What's new

GSLV Mk III-D1/GSAT-19 Mission Live

Cryogenic performance normal..Hell yaea
 
most testing 10 minutes !!
 
GSLV Mk III-D1/GSAT-19 Mission
GSLV Mk III-D1

GSLV-Mk III is capable launching 4 ton class of satellites to Geosynchronous Transfer orbit (GTO). It is a three-stage vehicle with two solid motor strap-ons (S200), a liquid propellant core stage (L110) and a cryogenic stage (C25).

GSLV-Mk III-D1 is the first developmental flight, carrying 3136 kg GSAT-19 satellite to a Geosynchronous Transfer Orbit (GTO). The vehicle is configured with a 5 m ogive payload fairing and slanted strap-on nose cone to provide aerodynamic robustness.

GSLV Mk III-D1/GSAT-19 Mission is scheduled to be launched on June 05, 2017 at 17:28 Hrs (IST) from the Second Launch Pad at SDSC SHAR, Sriharikota
 
Range : 975 Km
Velocity : 4.4 km/s
+7 Minutes
 
upload_2017-6-5_8-6-47.png
 
200 sec more !! for Crio !

cryo stage .. naarmal !
 
deep curve ahead !! normal so for !
 
The curve is coming..
 
cryo stage shutoff command issued !
 
Back
Top Bottom