What's new

China Pakistan Economic Corridor (CPEC) | Power Plants

.,.,
Glimpses of Construction work on Diamer Basha Dam Project....
Gross water storage: 8.1 MAF
Land to be irrigated: 1.23 million acres
2028 ~ 29

1689256243777.png




1689256174052.png
 
,.,.,.
Construction Highlights on Dasu Hydropower Project
Salient Features:
Installed Capacity: 4320 MW
Annual Gen: 21 billion units
Completion in two Stages

1689774636082.png




1689774682402.png
 
,.,..,.
Construction Highlights on Tarbela 5th Extension Hydropower Project .....
Location: Tunnel No. 5 of Tarbela Dam.
Installed generation capacity: 1530 MW.
Annual energy: 1.347 billion units low-cos.t, green and clean hydel electricity..


1694465777329.png



1694465863672.png



1694465830275.png
 
,..,.,
Construction Progress on Mohmand Dam
Gross Water Storage: 1.2 MAF
Command Area: 18,233 Acres (160,000 acres of existing land will also be supplemented)
Installed Power Generation: 800 MW
Annual Energy: 2.86 Billion Units
CBMs for Locals: Worth Rs. 4.5 Billion
Completion: 2026-27

1695428321545.png



1695428243618.png
 
,..,,.
Construction work continues on all key sites of Dasu Hydropower Project, which is to be completed in two stages.

WAPDA is constructing Stage-I with installed generation capacity of 2160 MW and annual energy generation of 12 billion units.

1695762655809.png




1695762808821.png




1695762834146.png
 
.,.,
Glimpses of Construction work on Diamer Basha Dam Project....
Gross water storage: 8.1 MAF
Land to be irrigated: 1.23 million acres
2028 ~ 29

View attachment 938760



View attachment 938759
Once this dam is completed, and the reservoir is filled, the lake should be large enough (8.1 MAF) that the area around the dam should be developed into a Himalayan “Lake Como” and make it the most attractive alpine mountain and lake resort town. Compared to Lake Como, this reservoir should be somewhere around about 30-40% the size of that lake; decently large enough for all manner of water based attractions.

The revenue could help maintain this dam and increase tourism to the region and the country overall.
 
Last edited:
.,.,.,
Under construction Diamer Basha Dam is a mega multipurpose project with 8.1 MAF gross water storage and 4,500 MW installed power generation capacity.

On completion, the project will irrigate 1.23 million acres land and generate 18 billion units green, clean and low cost hydel electricity per annum. A sum of Rs.78.5 billion is being spent on resettlement of affectees and CBMs in health, education and infrastructure development.

1696113489531.png




1696113530672.png




1696113558088.png
 
.,.,.

The 1530 MW-Tarbela 5th Extension Hydropower Project is a component of green, clean and least-cost energy generation plan, WAPDA is implementing on priority.