What's new

Indian Space Capabilities

Solid stage burnt out.

second stage is fired
 
First stage seperated........second stage ingnited
 
Altitude is 127 km now

second stage separated

Cryo engine is performing as per planned

Everything is going as planned

Time 600 plus seconds

Range is 2403 KM

Rel Vel as of now> 6.677 KM/S

Cryo engine is generating thrust of 7.5 tons

Altitude is 149 KM as of now.
 
Last edited:
Time is 1000 seconds now

Shut off command is issued..........cryo upper stage is shut off.............satellite separated :cheers:
 
Indigenous cryogenic engine and upper stage performed as planned- Radhakrishnan confirms.
 
MISSION SUCCESS.

Cryogenic stage did it's job good and proper. Satellite has been separated, both solar panels deployed.
 
ISRO did it!!! Congrats everyone!!!

aaj tho bass band baaja baarath :D
 
LAUCNCH Success !!!!
 
INDIA DONE IT...
India_240-animated-flag-gifs.gif


Solid stage burnt out.

second stage is fired

OH MY GSLV...:smitten::smitten::smitten:
 
Back
Top Bottom