What's new

Infrastructure Development in Pakistan

1926744_611721305580429_1991166880_n.jpg


According to this research, almost 80% of Pakistan is sitting on top of Shale Gas and Shale Oil, which refers to oil and gas that is trapped within shale formations. Shale is fine-grained sedimentary rock that can be rich sources of petroleum and natural gas.
 
. .
Islamabad

Margalla Avenue

Islamabad-CDANewMP-01_zps94050b99.jpg


Islamabad%20-%20Khayaban-e-Margalla%20-%20Construction%20Pix%20-%20FEB%202014%20-%2007.jpg

Islamabad%20-%20Khayaban-e-Margalla%20-%20Construction%20Pix%20-%20FEB%202014%20-%2008.jpg

Islamabad%20-%20Khayaban-e-Margalla%20-%20Construction%20Pix%20-%20FEB%202014%20-%2002.jpg


Picture Credits: Rana Atif Urbanpk

New Airport

1511536_395291560614548_1772679792_n.jpg

1622739_395291863947851_938761505_n.jpg

1010098_395291933947844_1669891137_n.jpg

1506909_395291883947849_814991127_n.jpg

1459696_395291907281180_1711828991_n.jpg

1782036_395291810614523_1800077006_n.jpg


Picture Credits: saqib ansari and malpensa ssc
 
.
Concept of warning sign should not be formality but the practicality.
After reaching this point, this piece of info. is use less and waste of tax money.

1926886_287028574785174_1084740305_n.jpg
 
.
Lahore

Orange Line Mass Transit System.

- 30 stops
- Start from Ali town on Raiwind road and end at Daroghawala on GT road.
- All track will be Overhead.
- 40 thousand will travel each hour
- Chinese will invest $1.5 Billion.
- Tender released.
- Project to start Mid of this Year
- CM goes to China to finalize project.

1795586_288659221288776_825555992_n.jpg


Peshawar

Mass Transit

- BRT Cost Rs 2 Billion. Construction to start this year and end by 2015-2016
- Monorail Cost and Contruction Time Frame Unknown

BRT_zpsa02eb327.png

12572179275_4bf7dce53d_b.jpg


Lahore

Qainchi Interchange

12598475753_800ba35ceb_b.jpg


Ghazi chowk and Khaira U-turn flyovers

12598375235_6f28e79776_b.jpg


Picture Credits: omi92 ssc
 
.
Lahore

Orange Line Mass Transit System.

- 30 stops
- Start from Ali town on Raiwind road and end at Daroghawala on GT road.
- All track will be Overhead.
- 40 thousand will travel each hour
- Chinese will invest $1.5 Billion.
- Tender released.
- Project to start Mid of this Year
- CM goes to China to finalize project.

1795586_288659221288776_825555992_n.jpg


Peshawar

Mass Transit

- BRT Cost Rs 2 Billion. Construction to start this year and end by 2015-2016
- Monorail Cost and Contruction Time Frame Unknown

BRT_zpsa02eb327.png

12572179275_4bf7dce53d_b.jpg


Lahore

Qainchi Interchange

12598475753_800ba35ceb_b.jpg


Ghazi chowk and Khaira U-turn flyovers

12598375235_6f28e79776_b.jpg


Picture Credits: omi92 ssc
Do we have enough info to start a thread about Peshawar/Lahore mono rail in the economy and development section?
 
.
Do we have enough info to start a thread about Peshawar/Lahore mono rail in the economy and development section?

I started a sticky thread on Lahore few months back but people started bashing. :disagree:

Anyways, let us hang on till we see construction. We need to know whether Peshawar is going to for Monorail first or BRT. Same is the case for Lahore. We don't know if its Monorail or Regular Metro Train.
 
. . .
Rawalpindi

Metro Bus Construction
1102101308-1_zps7188a8ae.jpg

Pictue Credi: tabeb noor ssc

New Wagon Service For Women

673034-Ladiesfirst-1392660794-450-640x480.JPG
 
. .
Rawalpindi-Islamabad

Metro Bus Route Finalized

map_zps34848eae.jpg


Picture Credit: Express Tribune

Muzaffarabad

Naluchi Bridge

1779871_509590979161362_1774120098_n_zps3e8c50b8.jpg


Picture Credit: tabeb noor ssc

Peshawar

Render of Hyatabad

1781901_614583111960915_936692389_n_zps8b554fdb.png


1012545_614583071960919_281799389_n_zps712145c5.png

1896866_614583131960913_734391196_n_zpsa793e8af.png


Picture Credits: ahxan ssc

Karachi

Zulfiqarabad Oil Tanker's Parking Terminal.

Zulfiqarabad-Oil-Terminal.jpg


Picture Credit: hero g ssc

Lahore

Ring Road

1507005_288610897960275_339843955_n.jpg

1782078_289450044543027_484257192_n.jpg

1966684_289870641167634_1572914871_n.jpg


Kalma Chowk Interchange

1948142_290567761097922_59559992_n.jpg
 
. .
Rawalpindi-Islamabad

Metro Bus Route Finalized

map_zps34848eae.jpg


Picture Credit: Express Tribune


why not start off with a metro (train) system, im pretty sure that it would be the most convenient and viable option as they will have to spend only once and then reap from it

unlike the metro bus where another transformation would be required in order to lay down the tracks

instead come up with a public transport BUS service and use the buses there......and get rid of those poorly maintained and ugly to look at carry dabbas (aka bombs on wheels)
 
.
Qainchi and Ghazi road are two different crossings.
This will be either on Gazi road or Ring road crossing at Ferozpur road.

Nope, it's the Qainchi crossing. The work's been under way since almost a month now. Nothing at all at the Gazi road crossing.
 
.

Latest posts

Back
Top Bottom