Skull and Bones
ELITE MEMBER
- Joined
- Jan 29, 2011
- Messages
- 18,601
- Reaction score
- -4
- Country
- Location
We have 5000+ hp engines. We can easily build 7000 to 8000 HP engine now. Actual problem is track. We should improve track put robust traffic management system, reduce the stoppages of fast trains. We can certainly make our trains 20 KM faster on an average which is a big achievement.
I concur, the biggest shift should be made in the quality of travel. HSR will be flop because it cannot compete with airlines, and flights in India are pretty cheap.
Railways should be made efficient for the travel of Indian middle class.