(flight on 15th april 2010) - indian cryogenic engine failed due to problems in turbo booster pumps. this failure occured at 3rd stage and the first 2 stages were successful.
(flight on 25th dec 2010)- it was in this launch that the german made connectors snapped leading to failure in the first stage itself and the rocket had to be destroyed in mid air. this flight was carrying russian cryogenic engine which never got a chance to ignite as the problem occured in first stage itself.
(flight on 25th dec 2010)- it was in this launch that the german made connectors snapped leading to failure in the first stage itself and the rocket had to be destroyed in mid air. this flight was carrying russian cryogenic engine which never got a chance to ignite as the problem occured in first stage itself.