What's new

India to build its own stealth fighter jet.

.
First squadron to be based in Sulur air base, Coimbatore, Tamil Nadu. Google is your friend.

to be is future tense it means they will try to and its not in operation so accept it that you have taken more then 30 years and still counting
 
. . .
to be is future tense it means they will try to and its not in operation so accept it that you have taken more then 30 years and still counting

Accepted. Also accepted that it is already inducted and squadrons will be fully operational this year ! We are very slow you see .
 
. .
inducting and equipping are two different words with two seperate meanings.inducting dont mean they equipped airforce.and i asked the name or number of squadron or the base which they are operating from.you first finish LCA then you can about 5th generation and i know its gonna take you 50 years to devolp one.as lca is like bicycle and 5th gen is like a ferrari if bicylce takes 30 years then i am really optimistic that it will be completed by 2061 or even later

How so buddy??As per my knowledge,the funding for LCA was approved only in 1992.So how on earth LCA took 30 years????Stop trolling and start some reading mate.
REGARDS........
 
.
lol pakistan nahin JF17 thunder.its deployed on your border already more then 130 of them and 30 near kashmir.5th generation bhai

JFt in our broder..for what? what do you think, will it fire SD-10 now?...what is the point of having 130 JFT if it does not fit for the role it suppose to (as of now)

Better build all capabilities then go for large scale production...not for the sake of numbers..
 
.
lol pakistan nahin JF17 thunder.its deployed on your border already more then 130 of them and 30 near kashmir.5th generation bhai

130? In 2009, it was reported that 8 had joined. It is not even 2 years and PAF got 130? Any link to prove your claim?

Well it takes time to make jet from scratch unlike jumping bandwagons halfway. BTW Tejas sanctioned only in 1992-93 and came into practical testing only in 2001 because of the stupid sanctions era. We made a mistake trusting your master of that times totally. So now playing cards carefully.
 
. .
LCA took 30 years, still its without engine [ only few engines were delivered from US for testing & prototypes] and there is a long way to develop LCa may be 30 more years.....

For Indian Stealth, first they will learn to develop engine after 30 years that will take them to 2040, then another 30 years to understand STEALTH technology, that will take them to 2080, then 20 more years would be required to develop Stealth AC which will take them to 3000 [Next Millinium]....

Good to see dreams for 3000

Your statement is pathetic and your math is worst. Seems something is burning... :woot:

And, 2011 + 30 + 30 + 20 + other buffer time which you have kept, will be approximately 2100, not 3000. It is a defence forum for adults, not for 5'th grade kids. Go and sleep.
 
.
LCA took 30 years, still its without engine [ only few engines were delivered from US for testing & prototypes] and there is a long way to develop LCa may be 30 more years.....

For Indian Stealth, first they will learn to develop engine after 30 years that will take them to 2040, then another 30 years to understand STEALTH technology, that will take them to 2080, then 20 more years would be required to develop Stealth AC which will take them to 3000 [Next Millinium]....

Good to see dreams for 3000

Best post of the the thread. :rofl::rofl::rofl:
 
. . .
If India plans a project for stealth then it would be an non-ending project and will never be implemented.
 
.

Latest posts

Back
Top Bottom