Insight into how urgently the U.S. Air Force wants to field a hypersonic strike weapon has emerged even as Lockheed Martin officially acknowledges the April award of a potential $928 million contract to develop the air-launched missile.
In a document justifying its decision to award a single contract to develop the Hypersonic Conventional Strike Weapon (HCSW) after only a limited competition, the Air Force says it plans to conduct the critical design review (CDR) just 24 months after contract award, at the end of fiscal 2019. Early operational capability of the Mach 5-plus missile on an existing fighter/bomber aircraft is scheduled for fiscal 2022.
http://aviationweek.com/defense/loc...m=email&elq2=1cb8397aee264022947a90d0061175fe
In a document justifying its decision to award a single contract to develop the Hypersonic Conventional Strike Weapon (HCSW) after only a limited competition, the Air Force says it plans to conduct the critical design review (CDR) just 24 months after contract award, at the end of fiscal 2019. Early operational capability of the Mach 5-plus missile on an existing fighter/bomber aircraft is scheduled for fiscal 2022.
http://aviationweek.com/defense/loc...m=email&elq2=1cb8397aee264022947a90d0061175fe