What's new

Energy Projects...Updates

China Three Gorges' II Phase Wind Power Project (2×49.5MW) located in Thatta District, Sindh, has generated total electricity of 550 GWh since commercial operation in 2018, with a total of 230,000 tons coal saving and equivalent to 550,000 metric tons CO2 emissions reduction.


1607091754961.png






1607091783319.png
 
.
The wind turbine towers, which mainly plays a supporting role in the wind power generating set and absorbs the vibration of the unit to ensure the stability of the unit operation.

A brief working flow would be included following working procedure:

Plate pretreatment / edge beveling / roll bending / single shell longitudinal seam welding / pipe flange welding / 1+1 fit up tackle welding / circumferential seam welding / multi section growing line / blasting / painting.




 
.
Construction activities at Powerhouse Site - Suki Kinari Hydropower Project (884MW)

-- Completion Date: Dec, 2022

- Construction cost: $1.9 billion



1607263241603.png





1607263268898.png
 
.
China Three Gorges' II Phase Wind Power Project (2×49.5MW) located in Thatta District, Sindh, has generated total electricity of 550 GWh since commercial operation in 2018, with a total of 230,000 tons coal saving and equivalent to 550,000 metric tons CO2 emissions reduction.


View attachment 693127





View attachment 693128
Aoa. Any idea/ calculation what was the capacity factor achieved?
 
. .
Next-generation KANUPP-2 1100MW nuclear power plant to be fully operational by April 2021 and KANUPP-3 1100MW nuclear power plant by October 2021.

According to PAEC, the KANUPP-2 reactor was loaded with fuel on 1st December 2020 after approval from the Pakistan Nuclear Regulatory Authority (PNRA). Director General Strategic Plans Division (SPD) Lieutenant General Nadeem Zaki Manj, Chairman PAEC Muhammad Naeem, member power committee of the PAEC, and top officials of China graced the occasion with their presence.

The PAEC spokesperson said, “Its construction began in August 2015 and after an operational examination, it will begin producing power from April 2021.” The KANUPP-2 and KANUPP-3 reactor are both third-generation atomic power plants based on the Hualong One reactor units that are supplied by the Chinese. Both of these reactors will have the capability to produce 1100 MW of electricity with KANUPP-3 joining the grid in October 2021. In comparison, the KANUPP-1 power plant had a maximum capacity of just 137 MW.


1607366870398.png
 
.
Next-generation KANUPP-2 1100MW nuclear power plant to be fully operational by April 2021 and KANUPP-3 1100MW nuclear power plant by October 2021.

According to PAEC, the KANUPP-2 reactor was loaded with fuel on 1st December 2020 after approval from the Pakistan Nuclear Regulatory Authority (PNRA). Director General Strategic Plans Division (SPD) Lieutenant General Nadeem Zaki Manj, Chairman PAEC Muhammad Naeem, member power committee of the PAEC, and top officials of China graced the occasion with their presence.

The PAEC spokesperson said, “Its construction began in August 2015 and after an operational examination, it will begin producing power from April 2021.” The KANUPP-2 and KANUPP-3 reactor are both third-generation atomic power plants based on the Hualong One reactor units that are supplied by the Chinese. Both of these reactors will have the capability to produce 1100 MW of electricity with KANUPP-3 joining the grid in October 2021. In comparison, the KANUPP-1 power plant had a maximum capacity of just 137 MW.


View attachment 694048
dasu-munda-tarbela V & KANUPPs will add combined 8000mw of cheap<5 cents power..
very crucial to bring the overall price down..
i hope we can get similar deals on more nuclear plants
 
.
dasu-munda-tarbela V & KANUPPs will add combined 8000mw of cheap<5 cents power..
very crucial to bring the overall price down..
i hope we can get similar deals on more nuclear plants

In the long run the prices will come down. However, in short term, due to capacity payment issues overall price will not come down.
 
.
Under Construction 4320 MW Dasu Hydropower Project.

Dasu Dam Stage 1 Completion: 2025
Power Generation of stage 1: 2160 MW


1607432626782.png






1607432652001.png
 
. .
Under construction Diamer Basha Dam (4500MW)

Installation of Pontoon Bridge on River Indus upstream of dam for transporting equipments and manpower at right bank.



1607531554298.png





1607531608766.png




1607531650418.png
 
.
Pakistan to build Mohmand, Bhasha dams: PM Imran




Pakistan to build Mohmand, Bhasha dams: PM Imran

https://nation.com.pk/NewsSource/web-desk

December 08, 2020


Prime Minister (PM) Imran Khan on Tuesday has said that five decades later after Mangla and Tarbela, Pakistan is going to build two big water dams Mohmand and Bhasha.
The PM said a video of under construction Mohmand Dam on social-networking website Twitter.
 
.
Warsak Dam Peshawar, Panromic View Of Site From The North East, Circa 1958.


1607631991775.png



Photographs of Warsak Hydro-Electric Power Plant and Irrigation Tunnel (Flooding, Dams, Hydro Electricity)

Picture Courtesy - Muhammad Khattak
 
. . .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom