LCA prototype will fly with the Kaveri in 2018.
 
I am only interested in news related to Safran-GTRE deal, if that is success then "Mataji ke mandir me Prasad chadhaunga". :-)
 
From 120 the numbers came down to 83??
It's actually 20 IOC standard without refueling prob 20 Foc standard with refueling prob and full missiles tested and 84 MK1A standard with AESA Radr EW suit and more missiles incorporated (Which is like Ur JF17 Block 3+
 
It's actually 20 IOC standard without refueling prob 20 Foc standard with refueling prob and full missiles tested and 84 MK1A standard with AESA Radr EW suit and more missiles incorporated (Which is like Ur JF17 Block 3+

Actually IOC standard itself is equivalent to their future Block 3. FOC will come with refuelling probes and a modular construction resulting in easy maintainance.
We already have WVR, BVR, pods, drop bombs, cannons tested on Tejas with HMDS and an EW suite.
 
Actually IOC standard itself is equivalent to their future Block 3. FOC will come with refuelling probes and a modular construction resulting in easy maintainance.
We already have WVR, BVR, pods, drop bombs, cannons tested on Tejas with HMDS and an EW suite.

IOC comes with no refueling prob. EW suit too will be on MK1A as external pod BVR may be
 
The LCA Mk2 version, expected to be re-engined from the GE F404 to the F414, is planned for production by 2025. The Indian Navy has expressed its firm requirement for 46 LCA Mk2s that will require a weight reduction of one ton over the Mk1A.

I'm pretty sure this is erroneous. There is no way to shave off one ton from the already lightweight Mk1A, unless they chop off a wing. In fact, Mk2 is expected to have a slight increase in weight due to the enlarged fuselage, which is why the higher thrust F-414 is needed to power it.
 

Pakistan Affairs Latest Posts

Back
Top Bottom