What's new

Second 100 days defence industry action plan

cabatli_53

ELITE MEMBER
Joined
Feb 20, 2008
Messages
12,808
Reaction score
62
Country
Turkey
Location
Turkey
1C0D8F0A-8FCA-4B52-AE64-EC5F6AD6B14F.jpeg
7C93E7D2-C432-472C-9994-60682D3E1179.jpeg
82F23939-A8C2-4EAA-9555-8C8EA81CC1A6.jpeg
C2612261-32FF-4E6C-96E4-FC7B511A31FE.jpeg
 
.
SSB-01: Establishment of the Laser Excellence Center , determination of the program model for the development of Laser Weapon System.
SSB-02: Determination of current capabilities for the development of Electromagnetic Launch System and competency analysis.
SSB-03: Signing of Improved ATAK Project.
SSB-04: Determination of Turboshaft Engine's sub-system (compressor, combustion chamber, gas generator, power turbine etc.) configurations and contractors.
SSB-05: Completion of the conceptual design of transmission (gearbox and drivetrain) under the National Power Group UTKU Project developed for use in armored vehicles.
SSB-06: Signing of critical subsystem contracts including indigenous engine group within the scope of ALTAY Serial Production Project.
SSB-07: Signing of MİLGEM "İ" class frigate (5th ship of the program) contract.
SSB-08: Increasing the number of M60TM to 146 with the modernization of 7 tanks within the scope of FIRAT-M60T Project.
SSB-09: Signing a contract to add 415 additional precision-guided Stand-Off Ammunition (SOM) to inventory.
SSB-10: Completion of the acceptance of the final delivery of the B (BORA) Missile Project.
SSB-11: Performing acceptance tests within the scope of Naval Multifunction Phased Array Radar (ÇAFRAD) Phase-1 Project, installation of the system and performing tests with guided ammunition using the system.
SSB-12: Contract signing for Special Purpose Tactical Wheeled Armored Vehicles (ÖMTTZA) Project.
SSB-13: Contract signing for 360-Degree Situational Awareness System Procurement Project.
SSB-14: Delivery of 255 vehicles of different types within the scope of armored vehicle projects.
SSB-15: Delivery of 5 additional Tactical UAV (Bayraktar TB-2) .
SSB-16: Delivery of 2 additional Operative UAV (ANKA-S) .
SSB-17: Micro-Satellite Launch System Development Project contract execution, project schedule, work sharing and subcontractor distribution.
SSB-18: Tender of the Combined Multi-Mini Satellite Development Project.
SSB-19: Starting of Surface-to-Surface Mid-Range Missile project .
SSB-20: Delivery of 200 units of Mini Smart Ammunition (MAM) within the scope of UMTAS Project.
SSB-21: Start the mass production activities within the scope of the Surface-to-Surface Guided Ammunition (ATMACA) Project.
SSB-23: Installation of 3 base areas within the scope of Modular Military Base Area Project, increasing the total number of base regions to 32.
SSB-24: Contract signing of the New Generation Basic Training Aircraft Simulator (HÜRSİM) Project.
SSB-25: Launching development activities of National AESA Radar for F-16 Aircrafts.
SSB-26: Contract signing within the scope of 20 mm Main Gun Development Project, realizing the work sharing for the development activity and determining project calendar.
SSB-27: Delivery of at least 60 additional precision guidance kits of various types.
SSB-28: Modernization of weapons currently used by artillery and mortars and projecting development activity for increasing the precision of shot by providing KKS (Global Positioning System) guidance feature to ammunition.
SSB-29: Delivery of at least 18.000 "Indigenous Pistols" under scope of METE.
SSB-30: Contracting at least 40,000 additional MPT-76s.
SSB-31: 125 units of rifle type Drone / Mini UAV jamming system delivery and signing of EGM Backpack, Vehicle and Bag Type jammer System Procurement Project contract.
SSB-32: Signing the contract for the Project, which will ensure the detection and destruction of IEDs with high power microwave technology.
SSB-33: Completion of critical design within the scope of Emergency Response and Dive Training Boat Supply Project.
SSB-34: Start of fast patrol boat deliveries.
SSB-35: Completion of the 7th Main Jet Base Construction Activities within the scope of F-35 Procurement Project.
SSB-36: Completion of the feasibility studies of the Regional Positioning and Timing System (BKZS).
SSB-37: Continue to field tests and starting deliveries of light / medium class unmanned land vehicles projects .
SSB-38: Tender for unmanned land vehicles project initiated in heavy class, perform demonstration testing to obtain user evaluations in accordance with the available capabilities.
SSB-39: Delivery of 2 helicopters within the scope of ATAK T129 Attack and Tactical Reconnaissance Helicopter Project.
SSB-40: Signing contract of AKINCI UAV Project.
SSB-41: Signing contract for the Co-ordination of the UAVs and the Recon Coordination Center (MIKOM) Project.
SSB-42: Evaluation of 117 SAGA applications and signing of contracts within the scope of development of artificial intelligence and robotics technologies.
SSB-43: Signing of the GENIUS Project contract that was initiated to optimize pilot behavior in pilot trainings.
SSB-44: Signing of contract for conversion of 4,5G network to 5G within the scope of ÇINAR Project.
SSB-45: Development of National Base Station (ULAK) Project, switching to live network and product launch.
SSB-46: Development of Microorganism Based Explosive Detection and Diagnostics Technologies (BİRMO) Completion of Technology Obligation Project.
SSB-47: Completion of system integration tests at laboratory level in Net Centric Data Link Development (KEMENT) Project .
SSB-52: Launching the UAV Swarming Technology Development Project.
 
Last edited:
. . .
So number 25 means they have finished the research and are going to development:-).
 
.
correct me if I misunderstand, but by the next 100 days, these things will be done right, so TSK will receive 5 TB-2 in 100 days ?

If that is the case then it's truly impressive. but perhaps it's suppose to be understood in a different way, that SSM will take steps in the above mentioned areas.
 
.
STB-04 is my favorite. Raising R&D and design bureau facilities by 10% each.
As well as STB-19, establishment of 'InvesTR high technology fund' for the funding of high technology projects.
 
.
I like: AESA for F-16s, medium range ballistic missile, guided mortar and artillery shells.
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom