What's new

World's largest solar park to light up Pakistan's future

It's good to hear that Pakistan will now have less load shedding that was the bane of industries. Expect production to increase.

However, it will be un-affordable for most as the cost to the consumer would be around Rs20 PKR per unit which is way higher than hydro or thermal. However, economy of scale would be the way to bring costs down, by adding more capacity.

In India the costs are far cheaper due to the amount of solar power generated. As on 30 June 2015, the installed grid connected solar power capacity was 4,060.65 MW, and India expects to install an additional 10,000 MW by 2017, and a total of 100,000 MW by 2022. With this capacity, the costs would become cheaper, at the same level as hydro or thermal power.
https://en.wikipedia.org/wiki/Solar_power_in_India#cite_note-MNRE2012progress-12
 
Its not that am against clean energy but usage of solar panels have two basic disadvantages
1.very expensive i mean its not cost effective
2. doesn't produce the amount of energy actually advertised i mean take this park for example 100MW is its stated production but it actually produces 85 MW.
Instead of venturing into solar power the same amount can be invested in generating hydro electricity which incidentally will be cheap as compared to its solar counterparts
 
2. doesn't produce the amount of energy actually advertised i mean take this park for example 100MW is its stated production but it actually produces 85 MW.

No sir, it's not going to produce annualized average of 85MW. It will produce around 15-20MW.
 
bhai THORA SABAR

time lagta hai jado ka chiragh nahi hai.

aur jitni light hai

USKA SHUKAR.

:enjoy:

bhai jaadu k chiraagh ki bat nhi.. 2 years hogae hain ganjay ko.. or project lagane se current demand/supply ka koi talluq nhi..installed capacity demand se zayeda he hai.. sara masla peson ka hai... or jis hisaab se oil prices neche ai hain circular debt utna he kam speed se ban raha hoga..lkn govt usko b solve karne mai nakaam hai... sirf circular debt ka masla hal rakhe n saray plants chalae to 1 hr ki b loadshedding na ho...
2nd step chori n line losses rokne k liye steps le medium term mai..
abhi sirf long term steps chalrahe yani new power plants...ye hamari future demand k liye hain k demand barhegi to ye kam aenge... lkn jabtak circular debt n line losses ka masla hal nh hota..tab tak ye b bekar hain chahe 50000mw lagalo
 
GOP shall take more steps like local manufacturing of good quality Solar Panels , batteries and inverters with affordable price which will automatically reduce the load on National Grid .
In countries like Australia you can even sold electricity to GOVT .
 
Great but more solar & wind mill power projects are needed. Thar & Balochistan province can also be home to world largest Solar power project & our Norther areas can be home to world largest Wind mill projects.
 
This project provides foundation of Solar park in Pakistan .I agree with above statement fossil fuels are limited and next clean energy is the way to go.
 
There was a news on PDF few days ago that Solar power is banned in pakistan as it is very costly. What is truth?
 
Nice . Our people deserves good life. ..


Still it not in your village so stop jumping :D


These are chinese investment.

But cost of power shall depend on capital investment. If cost of capital is high than cost of power shall also be high. Somebody had quoted in PDF that solar power shall cost Pakistan 22 rs per unit.
 
bhai jaadu k chiraagh ki bat nhi.. 2 years hogae hain ganjay ko.. or project lagane se current demand/supply ka koi talluq nhi..installed capacity demand se zayeda he hai.. sara masla peson ka hai... or jis hisaab se oil prices neche ai hain circular debt utna he kam speed se ban raha hoga..lkn govt usko b solve karne mai nakaam hai... sirf circular debt ka masla hal rakhe n saray plants chalae to 1 hr ki b loadshedding na ho...
2nd step chori n line losses rokne k liye steps le medium term mai..
abhi sirf long term steps chalrahe yani new power plants...ye hamari future demand k liye hain k demand barhegi to ye kam aenge... lkn jabtak circular debt n line losses ka masla hal nh hota..tab tak ye b bekar hain chahe 50000mw lagalo

bhai

circular debt rises due to non payment by government departments this issue will never go away.

chori in line loss the KUNDA system can never end in Pakistan.

Awaam thinks it is WRONG TO PAY METER OF ELECTRICITY. that mind set cannot be changed unless you start imprisoning people.

If government does that there will be protests and tire burning and burning of power stations.

do you think kunda system can be stopped? or circular debt come down to zero?
 
World's largest solar park to light up Pakistan's future
DAWN.COM — PUBLISHED 11 MINUTES AGO
55edca30331bc.jpg

Entrance to Quaid-e-Azam Solar Power Park - Photo courtesy thethirdpole.net
Some 400,000 solar panels, spread over 200 hectares of flat desert, glare defiantly at the sun at what is known as the Quaid-e-Azam Solar Power Park (QASP) in Punjab, named after Pakistan’s founding father, Mohammad Ali Jinnah.

The 100MW photovoltaic cells (PV) solar farm was built by Chinese company Xinjiang SunOasis in just three months, and started selling electricity to the national grid in August.

This is the first energy project under the $46 billion China-Pakistan Economic Corridor (CPEC), a key part of China’s ‘new silk road’, linking the port at Gwadar in southern Pakistan with Kashgar in China’s western region of Xinjiang.

The 100MW plant is the pilot stage of a more ambitious plan to build the world’s largest solar farm. Once completed in 2017, the site could have capacity of 5.2 million PV cells producing as much as 1,000MW of electricity – enough to power about 320,000 households. Construction of the next stage is already underway, led by another Chinese company Zonergy.

55edcbf8bff23.jpg

One of the main access roads inside QASP - Photo courtesy thethirdpole.net
Eighteen months ago, the site was nothing more than wilderness. Now a mini city has emerged in the middle of the desert, with over 2,000 workers accompanied by heavy machinery, power transmission lines, blocks of buildings, water pipes and pylons.

Reducing emissions, providing livelihoods
The Cholistan desert is an ideal spot for solar power, said Muhammad Hassan Askari, operating manager of the solar park. The area gets 13 hours of sunlight every day while the huge expanse of flat desert is ideal for a large commercial project like this one.

The big advantage of solar power, he said, is that a large park can be completed faster than thermal or hydropower projects, which take much longer and require a lot of maintenance.

The solar park will also shrink Pakistan’s carbon footprint, said Najam Ahmed Shah, the chief executive officer of QASP, displacing about 57,500 tonnes of coal burn and reducing emissions by 90,750 tonnes every year.

55edccef68e17.jpg

An aerial view of QASP. - Photo courtesy thethirdpole.net
Pakistan aims to reduce its reliance on hydrocarbons, especially imported coal, oil and gas, to around 60 per cent by 2025 from the present 87pc. The country has a target to produce 10pc of its total energy mix from renewable sources (excluding hydro-power, which already constitutes 15pc of the total energy mix). The current generation from renewable energy is around 1-2pc.

While Pakistan contributes less than 1pc to global Green House Gas (GHG) output, the country’s carbon emissions are growing by 3.9pc a year. By 2020 it will spew out 650 million tonnes of Co2e (carbon dioxide equivalent) if the current trend continues, said climatologist Qamar-uz-Zaman Chaudhry, the UN secretary general’s special advisor for Asia with the World Meteorological Organisation (WMO).

The solar park will also eventually generate 15,000 to 33,000 jobs for locals and attract investment to the region.

Unprecedented scale
Some experts worry the project is too ambitious. Former director general of WWF-Pakistan Ali Hassan Habib, who now runs a company providing rooftop solar solutions, welcomed the project but was uneasy about the government “jumping into untested scale”. The plant will be double the size of the existing largest solar PV generating facilities worldwide, he said.

“It may have been better to build the equivalent remaining 900MW closer to where electricity is consumed — on say the rooftops of large parking lots — rather than installing it in remote locations,” he said.

Environmental impact of clean energy
Because solar energy is still finding a foothold in the energy mix and technologies are evolving, not enough is known about the park’s impact on the environment and natural resources.

55edcde05488e.jpg

An aerial view of QASP. - Photo courtesy thethirdpole.net
Some negative impacts have already become apparent. For example, solar power consumes lots of water. PV panels may require little maintenance, according to QASP, but they need to be kept squeaky clean. An estimated one litre of water is used to clean each panel. Water consumed to clean the eventual 5.2 million panels built will be colossal for a country that is fast becoming water stressed. Currently, 30 people take 10 to 15 days to clean the 400,000 cells.

“This year we’ve been very lucky as there have been unprecedented rains and so panels were cleaned automatically,” said Askari, who said they were looking for more efficient ways to clean panels.

At the same time, increasing human activity will disturb the arid region’s rich biodiversity and wildlife, such as the Indian gazelle, caracal cat and houbara bustard.

The construction of a new road network and supporting commercial activities associated with large solar PV projects do leave a substantial “footprint” on the land, agreed Habib.

Shah justified the project, saying it was built on “uninhabited” “waste” land. “An Initial Environmental Examination was carried out and we got a nod from the Environment Protection Department before embarking upon the project,” he explained.

To offset any negative impact, Habib suggested the government set up an “environment and social fund”.

Environmentalists are also concerned about the fate of the millions of PV panels which will wear out within 25 years. The panels will have to be recycled to extract the silicon used to make them, and then replaced.

Pakistan’s energy crisis
Pakistan has been in the grip of severe energy shortages for many years with some rural areas left without power for up to 20 hours a day. There has been little local or foreign investment in the industrial sector because of the extensive power cuts, and a number of factories have had to close down.

55eebae03104b.jpg

An aerial view of QASP. - Photo courtesy thethirdpole.net
With an installed electricity generation capacity of 22,797MW, the country’s total production stands at just 14,000MW. In recent years, demand has risen to 19,000MW.

While the 1,000MW of solar energy will help ease energy constraints, Askari said government investment in several other hydropower and coal projects should also help alleviate power shortages.

Prime Minister Nawaz Sharif promised power cuts would end by 2018 at the inauguration ceremony of 100MW solar project in May, earlier this year.

Not everyone is happy
But some critics say it is the investors who will get rich from the solar project, while consumers will have to pay more in the long run.

“Hydropower can produce energy for less than half the price of solar and about the same as wind so why a fixation on solar?” said an Islamabad-based energy expert working with the government, who spoke to thethirdpole.net on the condition of anonymity.

He is sceptical of solar for a number of reasons.

First, the solar farm will actually produce far less than the much touted 1,000MW of electricity. “On average, solar power plants deliver only about 20pc of installed capacity, and the peak production is during the day, while the peak demand is in the evening when the plant does not produce anything,” the expert pointed out.

55eebcfb0fcfb.jpg

Quaid-e-Azam Solar Power Park - Photo courtesy thethirdpole.net
Alternative arrangements have to be made to draw upon hydro or thermal sources at an “extra cost”. But the project’s owners say the 100MW solar plant could produce near to capacity at 85MW at its peak.

Second, solar energy is more expensive than other energy sources. QASP claims it is selling solar power to the grid at $0.14 per unit. Sources within the National Transmission and Dispatch Company (NTDC) say they have signed a deal to buy electricity at $0.24 per unit, which will drop later to perhaps $0.17 per unit after a period of seven years when loans are paid off. In either case, this price is far higher than the $0.07 for hydropower, $0.11 for fuel oil and $0.12 for imported LNG.

“And these figures are only for generation; another 25pc must be added to it for cost of delivery to be borne by the consumer, accounting for losses and theft,” he pointed out.

“The financial justification for solar was approved when oil prices were at $110 a barrel,” he said, lamenting that the government refused to heed to advice that oil prices would drop.

Others argue that solar prices will fall over time, making it competitive. Vaqar Ahmed, deputy executive director at the Islamabad-based think tank, Sustainable Development Policy Institute, said: “For every new technology the fixed costs are higher in the initial years and diminish over time as economies of scale are achieved.” And learning from China, efficiency will rise and prices for solar cells will continue to fall, he said.

Wind could be a much bigger contributor to Pakistan’s energy need, said WWF’s Habib, given its potential of 120,000MW. “Unlike solar, wind energy maintains production at night,” he pointed out.

Political risks
With just a little over two years left in his term, the success of the solar project is important for Prime Minister Nawaz Sharif.

“The project has huge political implications for the ruling Pakistan Muslim League (N),” said Lieutenant Colonel (Ret) M Hassan Malik, who is responsible for the security arrangements of the entire QASP area.

55eebe1db3cc9.jpg

An aerial view of QASP. - Photo courtesy thethirdpole.net
”Through this project the government also wants to send out the message to the outside world that it has the capacity to undertake mega projects and will provide foolproof security to investors.”

Working in an area known as a hotbed of criminals and extremists, Malik’s job is challenging. “Not only is the park a national asset, we have foreign nationals working at the plant, so the sensitivity is two-fold,” he said.

There are 800 to 900 men guarding the site, where around 400 Chinese workers and over 2,000 labourers work at any given time.

Cultural shock
For Alexander Halbich, a German engineer who has been at the park for over a year, getting used to “gun-toting” security men following him around was most disconcerting aspect of his new job. “The food is good, the people are extremely hospitable and we do go out to the city once in a while tailed by armed guards, but there is little to do after dark,” he added.

“There isn’t much to do in the evenings,” agreed Muhammad Hasan Askari, who heads the technical team. Hailing from Lahore, he keeps himself busy with work and looks forward to going home at the weekends.

Foreign workers get to go home less often. “I go every three months for ten days or more,” said Zhang Ting, a young Chinese engineer. “I’m quite ready to go home by two months but when I do go back, I miss Pakistan and the work,” she added.

Ting had to deal with a language barrier and hostile weather when she arrived to work at the site. The Chinese engineer also had to adjust to a “whole new work culture”.

“We resolved the issue by getting more Pakistanis on our design team to crease out the differences and conflicts,” she said.

55eebf07e516b.jpg

View of the infrastructure developed alogside the solar park to connect it to the national grid. -Photo courtesy thethirdpole.net
This article was originally published on The Third Pole and has been reproduced with permission.
This is freaking awesome....The scale, the size...its amazing. Hats off.
 
Back
Top Bottom