What's new

JF-17 Thunder Serial Number Pictorial Collection

https://falcons.pk/photo/JF-17-Thunder/2435

Photo-2435.jpg
 
. . . .
. .
So how many we have in our inventory till today...i think 8 jfb was handed over in December...definitely assembly lines were busy when PAC handed new planes...can anyone explains...at a time how many can be assembled.n how much time is required for one plane...assembly lines works parallel ...plz some explain
 
.
So how many we have in our inventory till today...i think 8 jfb was handed over in December...definitely assembly lines were busy when PAC handed new planes...can anyone explains...at a time how many can be assembled.n how much time is required for one plane...assembly lines works parallel ...plz some explain

i think the number was 12 last year, 14 more B in pipeline for 2020.
 
.
i think the number was 12 last year, 14 more B in pipeline for 2020.

highest serial was 19-612 which was 2P-72

in 2019 - 8 x JF17B in 2019 and 12 x JF17A Block II last one being 2P-62 Block II

17-601 and 19-602 are the two original grey JF17B prototypes

in 2020
14 x Jf17B + 2 x JF17 BlockA III

so 2P-73B to 2P-86B in 2020 we should see now anytime
and 2P-87B to 2P-90B - in 2021

plus now 3P-63 and 3P-64
 
Last edited:
.
highest serial was 19-612 which was 2P-72

in 2019 - 8 x JF17B in 2019 and 12 x JF17A Block II last one being 2P-62 Block II

17-601 and 19-602 are the two original grey JF17B prototypes

in 2020
14 x Jf17B + 2 x JF17 BlockA III

so 2P-73B to 2P-86B in 2020 we should see now anytime
and 2P-87B to 2P-90B - in 2021

plus now 3P-63 and 3P-64
Can u simply tell how much units we have so far...n secondly how many assembly lines work parallel n third was if one batch completes its testing by so far how much work completes to new ones...

Thnks in advance
 
.
Can u simply tell how much units we have so far...n secondly how many assembly lines work parallel n third was if one batch completes its testing by so far how much work completes to new ones...

Thnks in advance
I dont think the information about the number of jigs is available in public domain. 20 units were built in 2019. 12As plus 8 Bs
In 2020 16units including 2 block 3 units will be done. So 14 Bs
2021 14 units 2 Bs plus12.
A
 
Last edited:
.
So how many we have in our inventory till today...i think 8 jfb was handed over in December...definitely assembly lines were busy when PAC handed new planes...can anyone explains...at a time how many can be assembled.n how much time is required for one plane...assembly lines works parallel ...plz some explain
Why u t so curious of capacity and induction ? Who r u ?
 
.
Why u t so curious of capacity and induction ? Who r u ?
i want them in numbers...when ever a new squadron comes...it makes me very happy...but due to short memory loss n heavy work load n other stuff i cannt remember the no we hve produced...
Who am i...a muslim..n then a Pakistani

I dont think the information about the number of jigs is available in public domain. 20 units were built in 2019. 12As plus 8 Bs
In 2020 16units including 2 block 3 units will be done. So 14 Bs
2021 14 units 2 Bs plus12.
A
If 20 units were built in 2019. I think they will produce the same numbers atleast...my sixth sense tells they placed other chinese version of Aesa radar... in B model.
 
. . .

Country Latest Posts

Back
Top Bottom