What's new

Infrastructure Development in Pakistan

Army Public School and College Swat.

20108646_1228873653906997_7447869378922204368_n.jpg





20106343_1228873667240329_3345925854774283466_n.jpg




19989566_1228873740573655_8633561856513904262_n.jpg




19989643_1228873753906987_329844415818599496_n.jpg
 
. . . . .
Karachi, Creek Vista and Arcadians in the background.
20229138_479246432435338_4927472663323608987_n.jpg

Karachi
20108417_10155146312979300_2196464179692098125_n.jpg


35766275002_8eff3b7993_b.jpg


7Gn26Rg.jpg


FznZjhM.jpg


19956213_1424959774246807_2008661643127982170_o.png

Karachi port grand food street
19961647_1423705624372222_7145709111804847994_n.jpg


19955899_1423705707705547_8621845926384625198_o.jpg


20017687_1423705747705543_1922121892419300411_o.jpg


19956312_1423705897705528_2476238905279428108_o.jpg


Steel Town park Karachi
19884148_1370231219711772_1790189107556539044_n.jpg


1xYC65W.jpg

Lalazar Karachi
Kptixmy.jpg

Businesss district Mcleod Rd.
aJpLvFl.jpg


Sunday morning Cycling C. mass. Karachi
f2a851031591432d909ffd1b54689562.jpg

Moin Khan cricket academy Karachi
7KFm5Le.jpg

Jinnah Terminal rd.
FvVWsAg.jpg

Karachi Sindh Club
oOMx8Tq.jpg
 
. . . . .
PCRET installs 155 units of small wind turbines in Sindh, Balochistan

ISLAMABAD (APP): Pakistan Council of Renewable Energy Technologies (PCRET) has installed 155 units of small wind turbines in Sindh and Balochistan. These units electrifying 1,560 houses and nine costal guard check posts, an official of PCRET told APP. Giving details of four years performance of PCRET, he informed that the council has installed 14 KV systems in Khuzdar, 25KW PV system at Lahore Expo Centre, while Capital Development Authority tube-well electrified through 35 KV, Photo voltaic (PV) Panels. A MHP Plant (20 KW), Canal Fall SHP Plant (200 KW) installed at Mardan, Kaplan Type SHP Plant (200KW) at Kanpur Canal, while Pakistan-China Joint Hybrid (Solar, Wind and MHP) Research Centre was also established. Besides that a Hybrid (Solar, Wind and MHP) Research Centre, Solar Dryer of Capacity 200-300 kg (top), 10kg (bottom right), 5kg (bottom left) has also been installed.

It also installed Unglazed Transpired Collector Type Solar Dryer having capacity of 500 kg at Dera Ismail Khan, a Solar dryer having capacity of 500 kg installed at 10 sites of Punjab and KP for drying of dates and designed/Developed Box Type Solar Cooker with Auto-Tracker. PCRET also installed 4,016 Biogas Plants (size 3 & 5 m3/day: producing 18000 m3/day) and 200 cottage industries.

He said that PCRET being a unique facility is carrying out Research and Development (R&D) in the field of renewable energy technologies for last three decades in the country. It is pioneer in silicon technology and has developed first single crystal solar panel in 1986, dissemination and awareness of renewable energy culture in the country, imparted training to various NGOs and private sector for use of Renew Energy technologies.
 
. . .
CPEC Western Route: Improvement of 87 km section DIKhan Zhob (310) – Mughal Kot (397) Section of National Highway N-50 (ICB-3C) at Lot-2 Killi Khudae Nazar – Mughal Kot.



21078757_1263545440439818_544619216129018013_n.jpg




21077636_1263545493773146_7702980047274516760_n.jpg




20993907_1263545557106473_8118005552560588513_n.jpg




20994023_1263545587106470_7884318253138861943_n.jpg

__
 
. .

Country Latest Posts

Back
Top Bottom