What's new

12 Megaprojects to Go Live in Three Months (Bengali Video)

Mongla port is taking up the slack from over-taxed Chittagong. But Payra and Matarbari are coming up online in another five years. Large dredging project underway is going to help high draft vessels dock at this historic port.

Sonadia was the perfect place to build a deep sea port. But Hasina chose Matarbari instead under Indian pressure.
 
. . .
@saif here are some details on MRT Line-1 underground line from Airport to Kamalapur. They are saying the deepest underground depth will vary from around 30~70 meters.

 
.
MRT-5 has also been formalized with a contract - it will have two portions - North and South lines. This is the 3rd line after Currently active MRT-6 and soon to commence MRT-1.

 
. .
@saif here are some details on MRT Line-1 underground line from Airport to Kamalapur. They are saying the deepest underground depth will vary from around 30~70 meters.

Are we using Japanese technology to build the underground rail system?
 
.
Biman is preparing to utilize facilities in Dhaka's 3rd Airport terminal to expand services and capabilities.

We should establish a pilot training school with the help of BOEING or AIRBUS. This will help reduce pilot shortage.
 
.
Are we using Japanese technology to build the underground rail system?

That is an affirmative.

We should establish a pilot training school with the help of BOEING or AIRBUS. This will help reduce pilot shortage.

That plan has already been mooted - training comes as a package when you buy airplanes like Biman does (instead of leasing them through a leasing company which majority of South Asian airlines do).

Training school locally will be tough because setting up simulators and bringing overseas instructors to local locations is expensive, better to send pilots abroad for certification on specific types of aircraft for now. We do have some simulators set up locally already.
 
Last edited:
. . . . . .
.

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom