A country that has ambitions to be prosperous in the future still using coal, diesel and petrol powered plants... worse is that they're making new ones. Invest in nuclear power, solar and wind, turbine tech, using waste to produce methane to power generators for electricity. But ofc, uneducated cumsluts will deceive people and people will be eager to be deceived.

And they plan on being prosperous nation when all prosperous nation realised for sustainable prosperity you've to move on....
This bd is the same country that will go along with other hypocrites to the richer nations asking for compensation because of "global warming and harm done to the environment "

Now I ain't no peta or green planet activist... I love petrol driven cars over battery and I worship Bugatti w16 engine. But that doesn't mean I hate efficiency, i.e. Doing more with less.... which makes me a Porsche fan.

Who am I kidding, my rant will do no good. Better **** all night away.
 
.
A country that has ambitions to be prosperous in the future still using coal, diesel and petrol powered plants... worse is that they're making new ones. Invest in nuclear power, solar and wind, turbine tech, using waste to produce methane to power generators for electricity. But ofc, uneducated cumsluts will deceive people and people will be eager to be deceived.

Sorry for base load, nothing beats coal and fossil fuels still. Given BD land constraints, its better off leaving solar and wind to smaller scale micro projects to help dampen out the grid peak/troughs along with import from indian/bhutan/nepal grid. Overall strategy followed by BD govt is not bad (its not great either), they would be advised by a number of energy consultants on it as far as that goes, so I wouldn't be too worried. The real problem lies in the "overhead" BD govt extracts for its inefficiencies (corruption etc) more than anything else. Only when you address that do you have a chance in even thinking of approaching such sector in more non-conventional way.

Nuclear, you simply have little liquidity to push there right now effectively (given gestation period, capital density and initial operation costs, ROI profile and again land costs etc)....in fact if it were up to me the current nuclear project money should have been invested elsewhere, in some form of industrial production in say non-RMG MSME credit loans/tax breaks.

As for turbines and methane use, yes there should be much more done there given BD agricultural production and also Chinese overcapacity in this capital technology. I have been saying for some time now that Chinese liquidity should be used for energy cap projects in BD (where the high interest rates can be met guaranteed given its a base pyramid activity) and industry production should be open market investment (FDI where possible, good loan competition otherwise, but not captive G-G style)....but instead seems to be the reverse (in interest of keeping govt structures static rather than reform-based...and this pressures private players to be unnecessarily dynamic instead of threshold static so they can grow to next level ).

Now I ain't no peta or green planet activist... I love petrol driven cars over battery and I worship Bugatti w16 engine. But that doesn't mean I hate efficiency, i.e. Doing more with less.... which makes me a Porsche fan.

It should make you a public transport fan more than anything else hehe.
 
.
India building too many coal-fired power plants, researchers claim
04/26/2017
By Tildy Bayar
Features Editor


India’s pipeline of planned coal-fired power plants is set to exceed its power demand and derail its climate ambitions, US researchers have claimed.

In a paper published this week in the American Geophysical Union journal Earth’s Future, researchers from the University of California found that 243 GW of coal-fired generation capacity were under development in India in mid-2016, with an additional 178 GW proposed.

If built, these plants would increase India’s coal-fired power capacity by 123 per cent, the researchers said, and would exceed the nation’s projected future power demand by 2024 if the government also went ahead with its plan to produce at least 40 per cent of its power from non-fossil fuel sources by 2030.
---------------------------------------------------------------------------------------------------

Some delusional Hujuge Bangal type of guys are lamenting about our planned oil-fired power plants when India is still contemplating to build 243,000 mW coal-fired power plants. Power from coal is still very cheap. It is bad for environment, but good for economic emancipation, specially for those countries that are still developing or underdeveloped.

- @bluesky -
 
Last edited:
.
Wut? 25 cent per unit? Unless BD only have this option on table to meet demand, this look like corrupt deal.
Nope diesel is this much expensive . it's same price in Pakistan.

Only reason why we end up paying 12 rs(18rs at high time ) is that 1/3 of our power comes from hydro @2 rs /unit and 1/4 from local gas @3-4 rs/unit
 
.
In Pakistan it varies as it depends on number of units. Less units less cost. Initial 100 units are subsidised. start from Pkr 2 uptil 16 if Consumed Units are more than 700. Avg household unit peaks around 300 with per unit cost aprox Pkr 10. 100+ fixed charges.

with Taka 19 is like fully throttle on corruption. With this price they can go for wind mill, coal or solar. and i am sur ethey will still cheaper than this 19 Taka. Presently In Pakistan Our Govt is forcing power plants which are still running on refined or crude oil to cheaper sources like LNG, gas or Coal. LNG cost is around 6-7 per mmbtu. Looks promising for 15 years with Qatar deal.



Above all they are doing same blunder what PPP did in Pak in 90s

@Nilgiri You can use this for calculating estimated bill.

http://www.fesco.com.pk/billestimation-choice.asp
No govt is not forcing this. Nandipur was run on diesel till now. We still have diesel plants
Diesel plants are easier and quicker to setup. Vs coal and gas which takes 4 years and would require additional infrastructure like jetty, pipelines or LNG terminal

So a good short term measure
 
.
And unofficially load sheddibg means diesel /petrol generators in every house which is worse than central system
 
.
A country that has ambitions to be prosperous in the future still using coal, diesel and petrol powered plants... worse is that they're making new ones. Invest in nuclear power, solar and wind, turbine tech, using waste to produce methane to power generators for electricity. But ofc, uneducated cumsluts will deceive people and people will be eager to be deceived.

BD needs quick and cheap sources for its electricity at least for the next four decades. It cannot afford other expensive options like nuclear at this stage of economy and solar power will remain elusive for a few decades more because of shortage of land. It is also expensive when battery is used to store power produced in the day time. There is no steady wind in BD sea-shores. We can only reap benefit from cheap sources like coal, oil and gas, at least, for the next few decades. We better do not put cart in front of the horse.
 
.
No govt is not forcing this. Nandipur was run on diesel till now. We still have diesel plants
Diesel plants are easier and quicker to setup. Vs coal and gas which takes 4 years and would require additional infrastructure like jetty, pipelines or LNG terminal

So a good short term measure

They have built Coal and Gas power Plant in record 18 Months in Pakistan with unit cost around 8Min -10Max PKR. Currently Govt has ordered many power plants to change to gas based. Oil based plants were approved by PPP in 90s. which screwed us.

Islamabad: Pakistan which currently produces 60pc of its electricity from furnace oil, will see it being gradually replaced by Liquefied Natural Gas (LNG) as a fuel of choice for power generation purposes.

A proposal has been floated which would see power plants with 40pc efficiency being dropped and more efficient ones be established to replace them under the IPP mechanism. This will result in lower cost electricity being provided to end consumers.


https://profit.pakistantoday.com.pk/2017/08/10/pm-abbasi-calls-for-shift-to-rlng-power-plants/

The first unit has been made operational in a record period of 21 months'

https://propakistani.pk/2017/05/04/haveli-bahadur-shah-power-plant-conducts-first-fire-test/


GE tested their turbine with over 62% efficiency , NESPAK and NPPMCL both companies had worked hard to achieve this milestone ..

Nope diesel is this much expensive . it's same price in Pakistan.

Only reason why we end up paying 12 rs(18rs at high time ) is that 1/3 of our power comes from hydro @2 rs /unit and 1/4 from local gas @3-4 rs/unit

That is why in Pakistan we are discarding gradually. Issue we are discussing here is Their Govt has approved now to build oil based power plants. I will never ever allow our govt to build these expensive ones. when we have cheaper alternatives. So here we are talking corruption.
@Nilgiri

BD needs quick and cheap sources for its electricity at least for the next four decades. It cannot afford other expensive options like nuclear at this stage of economy and solar power will remain elusive for a few decades more because of shortage of land. It is also expensive when battery is used to store power produced in the day time. There is no steady wind in BD sea-shores. We can only reap benefit from cheap sources like coal, oil and gas, at least, for the next few decades. We better do not put cart in front of the horse.

You guys should go for coal based or LNG based. A you guys are already building LNG terminal. at 19taka Your govt gonna rip you off. Even Solar is better than this price. better govt should encourage residential houses to go for solar. it will still b cheaper than 19 Taka.
 
.
You guys should go for coal based or LNG based. A you guys are already building LNG terminal. at 19taka Your govt gonna rip you off. Even Solar is better than this price. better govt should encourage residential houses to go for solar. it will still b cheaper than 19 Taka.

For BD it will take many more years to switch to LNG because the LNG terminal capacity may not suffice and related infrastructure have to be built. We currently produce power from natural gas available in the country, though.

For the foreseeable future, BD has to depend on coal, diesel and furnace oil before it can switch to other expensive-to-build sources. All depends on the future strength of economy.
 
.
For BD it will take many more years to switch to LNG because the LNG terminal capacity may not suffice and related infrastructure have to be built. We currently produce power from natural gas available in the country, though.

For the foreseeable future, BD has to depend on coal, diesel and furnace oil before it can switch to other expensive-to-build sources. All depends on the future strength of economy.

Why not for wind or solar or coal it takes very short time. We have donein Pakistan you guys can do it also. It will hurt u guys in longer run. We have learnt our lesson.

I am talking about the plants which they are going to build which will take upto 2 years. You can operataional LNG terminal and Coal Handling port during this time. 2 years are more than enough.
 
.
India building too many coal-fired power plants, researchers claim
04/26/2017
By Tildy Bayar
Features Editor


India’s pipeline of planned coal-fired power plants is set to exceed its power demand and derail its climate ambitions, US researchers have claimed.

In a paper published this week in the American Geophysical Union journal Earth’s Future, researchers from the University of California found that 243 GW of coal-fired generation capacity were under development in India in mid-2016, with an additional 178 GW proposed.

If built, these plants would increase India’s coal-fired power capacity by 123 per cent, the researchers said, and would exceed the nation’s projected future power demand by 2024 if the government also went ahead with its plan to produce at least 40 per cent of its power from non-fossil fuel sources by 2030.
---------------------------------------------------------------------------------------------------

Some delusional Hujuge Bangal type of guys are lamenting about our planned oil-fired power plants when India is still contemplating to build 243,000 mW coal-fired power plants. Power from coal is still very cheap. It is bad for environment, but good for economic emancipation, specially for those countries that are still developing or underdeveloped.

- @bluesky -

First let the Americans reduce the carbon footprint and force their Presidents not to tear away Paris Accord. India is yet to do 100% electrification, then we needs to content with a large middle class whose requirements are rising with their way of life. We need more electricity for that and for rural areas. We will make use of our ample coal reserves for atleast next 2 decades.
 
.
Sorry for base load, nothing beats coal and fossil fuels still. Given BD land constraints, its better off leaving solar and wind to smaller scale micro projects to help dampen out the grid peak/troughs along with import from indian/bhutan/nepal grid. Overall strategy followed by BD govt is not bad (its not great either), they would be advised by a number of energy consultants on it as far as that goes, so I wouldn't be too worried. The real problem lies in the "overhead" BD govt extracts for its inefficiencies (corruption etc) more than anything else. Only when you address that do you have a chance in even thinking of approaching such sector in more non-conventional way.

Nuclear, you simply have little liquidity to push there right now effectively (given gestation period, capital density and initial operation costs, ROI profile and again land costs etc)....in fact if it were up to me the current nuclear project money should have been invested elsewhere, in some form of industrial production in say non-RMG MSME credit loans/tax breaks.

As for turbines and methane use, yes there should be much more done there given BD agricultural production and also Chinese overcapacity in this capital technology. I have been saying for some time now that Chinese liquidity should be used for energy cap projects in BD (where the high interest rates can be met guaranteed given its a base pyramid activity) and industry production should be open market investment (FDI where possible, good loan competition otherwise, but not captive G-G style)....but instead seems to be the reverse (in interest of keeping govt structures static rather than reform-based...and this pressures private players to be unnecessarily dynamic instead of threshold static so they can grow to next level ).



It should make you a public transport fan more than anything else hehe.
Well I love trams. ;)
Yeah. China should, bd govt should try to invest more in waste generated electricity. Especially given you bring up the fact that the land mass is limited.
 
.
সরকারি গ্যারান্টিতে বেসরকারি বিনিয়োগ
Government Grantor for Private Investment

রেন্টাল-কুইক রেন্টালে ঋণ দেবে রাষ্ট্রায়ত্ত ব্যাংক
State Banks to provide Loans for Quick Rental Plants

নিজস্ব প্রতিবেদক | ০১:৪৮:০০ মিনিট, আগস্ট ১৪, ২০১৭
base_1502654043-1.jpg

রেন্টাল-কুইক রেন্টালে ঋণ দেবে রাষ্ট্রায়ত্ত ব্যাংক
ব্যাংক কোম্পানি আইনের সংশোধন নয়, বরং সরকারের গ্যারান্টিতে বিদ্যুৎ খাতে ২০ হাজার কোটি টাকা ঋণ দেয়ার প্রস্তুতি নিচ্ছে ব্যাংকগুলো। সরকারি-বেসরকারি বেশ কয়েকটি ব্যাংকে এরই মধ্যে বিদ্যুৎকেন্দ্র নির্মাণে ঋণ প্রস্তাব জমা পড়েছে। দুই মাসের মধ্যে যাচাই-বাছাই করে রাষ্ট্রায়ত্ত ব্যাংকগুলো অনুমোদন দেবে বলে সংশ্লিষ্ট ব্যাংক সূত্র জানিয়েছে।

বেসরকারি খাতে ১ হাজার ৭৬৮ মেগাওয়াটক্ষমতার ১০টি বিদ্যুৎকেন্দ্র নির্মাণের প্রস্তাব ৯ আগস্ট অনুমোদন দিয়েছে সরকারি ক্রয়-সংক্রান্ত মন্ত্রিসভা কমিটি। বিদ্যুৎকেন্দ্রগুলো নির্মাণ করবে এপিআর এনার্জি, এগ্রিকো ইন্টারন্যাশনাল প্রজেক্টস লিমিটেড, বাংলা ট্র্যাক লিমিটেড, কনফিডেন্স পাওয়ার হোল্ডিংস লিমিটেড, দেশ এনার্জি, মিডল্যান্ড পাওয়ার, ওরিয়ন পাওয়ার মেঘনাঘাট এবং সামিট করপোরেশন ও সামিট পাওয়ারের কনসোর্টিয়াম। এসব প্রতিষ্ঠান সরকারি-বেসরকারি বিভিন্ন ব্যাংকে ঋণ আবেদন জমা দিয়েছে।

এসব বিদ্যুৎকেন্দ্রে বিনিয়োগে বেসরকারি ব্যাংকগুলোর খুব বেশি আগ্রহ না থাকলেও অতি উত্সাহী রাষ্ট্রায়ত্ত ব্যাংকগুলো। যদিও রাষ্ট্রায়ত্ত ব্যাংকগুলোর অবস্থা বেশ নাজুক। মূলধন হিসেবে গত আট বছরে সাড়ে ১৪ হাজার কোটি টাকা জোগান দিয়েছে সরকার। গত অর্থবছরও জোগান দেয়া হয়েছে প্রায় ২ হাজার কোটি টাকা। মূলধন ঘাটতি মেটাতে বন্ডের মাধ্যমে আরো প্রায় ১৫ হাজার কোটি টাকা চেয়েছে ব্যাংকগুলো।

১০০ মেগাওয়াট করে দুটি ও ২০০ মেগাওয়াটের একটি বিদ্যুৎকেন্দ্রে বিনিয়োগের প্রস্তাব পেয়েছে রাষ্ট্রায়ত্ত অগ্রণী ব্যাংক। জানতে চাইলে ব্যাংকটির ব্যবস্থাপনা পরিচালক মো. শামস-উল-ইসলাম বণিক বার্তাকে বলেন, এর আগে আটটি বিদ্যুৎকেন্দ্রে অগ্রণী ব্যাংক ঋণ দিয়েছিল। সেগুলোর মধ্যে পাঁচটি এরই মধ্যে সব ঋণ পরিশোধ করেছে। বাকি তিনটির ঋণও নিয়মিত আছে। নতুন করে পাওয়া প্রস্তাবগুলো এখনো প্রাথমিক পর্যায়ে রয়েছে। সরকারের পক্ষ থেকে গ্যারান্টি দেয়ার বিষয়টি প্রস্তাবনায় আছে বলে শুনেছি। ভালো গ্রাহক পেলে আমরা ঋণ দেয়ার বিষয়টি গুরুত্ব দিয়েই বিবেচনা করব।

বিদ্যুৎকেন্দ্র নির্মাণে একাধিক প্রতিষ্ঠান থেকে প্রস্তাব পেয়েছে সোনালী ব্যাংকও। সরকারের নিশ্চয়তায় তারাও ঋণ অনুমোদনের কথা ভাবছে বলে জানান রাষ্ট্রায়ত্ত সোনালী ব্যাংকের ব্যবস্থাপনা পরিচালক ওবায়েদ উল্লাহ্ আল মাসুদ। তিনি বলেন, দেশের ব্যাংকিং খাতে বর্তমানে ১ লাখ কোটি টাকার মতো অতিরিক্ত তারল্য আছে। এর মধ্যে শুধু সোনালী ব্যাংকেরই রয়েছে ৬০ হাজার কোটি টাকা। বেসরকারি অনেক ব্যাংকের কাছে বিনিয়োগ করার মতো অর্থ নেই। এ অবস্থায় বিদ্যুৎকেন্দ্রের মতো বড় প্রকল্পে বিনিয়োগের বেশি সুযোগ রয়েছে সোনালী ব্যাংকের। বড় ঋণের কিছু আবেদন আমাদের কাছে আছে। সরকার গ্যারান্টি দিলে ভালো গ্রাহক দেখে আমরা ঋণ অনুমোদন দেব।

সরকারের নিশ্চয়তায় বিদ্যুৎকেন্দ্র নির্মাণে ঋণ অনুমোদনে প্রস্তুত রাষ্ট্রায়ত্ত রূপালী ব্যাংকও। তবে নতুন করে এখন পর্যন্ত কোনো প্রস্তাব ব্যাংকটি পায়নি বলে জানা গেছে। ওরিয়নের একটি বিদ্যুৎকেন্দ্রে বছরখানেক আগে সোনালী ব্যাংকের সঙ্গে যৌথ বিনিয়োগের প্রস্তাবনা অনুমোদন করা হয়েছিল বলে জানান রূপালী ব্যাংকের এমডি মো. আতাউর রহমান প্রধান।

জানা যায়, গত ২১ জুন ব্যাংকের শীর্ষ নির্বাহীদের নিয়ে সভায় ছয় মাসের মধ্যে বিদ্যুৎ খাতে ২০ হাজার কোটি টাকা ঋণ দিতে ব্যাংকগুলোর প্রতি আহ্বান জানান বিদ্যুৎ প্রতিমন্ত্রী নসরুল হামিদ। কিন্তু বিদ্যমান ব্যাংক কোম্পানি আইন অনুযায়ী বিদ্যুৎ খাতে অল্প সময়ের মধ্যে এ পরিমাণ ঋণ দেয়া অসম্ভব বলে সভায় মন্তব্য করেন ব্যাংকাররা।

আইনি জটিলতা নিরসনে অর্থ মন্ত্রণালয়ের অর্থ বিভাগের অতিরিক্ত সচিব জালাল আহমেদকে আহ্বায়ক করে গত ৪ জুলাই সংশ্লিষ্ট পক্ষগুলোকে নিয়ে একটি কমিটি গঠন করা হয়। ২০ জুলাই অনুষ্ঠিত কমিটির বৈঠকে উপস্থিত সদস্যরা ব্যাংক কোম্পানি আইন সংশোধন না করে সরকারের গ্যারান্টিতে বিদ্যুৎ খাতে ঋণ দেয়ার পক্ষে মত দেন। এক্ষেত্রে বাংলাদেশ ব্যাংকের প্রতিনিধি ব্যাংক কোম্পানি আইনের ২৬খ (৩) ধারা অনুযায়ী ঋণ দেয়ার কথা বলেন। এ ধারা অনুযায়ী, সরকারি নিশ্চয়তা পেলে বাংলাদেশ ব্যাংক কর্তৃক মূলধনের ২৫ শতাংশ ঋণসীমা রাখার বাধ্যবাধকতা থেকে অব্যাহতির সুযোগ রয়েছে। চলতি সপ্তাহেই এ-সংক্রান্ত প্রতিবেদন জমা দেয়ার কথা রয়েছে কমিটির।

অর্থ মন্ত্রণালয়ের আর্থিক প্রতিষ্ঠান বিভাগের জ্যেষ্ঠ সচিব মো. ইউনুসুর রহমান বলেন, বিদ্যুৎকেন্দ্র নির্মাণে ব্যাংকগুলোর অর্থায়নের সঙ্গে অনেকগুলো কর্তৃপক্ষ জড়িত। অর্থ বিভাগের অতিরিক্ত সচিব জালাল আহমেদকে আহ্বায়ক করে একটি কমিটি গঠন করা হয়েছে। তারা এরই মধ্যে কার্যক্রম শুরু করেছে। কমিটির প্রতিবেদনের ভিত্তিতে এ ব্যাপারে চূড়ান্ত সিদ্ধান্ত নেয়া হবে।

তবে দেশে রেন্টাল ও কুইক রেন্টাল বিদ্যুৎকেন্দ্রে বিনিয়োগের অভিজ্ঞতা সুখকর নয় বলে জানান ব্যাংক নির্বাহীদের সংগঠন অ্যাসোসিয়েশন অব ব্যাংকার্স বাংলাদেশের (এবিবি) চেয়ারম্যান ও মিউচুয়াল ট্রাস্ট ব্যাংকের ব্যবস্থাপনা পরিচালক আনিস এ খান। বণিক বার্তাকে তিনি বলেন, এর আগে অনুমোদন পাওয়া বেশ কয়েকটি বিদ্যুৎকেন্দ্রে দেয়া ঋণ খেলাপি হয়ে গেছে। বিদ্যুৎ উত্পাদনের অভিজ্ঞতা নেই, এমন অনেক প্রতিষ্ঠান ওই সময় রেন্টাল-কুইক রেন্টাল বিদ্যুৎকেন্দ্র অনুমোদন পেয়েছিল। ওইসব প্রতিষ্ঠান ঋণ পরিশোধ করতে পারছে না। একাধিকবার পুনঃতফসিল করেও ঋণের অর্থ আদায় করা যাচ্ছে না। নতুন করে বিদ্যুৎকেন্দ্রে বিনিয়োগের আগে ব্যাংকগুলোকে এসব বিষয় ভাবতে হবে।

নতুন অনুমোদনপ্রাপ্ত বিদ্যুৎকেন্দ্রগুলোর দুটি নির্মাণ হবে ঢাকার কেরানীগঞ্জে। এর একটি স্থাপন করবে এপিআর এনার্জি ও এগ্রিকো ইন্টারন্যাশনাল প্রজেক্টস লিমিটেড। এছাড়া বাংলা ট্র্যাক লিমিটেডের যশোরের নওয়াপাড়ায় ১০০ মেগাওয়াট ও কুমিল্লার দাউদকান্দিতে ২০০ মেগাওয়াটের এইচএসডিভিত্তিক দুটি বিদ্যুৎকেন্দ্রের অনুমোদন পেয়েছে। ডিজেলচালিত এসব কেন্দ্র হবে পাঁচ বছর মেয়াদি। অনুমোদন দেয়া বাকি ছয়টি কেন্দ্র হবে এইচএফওভিত্তিক ও ১৫ বছর মেয়াদি। এর মধ্যে বগুড়ায় কনফিডেন্স পাওয়ার হোল্ডিংস লিমিটেড ১১৩ মেগাওয়াট, চাঁদপুরে দেশ এনার্জি ২০০, ব্রাহ্মণবাড়িয়ায় মিডল্যান্ড পাওয়ার ১৫০, খুলনার লবণচরায় ওরিয়ন পাওয়ার মেঘনাঘাট ১০৫ এবং গাজীপুরের কড্ডায় সামিট করপোরেশন ও সামিট পাওয়ার কনসোর্টিয়াম ৩০০ মেগাওয়াট বিদ্যুৎকেন্দ্র স্থাপন করবে।
http://bonikbarta.net/bangla/news/2...কুইক-রেন্টালে-ঋণ-দেবে-রাষ্ট্রায়ত্ত-ব্যাংক--/
 
.
First let the Americans reduce the carbon footprint and force their Presidents not to tear away Paris Accord. India is yet to do 100% electrification, then we needs to content with a large middle class whose requirements are rising with their way of life. We need more electricity for that and for rural areas. We will make use of our ample coal reserves for at least next 2 decades.

We have to worry more about the offenders in our own vicinity and not America, a far away land. Here China and India are the two largest producers of CO2, which has been destroying our ecology including Sunderbans. Now, India is planning to build so many coal-fired power plants that it will cause us suffer from an ecological disaster. However, India itself will suffer equally.
 
.
সরকারি গ্যারান্টিতে বেসরকারি বিনিয়োগ
Government Grantor for Private Investment

রেন্টাল-কুইক রেন্টালে ঋণ দেবে রাষ্ট্রায়ত্ত ব্যাংক
State Banks to provide Loans for Quick Rental Plants

নিজস্ব প্রতিবেদক | ০১:৪৮:০০ মিনিট, আগস্ট ১৪, ২০১৭
base_1502654043-1.jpg

রেন্টাল-কুইক রেন্টালে ঋণ দেবে রাষ্ট্রায়ত্ত ব্যাংক
ব্যাংক কোম্পানি আইনের সংশোধন নয়, বরং সরকারের গ্যারান্টিতে বিদ্যুৎ খাতে ২০ হাজার কোটি টাকা ঋণ দেয়ার প্রস্তুতি নিচ্ছে ব্যাংকগুলো। সরকারি-বেসরকারি বেশ কয়েকটি ব্যাংকে এরই মধ্যে বিদ্যুৎকেন্দ্র নির্মাণে ঋণ প্রস্তাব জমা পড়েছে। দুই মাসের মধ্যে যাচাই-বাছাই করে রাষ্ট্রায়ত্ত ব্যাংকগুলো অনুমোদন দেবে বলে সংশ্লিষ্ট ব্যাংক সূত্র জানিয়েছে।

বেসরকারি খাতে ১ হাজার ৭৬৮ মেগাওয়াটক্ষমতার ১০টি বিদ্যুৎকেন্দ্র নির্মাণের প্রস্তাব ৯ আগস্ট অনুমোদন দিয়েছে সরকারি ক্রয়-সংক্রান্ত মন্ত্রিসভা কমিটি। বিদ্যুৎকেন্দ্রগুলো নির্মাণ করবে এপিআর এনার্জি, এগ্রিকো ইন্টারন্যাশনাল প্রজেক্টস লিমিটেড, বাংলা ট্র্যাক লিমিটেড, কনফিডেন্স পাওয়ার হোল্ডিংস লিমিটেড, দেশ এনার্জি, মিডল্যান্ড পাওয়ার, ওরিয়ন পাওয়ার মেঘনাঘাট এবং সামিট করপোরেশন ও সামিট পাওয়ারের কনসোর্টিয়াম। এসব প্রতিষ্ঠান সরকারি-বেসরকারি বিভিন্ন ব্যাংকে ঋণ আবেদন জমা দিয়েছে।

এসব বিদ্যুৎকেন্দ্রে বিনিয়োগে বেসরকারি ব্যাংকগুলোর খুব বেশি আগ্রহ না থাকলেও অতি উত্সাহী রাষ্ট্রায়ত্ত ব্যাংকগুলো। যদিও রাষ্ট্রায়ত্ত ব্যাংকগুলোর অবস্থা বেশ নাজুক। মূলধন হিসেবে গত আট বছরে সাড়ে ১৪ হাজার কোটি টাকা জোগান দিয়েছে সরকার। গত অর্থবছরও জোগান দেয়া হয়েছে প্রায় ২ হাজার কোটি টাকা। মূলধন ঘাটতি মেটাতে বন্ডের মাধ্যমে আরো প্রায় ১৫ হাজার কোটি টাকা চেয়েছে ব্যাংকগুলো।

১০০ মেগাওয়াট করে দুটি ও ২০০ মেগাওয়াটের একটি বিদ্যুৎকেন্দ্রে বিনিয়োগের প্রস্তাব পেয়েছে রাষ্ট্রায়ত্ত অগ্রণী ব্যাংক। জানতে চাইলে ব্যাংকটির ব্যবস্থাপনা পরিচালক মো. শামস-উল-ইসলাম বণিক বার্তাকে বলেন, এর আগে আটটি বিদ্যুৎকেন্দ্রে অগ্রণী ব্যাংক ঋণ দিয়েছিল। সেগুলোর মধ্যে পাঁচটি এরই মধ্যে সব ঋণ পরিশোধ করেছে। বাকি তিনটির ঋণও নিয়মিত আছে। নতুন করে পাওয়া প্রস্তাবগুলো এখনো প্রাথমিক পর্যায়ে রয়েছে। সরকারের পক্ষ থেকে গ্যারান্টি দেয়ার বিষয়টি প্রস্তাবনায় আছে বলে শুনেছি। ভালো গ্রাহক পেলে আমরা ঋণ দেয়ার বিষয়টি গুরুত্ব দিয়েই বিবেচনা করব।

বিদ্যুৎকেন্দ্র নির্মাণে একাধিক প্রতিষ্ঠান থেকে প্রস্তাব পেয়েছে সোনালী ব্যাংকও। সরকারের নিশ্চয়তায় তারাও ঋণ অনুমোদনের কথা ভাবছে বলে জানান রাষ্ট্রায়ত্ত সোনালী ব্যাংকের ব্যবস্থাপনা পরিচালক ওবায়েদ উল্লাহ্ আল মাসুদ। তিনি বলেন, দেশের ব্যাংকিং খাতে বর্তমানে ১ লাখ কোটি টাকার মতো অতিরিক্ত তারল্য আছে। এর মধ্যে শুধু সোনালী ব্যাংকেরই রয়েছে ৬০ হাজার কোটি টাকা। বেসরকারি অনেক ব্যাংকের কাছে বিনিয়োগ করার মতো অর্থ নেই। এ অবস্থায় বিদ্যুৎকেন্দ্রের মতো বড় প্রকল্পে বিনিয়োগের বেশি সুযোগ রয়েছে সোনালী ব্যাংকের। বড় ঋণের কিছু আবেদন আমাদের কাছে আছে। সরকার গ্যারান্টি দিলে ভালো গ্রাহক দেখে আমরা ঋণ অনুমোদন দেব।

সরকারের নিশ্চয়তায় বিদ্যুৎকেন্দ্র নির্মাণে ঋণ অনুমোদনে প্রস্তুত রাষ্ট্রায়ত্ত রূপালী ব্যাংকও। তবে নতুন করে এখন পর্যন্ত কোনো প্রস্তাব ব্যাংকটি পায়নি বলে জানা গেছে। ওরিয়নের একটি বিদ্যুৎকেন্দ্রে বছরখানেক আগে সোনালী ব্যাংকের সঙ্গে যৌথ বিনিয়োগের প্রস্তাবনা অনুমোদন করা হয়েছিল বলে জানান রূপালী ব্যাংকের এমডি মো. আতাউর রহমান প্রধান।

জানা যায়, গত ২১ জুন ব্যাংকের শীর্ষ নির্বাহীদের নিয়ে সভায় ছয় মাসের মধ্যে বিদ্যুৎ খাতে ২০ হাজার কোটি টাকা ঋণ দিতে ব্যাংকগুলোর প্রতি আহ্বান জানান বিদ্যুৎ প্রতিমন্ত্রী নসরুল হামিদ। কিন্তু বিদ্যমান ব্যাংক কোম্পানি আইন অনুযায়ী বিদ্যুৎ খাতে অল্প সময়ের মধ্যে এ পরিমাণ ঋণ দেয়া অসম্ভব বলে সভায় মন্তব্য করেন ব্যাংকাররা।

আইনি জটিলতা নিরসনে অর্থ মন্ত্রণালয়ের অর্থ বিভাগের অতিরিক্ত সচিব জালাল আহমেদকে আহ্বায়ক করে গত ৪ জুলাই সংশ্লিষ্ট পক্ষগুলোকে নিয়ে একটি কমিটি গঠন করা হয়। ২০ জুলাই অনুষ্ঠিত কমিটির বৈঠকে উপস্থিত সদস্যরা ব্যাংক কোম্পানি আইন সংশোধন না করে সরকারের গ্যারান্টিতে বিদ্যুৎ খাতে ঋণ দেয়ার পক্ষে মত দেন। এক্ষেত্রে বাংলাদেশ ব্যাংকের প্রতিনিধি ব্যাংক কোম্পানি আইনের ২৬খ (৩) ধারা অনুযায়ী ঋণ দেয়ার কথা বলেন। এ ধারা অনুযায়ী, সরকারি নিশ্চয়তা পেলে বাংলাদেশ ব্যাংক কর্তৃক মূলধনের ২৫ শতাংশ ঋণসীমা রাখার বাধ্যবাধকতা থেকে অব্যাহতির সুযোগ রয়েছে। চলতি সপ্তাহেই এ-সংক্রান্ত প্রতিবেদন জমা দেয়ার কথা রয়েছে কমিটির।

অর্থ মন্ত্রণালয়ের আর্থিক প্রতিষ্ঠান বিভাগের জ্যেষ্ঠ সচিব মো. ইউনুসুর রহমান বলেন, বিদ্যুৎকেন্দ্র নির্মাণে ব্যাংকগুলোর অর্থায়নের সঙ্গে অনেকগুলো কর্তৃপক্ষ জড়িত। অর্থ বিভাগের অতিরিক্ত সচিব জালাল আহমেদকে আহ্বায়ক করে একটি কমিটি গঠন করা হয়েছে। তারা এরই মধ্যে কার্যক্রম শুরু করেছে। কমিটির প্রতিবেদনের ভিত্তিতে এ ব্যাপারে চূড়ান্ত সিদ্ধান্ত নেয়া হবে।

তবে দেশে রেন্টাল ও কুইক রেন্টাল বিদ্যুৎকেন্দ্রে বিনিয়োগের অভিজ্ঞতা সুখকর নয় বলে জানান ব্যাংক নির্বাহীদের সংগঠন অ্যাসোসিয়েশন অব ব্যাংকার্স বাংলাদেশের (এবিবি) চেয়ারম্যান ও মিউচুয়াল ট্রাস্ট ব্যাংকের ব্যবস্থাপনা পরিচালক আনিস এ খান। বণিক বার্তাকে তিনি বলেন, এর আগে অনুমোদন পাওয়া বেশ কয়েকটি বিদ্যুৎকেন্দ্রে দেয়া ঋণ খেলাপি হয়ে গেছে। বিদ্যুৎ উত্পাদনের অভিজ্ঞতা নেই, এমন অনেক প্রতিষ্ঠান ওই সময় রেন্টাল-কুইক রেন্টাল বিদ্যুৎকেন্দ্র অনুমোদন পেয়েছিল। ওইসব প্রতিষ্ঠান ঋণ পরিশোধ করতে পারছে না। একাধিকবার পুনঃতফসিল করেও ঋণের অর্থ আদায় করা যাচ্ছে না। নতুন করে বিদ্যুৎকেন্দ্রে বিনিয়োগের আগে ব্যাংকগুলোকে এসব বিষয় ভাবতে হবে।

নতুন অনুমোদনপ্রাপ্ত বিদ্যুৎকেন্দ্রগুলোর দুটি নির্মাণ হবে ঢাকার কেরানীগঞ্জে। এর একটি স্থাপন করবে এপিআর এনার্জি ও এগ্রিকো ইন্টারন্যাশনাল প্রজেক্টস লিমিটেড। এছাড়া বাংলা ট্র্যাক লিমিটেডের যশোরের নওয়াপাড়ায় ১০০ মেগাওয়াট ও কুমিল্লার দাউদকান্দিতে ২০০ মেগাওয়াটের এইচএসডিভিত্তিক দুটি বিদ্যুৎকেন্দ্রের অনুমোদন পেয়েছে। ডিজেলচালিত এসব কেন্দ্র হবে পাঁচ বছর মেয়াদি। অনুমোদন দেয়া বাকি ছয়টি কেন্দ্র হবে এইচএফওভিত্তিক ও ১৫ বছর মেয়াদি। এর মধ্যে বগুড়ায় কনফিডেন্স পাওয়ার হোল্ডিংস লিমিটেড ১১৩ মেগাওয়াট, চাঁদপুরে দেশ এনার্জি ২০০, ব্রাহ্মণবাড়িয়ায় মিডল্যান্ড পাওয়ার ১৫০, খুলনার লবণচরায় ওরিয়ন পাওয়ার মেঘনাঘাট ১০৫ এবং গাজীপুরের কড্ডায় সামিট করপোরেশন ও সামিট পাওয়ার কনসোর্টিয়াম ৩০০ মেগাওয়াট বিদ্যুৎকেন্দ্র স্থাপন করবে।
http://bonikbarta.net/bangla/news/2017-08-14/127783/রেন্টাল-কুইক-রেন্টালে-ঋণ-দেবে-রাষ্ট্রায়ত্ত-ব্যাংক--/

Another level of ruling awami league looting in the name of power plant is underway. These same banks were looted dry by Awami league and then tax payers money were poured in as "capital replenishment". Now, awami looters will loot fresh money from tax payers in the name of "power plant".
 
.