Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Is this recoverable reconnaissance satellite? Just as Fanhui Shi Weixing - Wikipedia, the free encyclopedia
New Recruit
RLV updates:
Major highlights of RLV-TD during the year include:
mission analysis based on static test propulsion performance, updating of autopilot design
in RLV-TD ascent phase and Technology Demonstrator Vehicle (TDV) descent phase, 6D simulations through COMETS & SITARA to validate Navigation and Guidance Control (NGC) design, liftoff studies and wind turbulence studies. Guidance and Autopilot designs were modified based on simulation results.
Technology Demonstrator Vehicle (TDV) structural model was realised. Fuselage and inter stage assemblies are realised for structural testing. Flush Air Data System (FADS) test article realised and integration procedure, FADS algorithm, avionics and leak tightness for pressure pick up assembly were validated through 1:1 FADS wind tunnel test at IIT, Kanpur.
Qualification model of Radar Altimeter was realised and balloon test conducted at TIFR, Hyderabad. Carbon-carbon (C/C) laminates for nose cap were realised through a new route. Functional qualification test of Launch Hold and Release System (LHRS) with dual pyro initiation carried out with simulated interfaces.
The testing of HS9 booster stage separation system along with hydraulic line separation system was completed successfully. High altitude test of the 2 kN retro rocket developed for jettisoning spent HS9 motor was successfully conducted at SDSC SHAR.
The Integrated Technical Review (ITR) of RLV-TD by the National Review Committee in October 2012 has concluded that launch of RLV-TD HEX-01 mission in September 2013 is feasible
Actually this info was posted by antriksh in Nasaspaceflightforum.Can I know the source bro???